Tag Archives: One Bloor

Looking up at some of the new skyscrapers making their mark on the downtown Toronto skyline

RBC WaterPark Place

The new RBC WaterPark Place office tower practically blends into the clouds in this view from the west on lower York Street on September 16 2014

 

 

South Financial Core towers

while four new towers reach for the clouds above the south downtown core. At left are the Delta hotel and Bremner office tower at Southcore Financial Centre on Bremner Blvd. Soaring skyward at right are the two ÏCE Condos on York Street.

 

 

1 Bloor condos

The sensuous curves of the One Bloor condo tower are already adding interest and excitement to the once-drab Yonge & Bloor intersection in Yorkville.

 

 

Below are more photos of the towers shown above, as well as other hotel, office and condo skyscrapers that I photographed this past week.

 

 

RBC WaterPark Place office building

 

RBC WaterPark Place

West side of RBC WaterPark Place viewed from lower York Street

 

 

RBC WaterParkPlace

South face of RBC WaterParkPlace seen from Queen’s Quay Blvd. The tower was designed by WZMH Architects of Toronto.

 

 

RBC WaterParkPlace

Upper half of the 30-storey tower, viewed from the southwest

 

 

RBC WaterPark Place

Another view of the tower from Queen’s Quay to the southwest

 

 

Studio on Richmond condominiums

 

Studio on Richmond

Looking up the north side of the Studio on Richmond condo tower situated between Simcoe and Duncan Streets in the Entertainment District. It will top off at 31 storeys. Its 41-storey sister tower, Studio2, is currently under construction behind it on Nelson Street.

 

 

Studio on Richmond condo

Studio on Richmond podium and tower viewed from the north side of Richmond Street near Simcoe Street

 

 

Studio on Richmond condo

The two-tower Studio on Richmond condo complex was designed by Quadrangle Architects of Toronto.

 

 

Studio on Richmond condo

A view of the Studio on Richmond condo from the west on Richmond Street near Duncan Street. The building is a project of Aspen Ridge Homes.

 

 

 Delta Hotel and Bremner office tower at Southcore Financial Centre

 

Delta Hotel and Bremner office tower

The Delta Toronto hotel (left) and the Bremner office tower are nearing completion at Southcore Financial Centre on Bremner Boulevard between York Street and Simcoe Street. The buildings are seen here from Roundhouse Park, near the Toronto Railway Museum.

 

 

 

Delta Hotel and Bremner office tower

The 45-storey Delta Hotel tower reflects on the west wall of the 30-storey Bremner office tower in this view from the southwest corner of Lower Simcoe Street and Bremner Boulevard.

 

 

Delta Hotel

Looking up the northwest corner of the Delta Hotel. The Bremner office tower is partially visible behind it.

 

 

 

Delta Hotel

Upper west side of the Delta Hotel. Scheduled to open in 2015, the Delta will be a premium 4-star hotel with 567 guest rooms.

 

 

Delta Hotel

The angled south face of the Delta Hotel, seen from Bremner Boulevard

 

 

 

The L Tower condominium

 

The L Tower

Upper floors of The L Tower seen from the west on Sept 16 2014. The dramatically curved skyscraper was designed by architect Daniel Libeskind.

 

 

 

The L Tower

A closer view of some of the upper levels of the 58-storey L Tower, which is located at the corner of Yonge Street and The Esplanade, directly behind the Sony Centre for the Performing Arts.

 

 

The L Tower

The L Tower makes an emphatic point on the downtown skyline

 

 

The L Tower

A telephoto view of the construction crane that has soared above The L Tower construction site for the past several years

 

 

The Mercer condo tower

 

The Mercer condo

Looking up the southeast corner of The Mercer condo building, which rises 33 storeys at the corner of Mercer and John Streets in the Entertainment District

 

 

The Mercer condo

The Mercer was designed by BBB Architects, and is a project of Graywood Developments Ltd. and Beaveerhall Homes.

 

 

 

Three Hundred Front Street West condominiums

 

 

300 Front Street West condos

The upper floors of the 49-storey Three Hundred Front Street West condo tower

 

 

300 Front Street West condos

Looking up the southeast corner of Tridel’s Three Hundred Front West condo. The building was designed by Toronto’s Wallman Architects.

 

 

Theatre Park condominiums

 

Theatre Park condo

The 47-storey Theatre Park condo tower is under construction on King Street West, right next door to Toronto’s historic Royal Alexandra Theatre. I shot this photo of Theatre Park from two blocks to the northwest.

 

 

Theatre Park condo

Theatre Park was designed by architectsAlliance of Toronto. The condo is a project of Lamb Development Corp., Niche Development and Harhay Construction Management Ltd.

 

 

Theatre Park Condos

Glass balcony panels are gradually being installed on the tower’s north side

 

 

Theatre Park Condos

Design details on the tower’s west side

 

 

ÏCE Condominiums

 

ICE Condos

The upper west sides of the 67- and 57-storey ÏCE Condominiums, located at 12 and 14 York Street in the south downtown core

 

 

ICE Condos

The top of the 67-floor ÏCE Condo at 14 York Street. A project of Lanterra Developments, the two skyscrapers were designed by Toronto’s architectsAlliance.

 

 

 

ICE Condos

 ÏCE Condo towers viewed from the southeast on Queen’s Quay Blvd.

