A look at the One Bloor condo construction site

Facebooktwitterredditpinterestlinkedinmail

One Bloor Toronto condo construction site

November 6 2011: Looking north from Hayden Street across the One Bloor condo construction site at the SE corner of Yonge & Bloor

 

One Bloor Toronto condo construction site

November 6 2011: Looking northeast across the site from Hayden Street

 

Site preparation: Drilling and shoring work continues at the construction site for the One Bloor condo tower at the southeast corner of Yonge & Bloor Streets. The work, which prepares the site for excavation, has been underway for over four months now.

A project of Great Gulf Homes, One Bloor was designed by Hariri Pontarini Architects of Toronto. Information about the building site and design, along with a selection of tower renderings and illustrations, is available at the One Bloor East profile page on the Hariri Pontarini website.

Below is an illustration of the 70-storey tower that appears on the One Bloor website, along with some of my recent photos of the construction site. Earlier photos can be viewed in my posts on August 13 2011, July 15 2011 and January 10 2011.

 

One Bloor Toronto condo tower rendering

From the One Bloor website, an illustration of the 70-storey tower designed by Toronto’s Hariri Pontarini Architects.

 

One Bloor East Toronto condo construction site

November 6 2011: North view of the One Bloor site and towers at Yonge & Bloor

 

One Bloor East Toronto condo construction site

November 6 2011: Hoarding protects the Yonge Street sidewalk at the west end of the One Bloor construction site

 

One Bloor East Toronto condo construction site

November 6 2011: A shoring rig on the south edge of the property

 

One Bloor East Toronto condo construction site

November 6 2011: Hayden Street view of the One Bloor site and its office building neighbour to the east, the Xerox Centre at 33 Bloor Street East

 

One Bloor East Toronto condo construction site

November 6 2011: An idle excavating machine near Hayden Street

 

One Bloor East Toronto condo construction site

September 27 2011: Looking south across the One Bloor site. The tower will soar above the 46-storey Casa condominium at rear left.

 

One Bloor East Toronto condo construction site

September 27 2011: Another view of the One Bloor site from the north side of Bloor Street, outside the RBC bank branch

 

One Bloor East Toronto condo construction site

September 27 2011: Drilling rigs and concrete trucks on the building site

 

One Bloor East Toronto condo construction site

September 27 2011: Site viewed from the corner of Yonge & Hayden Streets

 

One Bloor East Toronto condo construction site

September 27 2011: Crews working near the site’s northeast corner

 

One Bloor East Toronto condo construction site

September 27 2011: Overlooking the One Bloor site from the southeast

 

One Bloor East Toronto condo construction site

September 27 2011: View toward the southwest corner of the site at the intersection of Yonge & Hayden Streets

 

One Bloor East Toronto condo construction site

September 27 2011: Drilling rigs and concrete trucks in the center of the site

 



xx

 

Leave a Reply

Your email address will not be published. Required fields are marked *