Tag Archives: Ryerson University Student Learning Centre

Public meeting tomorrow for Ryerson University’s Student Learning Centre development plan

Ryerson University Student Learning Centre

An illustration of the new Ryerson University Student Learning Centre appears on this sign at the building site at the NE corner of Yonge and Gould Streets

 

Ryerson University Student Learning Centre

Statutory public meeting notice at the development site

 

Ryerson ready to roll:  Construction of the new Ryerson University Student Learning Centre could begin within weeks if the development plan gets approval, as is widely expected, during two key meetings at Toronto City Hall this month. The university’s proposal is being reviewed by Toronto and East York Community Council tomorrow morning and, depending upon what’s decided there, could get the final go-ahead from City Council at its meeting on November 29.

City planners have recommended approval for the municipal zoning bylaw amendments that would be required to permit the project to proceed. In an October 12 2011 staff report, they wrote that the new Student Learning Centre will provide “a unique architectural contribution to Yonge Street, and a gateway to Ryerson University, increasing its presence and visibility on Yonge Street. It will revitalize a section of Yonge Street currently the site of a vacant lot, provide necessary student space to a growing student population, add minimal new shadow to Yonge Street and provide retail space in accordance with Official Plan Policies.”

The university has already applied for shoring and excavation permits, and expects them to be approved in December. Construction could then quickly commence on the 9-storey, 155,464 square foot building, which will rise on the northeast corner of Yonge and Gould Streets (the official municipal address is 341-355 Yonge Street). The university hopes will be completed and ready for occupancy during the winter of 2014. Designed by Toronto’s Zeidler Partnership Architects and Snøhetta of Oslo and New York City, the facility will cost an estimated $112 million. The Ontario government is providing $45 million, while the university is kicking in another $45 million itself. Fundraising will seek to top up the $22 million balance.

 

‘A bold step in city building’

Ryerson unveiled artistic illustrations of the Student Learning Centre to much fanfare in April of this year. At the time, the university said its “stunning new building” will not only “provide Ryerson students with an outstanding environment to study, collaborate and discover,” but also will be “a transformative, bold development and an important step forward in city building.”

Although the university received considerable praise for Zeidler and Snøhetta’s daring and dazzling design, the contemporary architecture drew its share of criticism. As city planners noted in their October 12 report, the design received a mixed reaction from residents and neighbourhood business owners who attended a May 4 2011 community consultation meeting, “with some liking it and others feeling that it did not fit into the context of Yonge Street even if they approved of the overall design. The principal objections were to the size and location of the retail space. Many felt that the amount of retail provided at-grade was not sufficient and that the below-grade retail would not function as desired. Other issues raised were the height and massing of the building, especially as it relates to context and shadow impacts, lack of parking, a discussion on the location of the second TTC exit from Dundas subway station, and encroachments upon the City laneway.”

 

Insufficient retail space?

Planners also received five letters that outlined opposition to the Ryerson proposal, generally on the grounds that “that the design was not compatible with Yonge Street, and that the provision of retail was insufficient. Some felt that the design was interesting and would support it in another area of the City. The Downtown Yonge BIA, in particular, sought a significant redesign of the proposed structure to bring it into conformity with the existing zoning bylaw and supply significantly more retail.” On the other hand, Cadillac-Fairview Corporation, owner of the Toronto Eaton Centre just one block south on Yonge Street, sent planners a letter  “which lauded the design and the development of a vacant parcel of land on Yonge Street.”

For their part, city planners concluded that the proposed retail component for the Student Learning Centre actually does satisfy official city policies. “The primary purpose of this building is to function as a learning, meeting and research space for the student body and an important public building,” they pointed out. “Retail, although the primary function along Yonge Street, is a secondary function of the proposed building.”