 

 

ICE Condos

A view of the two towers from Grand Trunk Crescent to their northwest

 

 

 

Aura condominium

 

Aura condo tower

I shot this pic of the 78-storey Aura condominium tower from the podium green roof at Toronto City Hall. Aura is the tallest condominium building in Canada.

 

 

 

Aura condos

The upper third of Aura, viewed from several blocks to the southwest

 

 

 

Aura condo tower

A view of Aura from two blocks to the west on Elizabeth Street

 

 

Aura condo tower

Aura viewed from the northwest corner of College Park. A Canderel development project, the tower was designed by Graziani & Corazza Architects Inc.

 

 

 

Aura condos

The top of Aura, viewed from the southwest

 

 

Aura Condos

The top of Aura, viewed from the north

 

 

Nicholas Residences condominiums

 

Nicholas Residences

A view of 35-storey Nicholas Residences from the north on Balmuto Street. The condo is a project of Urban Capital and Alit Developments.

 

 

Nicholas Residences

Looking up the tower’s northwest corner, from the intersection of St Mary and St Nicholas Streets. The building was designed by Toronto’s Core Architects Inc.

 

 

Nicholas Residences

Nicholas viewed from the southwest on St Nicholas Street.

 

 

Nicholas Residences

West side of Nicholas, viewed from St Mary Street near Bay Street

 

 

 

FIVE Condominiums

 

FIVE Condo tower

Looking toward the 48-storey FIVE Condos tower from two blocks to the southeast, at the corner of Yonge and Maitland Streets.  To its right is the Nicholas Residences condo tower, two blocks north.

 

 

 

FIVE Condo tower

FIVE Condos was designed by Toronto’s Hariri Pontarini Architects

 

 

FIVE Condo tower

Looking up the south side of FIVE Condos from Wellesley Street West

 

 

FIVE Condo tower

The tower has a wonky appearance when viewed from the south, thanks to the undulating pattern of balconies on the east and west sides.

 

 

FIVE Condos S

Construction of the tower’s mechanical penthouse is underway. FIVE Condos is a project of MOD Developments Inc., Graywood Developments Ltd., Tricon and Diamondcorp.

 

 

 

FIVE Condos

Windows on the east side of FIVE Condos on September 5

 

 

FIVE Condos

FIVE Condos viewed from the east on the morning of September 11

 

 

 

FIVE Condo tower

A view of FIVE from the south on St Luke Lane, next to the Toronto Central YMCA Centre (left).  This view will change drastically in several years when Lanterra Developments builds its 60-storey 11 Wellesley on the Park condo tower on the property partly visible on the left side of St Luke Lane (presently occupied by a row of trees and a condo presentation centre behind them).

 

 

 

Chaz.Yorkville condominiums

 

ChazYorkville condos

Chaz.Yorkville Condominiums, on Charles Street between Yonge and Church Streets, is a project of 45 Charles Ltd. and Edenshaw Homes Limited.

 

 

ChazYorkville condos

A signature design element of Chaz.Yorkville is the large rectangular box that juts from the tower’s south side. It’s the Chaz Club, a 2-storey private club for exclusive use of condo residents.

 

 

ChazYorkville condos

The tower was designed by Sol Wassermuhl of Page + Steele IBI Group Architects in Toronto. It will stand 47 storeys tall when complete.

 

 

Casa Condominium and ChazYorville Condos

Chaz.Yorkville is only a few weeks away from overtaking the height of its next-door neighbour, the 46-storey Casa Condominium tower, which was built in 2010.

 

 

One Bloor Condominiums

 

One Bloor Condos

Although construction has climbed only one-third of the way to its ultimate 75 storeys, the One Bloor condo tower is already making a huge architectural statement at the Yonge & Bloor crossroads in Yorkville. I shot this photo from the southwest corner of Yonge & Charles Streets.

 

 

One Bloor Condos

I often hear passersby comment favourably on the delightful sweeping curves of One Bloor’s podium and tower.

 

 

One Bloor Condos

Looking up at One Bloor from the southwest corner of the Yonge & Bloor intersection. The building was designed by Toronto’s Hariri Pontarini Architects.

 

 

One Bloor Condos

A view of One Bloor from the northwest, on Yonge Street just above Bloor

 

 

 

U Condos

 

U Condos

A view of the two U Condos towers from two blocks to the south on Bay Street, at Phipps Street. The construction crane at left is building the 32-storey 1Thousand Bay condo tower at the southwest corner of Bay and St Joseph Streets.

 

 

 U Condos

The west U Condos building has topped off at 45 storeys, while the east tower continues its climb toward 55 floors. U Condos is a project of Pemberton Group, and was designed by architectsAlliance of Toronto.

 

 

 

X2 Condominiums

 

X2 Condos

Construction crews are closing in the mechanical penthouse levels of the 49-storey X2 Condominiums at the southwest corner of Jarvis & Charles Streets

 

 

X2 Condos

X2 Condos viewed from one block to the southwest on Isabella Street. The tower is a project of Lifetime Developments and Great Gulf Homes.

 

 

X2 Condos

A September 3 view from the south of X2 Condos left, and the first X Condos, right, which was constructed in 2010. X2 was designed by Wallman Architects, while X Condos was designed by architectsAlliance.

 

 

Nicholas & FIVE condos making big visual impact on Yonge Street; 1 Bloor tower set to follow suit

north downtown Yonge Street

November 14 2013: Construction of FIVE Condos (left) and Nicholas Residences (center rear) is dramatically changing the landscape of north downtown Yonge Street. This is a view from the east side of Yonge just below Maitland Street, one block south of Wellesley Street.

 

 

Shifting landscape: Two condo tower construction projects are rapidly changing the look of Yonge Street’s west side, between College and Bloor Streets, while a third new building will soon make a dramatic impact on views up the east side of Yonge Street.

The steadily rising concrete frames for FIVE Condos and Nicholas Residences now dominate the views up Yonge from as far south as its intersection with Carlton and College Streets. Depending upon your particular vantage point along the 10-block stretch of what city planners call “north downtown Yonge,” FIVE and Nicholas already obscure or partially block from sight several skyscrapers in the Yorkville neighbourhood — including the 51-storey Manulife Centre tower, which has been a familiar landmark indicating the intersection of Bloor & Bay Streets since 1972.

But with a long way still to go before construction of FIVE and Nicholas is complete, it’s already obvious that both new buildings will exude an even more powerful presence on the landscape once they have attained their full height. As of this weekend, construction of Nicholas has reached the 27th level on the way to 35, with cladding and windows installed up to the 13th floor so far. Two blocks down the street, construction of FIVE Condos has climbed to the 16th storey — exactly one-third of its way to the building’s final 48 floors. Installation of that tower’s cladding has not yet begun.

Meanwhile, the One Bloor condo project is poised to begin an equally remarkable transformation of views up the east side of Yonge Street. Rising at the southeast corner of Yonge & Bloor Streets, One Bloor will ultimately top off at 75 floors, completely reshaping the Yorkville skyline and one of the country’s most famous crossroads in the process.

 

One Bloor condos

November 27 2013: Looking toward the One Bloor condo construction site from one block to the south, at the intersection of Yonge and Charles Streets.

 

 

CONTINUED ON PAGE 2

Winter building pics: February 2013

Above is a link to my February 2013 Flickr album of building and construction photos I shot during walks in the downtown area. Click once on the image to view a small-format slideshow of the pictures, or click twice to access the album directly on Flickr and see full-size photos and captions.

 

Photo update: a peek at below-ground building progress at the One Bloor condo tower site

One Bloor Condos

February 17 2013: Construction of the bottom underground level of the One Bloor condo tower has made considerable progress … 

 

1 Bloor condo

 … since I last photographed the site, back on December 5 2012

 

 One Bloor Condos

February 17 2013: A peek between the construction cranes at the northwest corner of the site

 

One Bloor Condos

February 17 2013: Walls and support columns are gradually taking shape on the north side of the site at the base of one of the construction cranes

 

 

Pit Stops: Photo roundup of below-ground and at-grade construction activity at 21 downtown condo, office & university building sites

Picasso on Richmond condos

As 2012 drew to a close, some noteworthy downtown building projects had reached different stages of at- and below-grade construction progress. At some sites, like this one for the Picasso on Richmond condo tower, preliminary foundation drilling work was in full swing …

 

Studio on Richmond condos

… while at others, like this one for the Studio on Richmond and Studio2 condo towers just two blocks east of Picasso, site excavation was ongoing.

 

The Yorkville condos

Over the same period of time, underground parking levels were taking shape at some building sites, like this one for The Yorkville condo project on Davenport Road …

 

X2 Condos

… while over on Charles Street East, construction had reached a milestone mark at X2 Condos, where building had started on the ground level of the tower

 

Fall photos: Until condo and office tower construction starts to climb above street level, it can be difficult to track how quickly work is progressing on the dozens of new buildings going up in Toronto’s downtown core. Ground-level views of building sites are often obscured by hoarding and security fences, plus concrete delivery trucks, dump trucks and other construction vehicles maneuvering into and out of staging areas adjacent to construction zones. I find it’s a big challenge to monitor ongoing progress at places where underground levels are taking shape, let alone keep an eye on sites where shovels are just breaking ground or preliminary work is being undertaken to prepare for full-scale construction. The vast number of projects scattered throughout the downtown core certainly doesn’t make the task any easier.

 

CONTINUED ON PAGE 2

Fall photo update: One Bloor condo construction

1 Bloor condo

December 5 2012: Two construction cranes soar above the One Bloor condo tower excavation at Yonge & Bloor. Click on the photo to view a larger-size image.

 

Digging nearly done:  Last time I reported about construction progress on the One Bloor condo tower, in my September 4 2012 post, crews still had a huge amount of earth to excavate from the building site. As winter approaches some excavation work remains, but the two white construction cranes soaring above the property are a sure sign that the pace of building activity is going to pick up significantly. And at the bottom of the big pit more than five levels below the southeast corner of the busy Yonge & Bloor intersection, the base of the elevator core for the 75-storey skyscraper has started taking shape.

 

CONTINUED ON PAGE 2

Pit stop: The One Bloor condo tower excavation

One Bloor condos

 September 1 2012: A new month starts with major excavation work remaining in the southwest third of the One Bloor condo tower construction site

 

Still digging: People frequently ask me if foundation building work has started yet on the 75-storey One Bloor condo tower. The short answer, “not yet,” clearly seems to surprise most, who typically ask in response: “What’s taking so long?” I suppose Torontonians are anxious to see a tower finally rise from the site since it has been exactly four years since the retail and restaurant buildings that formerly occupied the block were demolished. People don’t seem to like seeing a big empty space at one of the city’s prime downtown intersections.