 

‘Landmark architecture’

Moreover, “the Official Plan encourages the creation of landmark buildings through the Yonge Dundas Redevelopment project,” the planners noted. “The Ryerson Student Learning Centre qualifies as a landmark architectural building and the changes brought to the area place a new emphasis on Gould Street as the entrance to Ryerson. Although the plan encourages that buildings respect the traditional built form characteristics of Yonge Street, it directs any specific change to the Yonge and Dundas area. The Ryerson Student Learning Centre represents a rational extension of the Yonge and Dundas redevelopment as it is in close proximity to the AMC Theatre complex formally known as Toronto Life Square, separated only by an empty parcel of land which once contained the Empress Hotel.”

But the planners were quick to caution that since the Student Learning Centre has a special status “given the important investment in public infrastructure this building represents,” their recommendation to approve the project should not be viewed as suggesting that the City is opening the door to similar contemporary development along Yonge Street.

 

‘No precedent for further redevelopment’

“The Ryerson Student Learning Centre represents an important institutional investment for Toronto and Ryerson University. It provides a gateway to Ryerson University, a unique architectural experience and much needed reinvestment. By providing retail at grade, the Ryerson Student Learning Centre will also help animate Yonge Street as well as providing space for students. Due to its proximity to Yonge and Dundas Square, its institutional use, the lack of significant shadow impact, the location as a gateway to Ryerson University and the built form context, this unique building should not be considered a precedent for further redevelopment on Yonge Street. City Planning Staff find that the proposed building and the rezoning required for its construction is in the public interest and constitutes good planning.”

The Student Learning Centre project is one of numerous items on tomorrow’s agenda for the Toronto and East York Community Council. The public meeting starts at 10 a.m. in Committee Room 1 at City Hall.

Below are photos of the Student Learning Centre site this morning as well as a rendering, from the Ryerson University website, suggesting how the centre’s retail facade on Yonge Street will look. Renderings of the building interior can be viewed in my April 8 2011 post about the project, while earlier photos of the building site — including the iconic Sam the Record Man store that previously occupied the property — can be viewed in my February 15 2011 post.

 

Ryerson University Student Learning Centre

This rendering depicts the building’s retail facade along Yonge Street. The rendering is by Labtop USA Corp / Zeidler Snøhetta.

 

Ryerson Student Learning Centre site

November 1 2011: Ryerson Student Learning Centre site viewed from Gould Street at O’Keefe Lane, looking northwest across Yonge Street

 

Ryerson University Student Learning Centre site

November 1 2011: The Ryerson property is close to two other major construction sites. Cranes for the new SickKids Research and Learning Tower on Bay Street are visible at left rear, while cranes for the 75-storey Aura condominium tower at Yonge & Gerrard Streets are visible at right.

 

Ryerson University Student Learning Centre

November 1 2011: Looking north across the Ryerson University Student Learning Centre site from the southwest corner of Yonge and Gould Streets

 

Ryerson University Student Learning Centre

November 1 2011: The Student Learning Centre will have underground and above-grade connections to the existing Ryerson University Library building (right)

 

Ryerson University Student Learning Centre

September 3 2011: Looking north from Gould Street at the strip of retail shops along the west side of Yonge Street, opposite the Student Learning Centre site

 

Elm Street between Yonge & Bay Streets Toronto

March 7 2011: Looking east along Elm Street toward the Student Learning Centre site. The new 9-storey building will dominate this sightline, rising directly in front of the concrete Ryerson University Library building. Like the library, the centre will be 51 meters tall (including mechanical equipment).

 

Ryerson U’s sensational new Student Learning Centre will bring sparkle to the Yonge Street strip

Ryerson University Student Learning Centre

This rendering suggests how the Ryerson University Student Learning Centre will appear when viewed looking north on Yonge Street near Gould Street

 