The mixed-use condo and retail building is a project of Great Gulf Homes, and was designed by Hariri Pontarini Architects.

My most recent One Bloor construction update post was published on June 16 2012.

Below is a tower rendering that appears on the One Bloor project website, followed by several more pics I shot of the excavation during the Labour Day Weekend.

 

One Bloor condo tower website rendering

This illustration of the Hariri Pontarini-designed tower appears on the One Bloor website

 

1 Bloor

September 1 2012

 

1 Bloor

September 1 2012

 

1 Bloor September 1 2012

September 1 2012

 

1 Bloor

September 1 2012

 

1 Bloor

September 1 2012

 

1 Bloor

September 1 2012

 

 

Developer gets city’s approval to raise One Bloor condo tower height from 70 to 75 storeys

One Bloor condo tower construction

June 13 2012: Excavation work continues at the southeast corner of Yonge & Bloor Streets where Great Gulf Homes is building its One Bloor condo tower

 

Five more floors: One Bloor, the landmark condo tower under construction at the southeast corner of Yonge & Bloor Streets, will be climbing five floors higher as a result of a Committee of Adjustment hearing at City Hall this week.

In an application to the committee, the project developer had requested a zoning bylaw variance that would allow it to raise the tower’s height from 70 to 75 storeys, as well as increase the building’s gross floor area from 55,910 square meters to 68,634 square meters.  The application was item number 26 on the Committee of Adjustment’s June 13 meeting agenda.

 

 

CONTINUED ON PAGE 2

Looking in on 3 big digs along north Yonge Street: One Bloor, Nicholas Residences & FIVE Condos

One Bloor condo tower excavation Toronto

April 27 2012: The excavation for the One Bloor condo at Yonge & Bloor Streets keeps getting deeper along the site’s north and west sides …

 

Nicholas Residences excavation Toronto

… while three blocks south at St Mary & St Nicholas Streets, the excavation is deepest at the east and south ends of the Nicholas Residences condo tower site  …

 

FIVE Condos Toronto

… ande just two blocks farther south at Yonge & St Joseph Streets, the excavation for FIVE Condos is deepest at the northeast corner of the property

 

Digging deeper: Excavation work is continuing apace for three condo tower projects that will substantially change the look and height of Yonge Street between Bloor and Wellesley Streets. Below are photos showing how excavations have progressed in recent months at the One Bloor, Nicholas Residences and FIVE Condos construction sites.

 

CONTINUED ON PAGE 2

A look at the One Bloor condo construction site

One Bloor Toronto condo construction site

November 6 2011: Looking north from Hayden Street across the One Bloor condo construction site at the SE corner of Yonge & Bloor

 

One Bloor Toronto condo construction site

November 6 2011: Looking northeast across the site from Hayden Street

 

Site preparation: Drilling and shoring work continues at the construction site for the One Bloor condo tower at the southeast corner of Yonge & Bloor Streets. The work, which prepares the site for excavation, has been underway for over four months now.

A project of Great Gulf Homes, One Bloor was designed by Hariri Pontarini Architects of Toronto. Information about the building site and design, along with a selection of tower renderings and illustrations, is available at the One Bloor East profile page on the Hariri Pontarini website.

Below is an illustration of the 70-storey tower that appears on the One Bloor website, along with some of my recent photos of the construction site. Earlier photos can be viewed in my posts on August 13 2011, July 15 2011 and January 10 2011.

 

One Bloor Toronto condo tower rendering

From the One Bloor website, an illustration of the 70-storey tower designed by Toronto’s Hariri Pontarini Architects.

 

One Bloor East Toronto condo construction site

November 6 2011: North view of the One Bloor site and towers at Yonge & Bloor

 

One Bloor East Toronto condo construction site

November 6 2011: Hoarding protects the Yonge Street sidewalk at the west end of the One Bloor construction site

 

One Bloor East Toronto condo construction site

November 6 2011: A shoring rig on the south edge of the property

 

One Bloor East Toronto condo construction site

November 6 2011: Hayden Street view of the One Bloor site and its office building neighbour to the east, the Xerox Centre at 33 Bloor Street East

 

One Bloor East Toronto condo construction site

November 6 2011: An idle excavating machine near Hayden Street

 

One Bloor East Toronto condo construction site

September 27 2011: Looking south across the One Bloor site. The tower will soar above the 46-storey Casa condominium at rear left.

 

One Bloor East Toronto condo construction site

September 27 2011: Another view of the One Bloor site from the north side of Bloor Street, outside the RBC bank branch

 

One Bloor East Toronto condo construction site

September 27 2011: Drilling rigs and concrete trucks on the building site

 

One Bloor East Toronto condo construction site

September 27 2011: Site viewed from the corner of Yonge & Hayden Streets

 

One Bloor East Toronto condo construction site

September 27 2011: Crews working near the site’s northeast corner

 

One Bloor East Toronto condo construction site

September 27 2011: Overlooking the One Bloor site from the southeast

 

One Bloor East Toronto condo construction site

September 27 2011: View toward the southwest corner of the site at the intersection of Yonge & Hayden Streets

 

One Bloor East Toronto condo construction site

September 27 2011: Drilling rigs and concrete trucks in the center of the site

 



xx

 

At last! Great Gulf breaking ground today for its 70-storey One Bloor condo tower at Yonge & Bloor

One Bloor Toronto condo tower construction site

July 13 2011:  Construction equipment rises above the One Bloor condo tower construction site, viewed here from the west side of Yonge Street

 

Shovels ready: It only felt like it was taking forever, but it’s finally going to happen: According to a July 14 2011 article posted on the Toronto Star website, Great Gulf Homes will break ground tomorrow to officially launch construction of its 70-storey One Bloor condo tower at the southeast corner of at Yonge and Bloor Streets.

Frankly, it’s about time. Seven months ago — in a January 10 2011 post, to be exact — I publicly wondered when Great Gulf was going to get shovels in the ground and start building the One Bloor tower on what is often referred to as the “premier” piece of real estate in Canada. During the months that followed, heavy machines rolled on and off of the One Bloor site, hinting that a construction start was imminent. But they didn’t stay for long, and nothing appeared to change on the property. But after foundation building equipment arrived on the site in June, it seemed clear that preliminary construction work for the tower was set to start.

Initially, One Bloor was slated to be a 65-storey condo building with two floors of retail space fronting on the prestigious Yonge & Bloor intersection. However, thanks to strong buyer demand (the Star says 85% of the units in the 732-suite tower have been sold), One Bloor will now soar five storeys taller — topping off at 70 floors. Construction is expected to cost $450 million and last until the end of 2014.

Below are several One Bloor website renderings that suggest how the skyscraper, designed by Toronto’s Hariri Pontarini Architects, will look, along with photos I’ve taken of the project site in recent months.

 

One Bloor Toronto condo tower

Condo tower rendering from the One Bloor project website

 

One Bloor Toronto condo tower podium rendering

Condo tower podium rendering from the One Bloor project website   

 

One Bloor Toronto condo tower

Another tower rendering seen in this screen capture from the One Bloor website


One Bloor condo tower Toronto

May 1 2011: Trailers on the otherwise vacant south side of the One Bloor condo tower construction site, viewed from the west side of the Xerox Tower

 

One Bloor condo tower Toronto

May 1 2011: Looking west across the vacant One Bloor site

 

One Bloor Toronto condo tower site

May 1 2011: Looking northwest toward the corner of Yonge & Bloor

 

One Bloor Toronto condo tower construction site

June 22 2011: A shoring rig on the northern half of the One Bloor site

 

One Bloor Toronto condo tower site

June 22 2011: Yonge Street view of the shoring rig on the One Bloor property

 

One Bloor Toronto condo tower construction site

June 22 2011: Bloor Street view of the shoring rig

One Bloor Toronto condo tower construction site

July 6 2011: Two shoring rigs ready for action on the building site

 

One Bloor Toronto condo tower construction site

July 6 2011: A closer look at the two rigs sitting idle on the site

 

One Bloor Toronto condo tower construction site

July 13 2011: More construction equipment and a tent have been brought in for the groundbreaking ceremony

 

Skyscrapers at Yonge & Bloor Streets in Toronto

July 14 2011: My balcony view at sunset of skyscrapers near Yonge & Bloor Streets. The 45-storey Casa condominium tower (center) currently dominates the skyline; however, in three or four years’ time, One Bloor — which will rise just to the right rear of Casa — will be the tallest building in the area

 

 

Neighbourhood Watch: Photos of Bloor-Yorkville area condos and construction activity (Part 1)

Crystal Blu condo tower and Uptown Residences Condo tower

April 30 2011: The Crystal Blu condo tower (left) and Uptown Residences Condo tower (right) soar skyward above Balmuto Street

 

High neighbours: As residents gradually move into the new 35-storey Crystal Blu condo tower at 21 Balmuto Street, buyers of luxury condos at The Uptown Residences anxiously await their own move-in dates. Exterior construction activity on the 48-floor Uptown Residences tower at 35 Balmuto has been finished for a few months, but finishing touches are underway and the front entrance is still being built. Information and photos of The Uptown Residences are provided in my March 2 2011 post about the project; below are several more pics I took of it and Crystal Blu last month.

 

The Uptown Residences condo tower

April 7 2011: A work crew applies finishing touches halfway up the west side of The Uptown Residences condo tower

 

The Uptown Residences condo tower

April 7 2011: A closer view of the workers on their swing stage

 

The Uptown Residences condo tower

April 22 2011: The Uptown Residences front entrance at 35 Balmuto Street

 

The Uptown Residences condo tower

April 22 2011: The Uptown Residences front entrance features a revolving door

 

Crystal Blu condo tower

April 22 2011: The Crystal Blu Condos front entrance isn’t 100% finished yet

 

The Uptown Residences condo tower

April 30 2011: The Manulife Centre across the street reflects in The Uptown’s shiny black and grey granite podium…

 

The Uptown Residences condo tower

…while a worker performs finishing touches on the lower southwest corner

 

The Uptown Residences condo tower

April 30 2011: A long look up the north side of The Uptown Residences

 

36 Hazelton luxury condo

April 23 2011: The 36Hazelton luxury condo project location and presentation centre opening this month at 36 Hazelton Avenue

Exclusive enclave: The presentation centre for 36Hazelton is being readied for an opening expected sometime this month. Only 18 residences will be available in the boutique condo development, which will rise seven storeys above the historic St Basil’s Catholic School at 36 Hazelton Avenue. Prices for the posh condominium suites, which will boast spacious outdoor terraces overlooking the quiet tree-lined street, range from $1.6 million to more than $10 million. See my March 26 2011 post for further information about 36Hazelton as well as numerous photos of the project site.