Campus showpiece: I envy the students who will get to study and relax in the marvellous Student Learning Centre that Ryerson University unveiled this week and will begin constructing later this year. I spent six years of my life studying in university libraries and classroom buildings that were bleak, bunker-like structures with few windows allowing natural light inside. They were drab, dreary places to learn, and I often dreaded going inside. Even lounge and food service areas tended to be dim, dull and depressing — taking a break for a coffee or chat with friends just meant moving from one boring, bland building to another equally cheerless space. Ryerson’s Student Learning Centre promises to be the polar opposite.  Designed by Toronto’s Zeidler Partnership Architects and Snøhetta of Oslo and New York City, the building will be breathtaking on the outside, its flashy glass facade adding architectural excitement and sparkle to the busy Yonge Street strip between Dundas and Gerrard Streets. With a dramatic stepped plaza entrance and transparent glass walls bearing dazzling designs, the Student Learning Centre will bring tremendous visual interest to a streetcorner previously made famous by the long-gone Sam the Record Man store’s iconic neon signs. I wouldn’t be surprised if the building’s startling shape and skin slows or even stops traffic on Yonge — stunning contemporary architecture isn’t something Torontonians expect to encounter on a commercial strip characterized by boxy, unattractive buildings plastered with brilliant electronic billboards and enormous advertising posters.

The Student Learning Centre’s interior will be just as sensational. Inside, a cavernous light-filled lobby with an impressive, wide staircase will wow visitors, while upper levels of the eight-storey structure will offer huge bright spaces for study and socializing. “The Student Learning Centre will provide bright, open, technologically rich, barrier-free spaces for individual and collaborative study that will accommodate our students’ different learning styles and our faculties’ different teaching practices,” Ryerson’s Provost and Vice President Academic, Alan Shepard, said in a press release announcing the building design. The Centre will be linked by a bridge to the university’s existing library next door, will have learning and study spaces in a variety of different sizes and designs on its upper floors, and will have retail space both along Yonge and on one floor below street level. Each floor will have a unique personality — “some will be open and interpretive with flexible furniture and terraces, while others will be densely filled with enclosed study rooms for groups of four to eight people. Space will be available for independent, quiet study and contemplation. With full digital support and accessible academic services, the Student Learning Centre will foster learning success and help promote a culture of collaboration and creativity among Ryerson students,” the news release explains.

Besides becoming the architectural showpiece of the university campus, the Centre is bound to have a significant impact on the city, too. Ryerson president Sheldon Levy says the Centre will be ” a transformative, bold development and an important step forward in city building.” And there’s no doubt it will give the university’s campus, much of which is largely hidden from view between Yonge and Church Streets, an unprecedented presence and highly influential profile on the city’s main street. Zeidler Architects senior partner Tarek El-Khatib anticipates that the Student Learning Centre “will contribute to the retail and pedestrian life in the area and set the tone for ongoing revitalization in this historic commercial neighbourhood. A generous and inviting, entry plaza will gently draw both students and the general public up and into this new vertical community setting the standard for future development in the area.”

That’s something I’m personally looking forward to. I don’t particularly enjoy walking along Yonge between Dundas and College Streets; I find the sidewalks too narrow and crowded, while the retail shops and restaurants are geared to a much younger demographic — there’s practically nothing there to catch my interest and make me want to linger. I either hurry past, or avoid the strip altogether by walking up Bay Street or cutting through the Ryerson campus. But the Student Learning Centre at Gould Street, along with the Aura condo and retail complex two blocks north at Gerrard, could well become catalysts for major improvements and enhancements to the area. In a few years’ time, I just might enjoy spending time on Yonge Street once again.

Construction of the Student Learning Centre is scheduled to begin by the end of this year, with completion anticipated for 2014. Full project details are available on the media page of the Ryerson University website. The Toronto Star’s architecture and urban issues specialist, Christopher Hume, discusses the design in his April 6 2011 column, while Globe & Mail writer Omair Quadri describes the project in an April 6 2011 article in that newspaper. Below are several artistic renderings depicting some of the Student Learning Centre’s signature interior and exterior design features.

 

Ryerson University Student Learning Centre

The Student Learning Centre will feature an impressive and dramatic stepped plaza entrance at the corner of Yonge & Gould Streets

Ryerson University Student Learning Centre

The Centre’s lobby will be cavernous, but streaming with natural light

 

Ryerson University Student Learning Centre

One of the “flexible” study spaces on an upper level of the Centre

 

Ryerson University Student Learning Centre

One of the Centre’s cheery and bright open study spaces

 

Ryerson University Student Learning Centre

This illustration outlines the interior layout of the 8-storey building

 

 

Yonge St. site ready for excavation … but when will Ryerson reveal student learning centre design?