 

36 Hazelton luxury condo

April 23 2011: 36 Hazelton will incorporate the facade of the 83-year-old St Basil’s schoolhouse into the boutique condo building

 

The Florian Residences of Upper Yorkville condo tower

April 23 2011: Exterior brickwork and window installation on the east side of The Florian Residences of Upper Yorkville condo tower on Davenport Road

 

Florian facade fills out: Brickwork and window installation at The Florian Residences of Upper Yorkville continues to climb higher up the 25-storey condo tower. My February 12 2011 post describes The Florian project and includes numerous building photos, while my March 18 2011 post provides further construction pics. Below are several more photos from last month, along with a pic showing The Florian’s location before construction of the condo tower commenced.

 

The Florian  Residences of Upper Yorkville condo tower

April 23 2011: Another view of The Florian’s brick and glass exterior

 

The Florian Residences of Upper Yorkville condo tower

April 23 2011: A view of the western point of The Florian’s long curved podium along  Davenport Road (at the top of Bay Street)

 

The Florian Residences of Upper Yorkville condo tower location

August 14 2008: An Infinity car dealership and a Premier Fitness gym previously occupied the site where The Florian is presently under construction

 

Toronto Reference Library

April 23 2011: Toronto Reference Library new main entrance construction

Corner cube: The dramatic new entrance “cube” for the Toronto Reference Library is gradually taking form on the northeast corner of Yonge Street and Asquith Avenue. That, plus an expansion of the library’s Yonge Street facade, are among the highlights of a five-year, $34 million makeover scheduled for completion next year. Construction photos and an architectural rendering of what the library will look like post-renovation can be viewed in my January 27 2011 post; additional photos and another rendering are provided in my March 24 2011 update post. Below are several recent photos of a construction worker atop the giant steel frame for the cube.

 

Toronto Reference Library

April 23 2011: The steel frame for the library’s glass entrance cube

 

Toronto Reference Library

April 23 2011: A construction worker sits astride one of the steel beams

 

Toronto Reference Library

April 23 2011: The entrance cube will stand about three storeys tall

Toronto Reference Library

April 23 2011: The library’s website explains that the bold glass entrance is intended to encourage “a dynamic interface” between the library and the community, “connecting the interior more directly to the street.”

 

One Bloor condo tower

April 30 2011: A billboard advertising the One Bloor condo tower sales centre

 

Number One: I’m still waiting on tenterhooks, figuratively speaking, for shovels to hit the ground at the One Bloor condo tower site on the southeast corner of Yonge & Bloor. Since my January 10 2011 post, the project developer has opened a new sales centre for the much-anticipated condo skyscraper right next door to the building site, at 33 Bloor Street East. But I haven’t yet seen any preliminary construction activity on the property, which remains a rubble-strewn vacant lot. Below are some pics of it from earlier this week.

 

One Bloor condo tower location at Yonge & Bloor

April 30 2011: Colourful marketing banners adorn security fencing around the One Bloor condo tower location at Yonge & Bloor

 

One Bloor condo tower site

May 1 2011: The One Bloor Condo tower site, looking southwest toward the corner of Yonge and Hayden Streets

 

One Bloor condo tower site

May 1 2011: The One Bloor site viewed from the west entrance to the Xerox building at 33 Bloor Street East

 

One Bloor condo tower site

May 1 2011: Northwest view of the One Bloor condo tower site

 

 

Will Bloor Street transformation project finally finish before June 16 “red carpet” opening party?

Bloor Street transformation project banner

September 21 2008: A Bloor Street transformation project banner on security fencing along a construction area near the corner of Bloor & Church Street

 

Bloor Street transformation project sidewalk construction

May 13 2009:  Sidewalk construction outside the Hudson’s Bay Centre

 

Bloor Street transformation construction activity

May 13 2009: Bloor Street traffic is squeezed down to two lanes during construction activity outside the Holt Renfrew Centre

 

new Bloor Street sidewalk outside the Hudsons Bay Centre

November 22 2009: The transformed streetscape outside the Hudson’s Bay Centre

 

New Bloor Street sidewalks trees and flowers near Church Street

July 25 2010: Bloor Street East looks beautiful with new sidewalks, trees, lush plants and gorgeous flowers between Park Road and Church Street…

 

Bloor Street construction activity outside Holt Renfrew Centre

… but on the same day, it’s a different story west of Yonge Street, where there is still a huge construction zone in front of the Holt Renfrew Centre

 

looking east along Bloor Street from south side of street near the Colonnade

October 3 2010: Construction between Bellair Street and Avenue Road

 

future tree planting location on south side of Bloor street outside the Manulife Centre

December 21 2010: This tongue-in-cheek sign at a tree planting location got only one thing right: The Toronto Maple Leafs didn’t make it to the Stanley Cup Playoffs. But as of May 1, there still weren’t any new “leafs” on Bloor Street

 

new tree installation location on Bloor Street at the Manulife Centre

April 30 2011: Trees should soon be planted outside the Manulife Centre

 

New plants and sidewalks outside Xerox Centre at 33 Bloor East

April 30 2011: The cheery spring flowers brighten the south side of Bloor between Yonge and Church, but some trees still haven’t been planted…

 

Old sidewalk on Bloor Street outside the One Bloor condo tower future building location

…while the long stretch of sidewalk adjacent to the site of the future One Bloor condo tower won’t be replaced until construction is finished. That means a few more years of waiting before the Bloor Street transformation is complete…

 

Sidewalk installation outside 120 Bloor Street East office building

…but at least the long-overdue sidewalk replacement outside 120 Bloor Street East, seen here on May 1, will be finished soon

 

Mink Mile Makeover: After four long years of digging, delays and detours, controversy, cost-overruns and even courtroom drama, the $25 million Bloor Street Transformation Project is nearing completion. With luck, the Mink Mile will look marvellous during the big “red carpet” street party that the Bloor-Yorkville Business Improvement Area (BIA) will be throwing on June 19 to celebrate the new streetscape. I will be among countless Torontonians breathing a collective huge sigh of relief when the City and the BIA confirm that the project is finally finished. After all, it’s about time!

The upscale shopping section of Bloor Street has desperately needed a major makeover for years. The drab streetscape with its narrow white concrete curbs and pavement looked cheap, not chic, and totally lacked any sense of importance, elegance or sophistication — characteristics one would expect for an area that’s often described as Canada’s “premiere” shopping street. Its banal appearance didn’t complement the beautiful luxury goods and fashion boutiques lining both sides of the boulevard. And it certainly didn’t suggest that Toronto is the world-class city it constantly claims and aims to be. I almost felt embarrassed telling visitors from other countries that Bloor Street was the city’s go-to destination for Prada, Cartier, Louis Vuitton and other high-end luxury retail purveyors. Apart from the expensive shops, there was nothing noteworthy or special about Bloor — it was just a typical, tired-looking downtown Toronto street.

So I was thrilled when I heard that the City and the Bloor-Yorkville BIA were teaming up to revitalize part of the Bloor Street strip, and even happier to see the $20 million project break ground in July 2008. Designed by Peter Clewes of Toronto’s architectsAlliance (in joint venture with Brown + Storey Architects), the two-year project promised to give the City a sophisticated streetscape that would finally match its Mink Mile moniker. I looked forward to seeing the wide granite sidewalks with raised planting beds for trees, flowers and shrubs, the new street furnishings and lighting, and the new public art. I felt it was just what Toronto needed to do to transform Bloor Street into a stylish shopping destination on par with high-end shopping districts in major cities around the world.

The project was scheduled for completion in phases over a two-and-a-half-year period, concluding by the end of 2010. However, in typical Toronto fashion, the transformation work got mired in delays, cost overruns and controversy. The project made headlines early on when several Bloor Street businesses launched a lawsuit against the City and the BIA, claiming in part that the project lacked proper prior community consultation and environment assessments. But as was reported in an October 30 2008 article on insidetoronto.com, the Ontario Divisional Court found no improprieties and ruled the project could proceed. Then construction delays started to drag things out considerably. As the Toronto Star reported on May 12 2010, “unforeseen construction problems” put the project months behind schedule and 23% over budget ($4.5 million). More than half of the cost overrun was blamed on Toronto Hydro, which encountered problems and delays burying hydro chambers under the street.

In November 2010, word went out that the work on Bloor Street had finally finished. In a November 23 2010 story, the online publication Building said the transformation project had been finished just in time for the Christmas shopping season, while in a November 29 2010 press release published on its website, Tourism Toronto stated that “Bloor-Yorkville has enhanced its reputation as Canada’s premiere shopping district with the completion of the Bloor Street Transformation Project.” That news struck me as odd, since I had walked along Bloor Street several times in November and noticed that much work remained to be done. Tree and plant installation had not even started west of Yonge Street, and signs said that wouldn’t happen before spring 2011; meanwhile,  a big unrenovated stretch of sidewalk remained as a tremendous eyesore outside the office building at 120 Bloor Street East.

It’s now spring 2011 and there are signs the long-awaited tree and flower planting west of Yonge Street will take place very soon; apparently the BIA is aiming to get all the greenery in the ground by the end of this month. And over at Bloor and Church, crews are finally tackling the ugly section of sidewalk that wasn’t renovated along with the rest of the block.

Though the June 26 street party might suggest the transformation is a done deal, it won’t truly be over for a long time yet. A long section of sidewalk at the southeast corner of Bloor and Yonge hasn’t been touched because that’s where construction is supposed to start sometime later this year or next on the One Bloor condo skyscraper. There’s no point renovating that sidewalk, I suppose, if it’s just going to be covered by hoarding for years and possibly even damaged by construction vehicles and equipment.

Notwithstanding that one missing piece, was the Bloor Street renovation effort really worth the time, trouble, aggravation and pricetag? While I’m sure many frustrated and construction-weary Bloor-Yorkville-area business owners and residents don’t believe so, I think the new streetscape is a wonderful civic investment that will eventually pay off many times over. And even though I don’t patronize those über-expensive designer boutiques, I love walking along the renovated street, and can’t wait to see how it looks and feels this summer once all the trees, plants and flowers are in full bloom.