Ryerson University Student Learning Centre

Ryerson University sign at the corner of Yonge and Gould Streets


Site’s all set: It was a year ago this week that Ryerson University announced it had selected the architecture team for the new 10-storey Student Learning Centre (SLC) it plans to build at the corner of Yonge and Gould Streets on the former site of the famous Sam The Record Man store. 

During the past couple of months, I have seen small contracting crews on the SLC site, clearing rubble and doing what appeared to be minor pre-construction site preparation work. This afternoon, the property was empty, virtually clear of debris, vehicles and heavy machinery. The site looks like it’s all set for excavation, so I’m wondering if the university may soon reveal the SLC design, and start digging.

I’m sure the whole process has been held up by events during the last two months on the south side of Gould Street, where the historic Empress Hotel building at 335 Yonge Street burned down in a fire that investigators determined was caused by arson. I’m pissed that 335 Yonge was neglected and allowed to languish, and I’m even more angry that the building had to be demolished because of the irreparable damage it suffered both from the fire and subsequent investigation procedures. Now that the beautiful heritage building is gone forever, I hope the property lands in Ryerson’s hands, so the site can be developed into an impressive Yonge Street gateway to the university’s downtown campus. (I definitely don’t want to see 335 Yonge’s owners get city approval to build a condo tower there.)

It was on February 10 last year that the university said it had picked Zeidler Partnership Architects of Toronto and Snøhetta of Oslo and New York City to be co-architects for the 160,000 square foot learning centre, a high-tech library and learning environment connected to the university’s existing library building. Ryerson is hoping the SLC can also be linked to the Yonge subway line by its own on-site entrance to the Dundas subway station. 

According to the university, “[t]he state-of-the-art Student Learning Centre will provide the latest technology and will be designed to accommodate different learning styles and teaching practices. The SLC will feature bright, open, technologically rich, barrier-free spaces for individual and collaborative study. A variety of learning environments, digital support and academic services will promote student learning success and help foster a culture of collaboration and creativity.”

Below are pics I’ve taken of the SLC site over the last few years, followed by a couple of photos showing how the site looked this afternoon.

 

Sam the Record Man Ryerson Student Learning Centre

September 26 2008: The iconic Sam the Record Man store seen shortly before its demolition. The building to its left once housed a popular A&A record outlet; after it closed, a Future Shop store occupied the spot for several years.


Sam the Record Man Ryerson Student Learning Centre

Another view of the famous Sam the Record Man store before its demolition


 Record Man Ryerson Student Learning Centre

September 26 2008: The future SLC site viewed from south of Gould Street


Ryerson Student Learning Centre

February 15 2009: Demolition of Sam the Record Man store is almost complete


Ryerson Student Learning Centre

A graffiti-covered wall along O’Keefe Lane is all that remains of the Sam’s store


Ryerson Student Learning Centre

May 2 2010: Sam’s is long gone, but demolition hasn’t begun on the A&A site


Ryerson Student Learning Centre

November 23 2010: The former A&A/Future Shop building is finally coming down


Ryerson Student Learning Centre

December 21 2010: A light layer of snow covers the cleared SLC site


Ryerson Student Learning Centre

December 21 2010:  Site viewed from O’Keefe Lane, looking west to Yonge St.


Ryerson Student Learning Centre

December 21 2010: The SLC site, looking southwest from O’Keefe Lane


Ryerson Student Learning Centre

January 5 2011: Site viewed during demolition at the 335 Yonge St. fire scene


Gould Street

January 8 2011: Gould Street during the 335 Yonge fire investigation


Ryerson Student Learning Centre

February 15 2011: The SLC site viewed from the west side of Yonge at Gould St.


Ryerson Student Learning Centre

February 15 2011: Vacant SLC site viewed from the corner of Yonge & Elm Streets