The only thing I’m not happy to see is the abrupt end of the beautiful streetscape a few dozen meters east of the intersection of Bloor and Church Streets. From there to Jarvis Street and farther east to Sherbourne Street, the street looks dull and, in places, downright tawdry and tacky. The City replaced some dead and dying trees on the south side of Bloor Street with paving stones instead of replacement saplings, and though a few new park benches have been installed on the sidewalks between Church and Sherbourne, ugly and rusting metal planter boxes bring a trailer park trashiness to the eastern end of Bloor. The City should have extended the streetscape improvements all the way to Sherbourne; after all, that intersection is one of the gateways to the exclusive Rosedale residential district. But the City’s failure to do so is typical of its usual half-assed approach to civic improvement. I suppose we’re lucky we wound up with even just a few blocks of attractive, world-class streetscape. We could use a lot more, but this is Toronto, after all.

Below are several more recent photos of Bloor Street.

 

Bloor Street construction zone outside of Holt Renfrew

July 25 2010: Many Bloor Street merchants were furious with the construction delays, but at least Holt Renfrew took matters in stride.

 

north sidewalk on Bloor Street just west of Yonge Street

May 13 2009: This photo shows how awful the sidewalk looked before renovations reached the north side of Bloor Street at Yonge Street, outside the CIBC  tower.

 

unrenovated Bloor Street sidewalk outside 120 Bloor Street East

November 22 2009: Only half of the block between Park Road and Church Street was renovated in 2009; the broken and missing paving stones were left untouched on this wide stretch of sidewalk outside 120 Bloor Street East

 

Sidewalk construction outside 120 Bloor Street East

April 30 2011: At long last, the eyesore stretch of sidewalk outside 120 Bloor Street East has finally been ripped up, and will be replaced with granite pavers

 

Bloor Street sidewalk outside the Marriott Hotel

May 1 2011: The Bloor Street transformation looks wonderful — except outside the Toronto Marriott Bloor-Yorkville Hotel at 90 Bloor East, where a long section of the old concrete sidewalk remains and completely spoils the new streetscape.

 

Bloor Street sidewalk outside the Marriott Hotel

May 1 2011: This strip of sidewalk outside the Bloor Street Marriott hotel is a prime example of the City of Toronto’s half-assed approach to civic improvement

 

Bloor Street planter box on sidewalk east of Church Street

April 30 2011: Yellow pansies brighten the southeast corner of Bloor and Church Streets, but the street transformation ends here. From just a few meters past this planter box all the way to Sherbourne Street, the east end of Bloor looks blah.

 

South side of Bloor Street between Church Street and Jarvis Street

May 1 2011: Sidewalk renovations didn’t continue along the south side of Bloor Street to either Jarvis or Sherbourne Streets. Instead, the city merely uprooted some dead and dying trees and replaced them with paving bricks, like those seen here outside St. Paul’s Bloor Street Anglican Church at 227 Bloor East.

 

Bloor Street planter box near Jarvis Street

May 1 2011: A rusting metal planter box on the south side of Bloor Street near Jarvis Street contrasts sharply with the gorgeous granite planters two blocks west

 

City Scene: Bloor Street keeps building up

Bloor Street

Looking west on Bloor Street from Avenue Road on February 12 2011


New kids on the block: The north side of Bloor Street from Avenue Road to Bedford Road keeps filling in and growing taller. Museum House condos is close to topping off and has nearly all its windows installed, while the One Bedford condo tower to its west is partly occupied and almost finished construction. Yet another condo tower — Exhibit Residences — is poised to join them. Their residents will only have to walk across the street to visit the Royal Ontario Museum (left) and the Royal Conservatory of Music, while the Yorkville neighbourhood is just around the corner.

Snow wonder: When will digging start at One Bloor?

November 20 2008 view of snow-covered One Bloor condo tower site …

 

…and on January 9 2011 — over two years later — little has changed

 

Bloor Street blahs: I’m getting increasingly anxious for construction to start on the One Bloor condo tower. Every time I pass the One Bloor building site at the southeast corner of Yonge & Bloor, it bugs me to see a big empty lot — a site that the media and real estate agents for years have described as Canada’s “premier” and “most prestigious” address. If it’s such a hot and important spot, what’s taking developer Great Gulf Group so long to get shovels in the ground? C’mon, guys, get going already!

Actually, Great Gulf is getting there — and digging should start soon. Back in November, the company applied to the city for a permit to begin work on the building’s foundation. Meanwhile, it’s preparing to open a spiffy new condo sales centre in the Xerox tower right next door. So things are moving along, though seemingly at a snail’s pace to impatient people like me.

I know I won’t be the only one cheering when hoarding is installed around the site and excavation equipment finally begins breaking ground — there’s a lot of building and skyscraper fans who can’t wait to watch a tower soar into the sky here. But exactly how tall will it stand?

The excavation permit application refers to a mixed-use highrise tower with 67 residential floors, 2 commercial floors (including a “p1 level commercial concourse”)  and six underground parking levels. That suggests the developer is set to build a 69-storey skyscraper.

Personally, I’d prefer to see a much taller tower — something closer to the 80 storeys envisaged for the ill-fated condo + hotel + retail complex originally proposed and sold for the site. (For those who either don’t recall or aren’t familiar with the dramatic recent history of the 1 Bloor Street East site, the Toronto Star describes crucial events in this story from July 18 2009 and this follow-up article from August 21 2009, while The Globe and Mail offered an even more detailed account in this story from September 17 2009.)

Heck, I wish One Bloor would go even higher — if Melbourne, Australia can build a 91-storey skyscraper (the Eureka Tower), why can’t we? Hasn’t Canada (i.e. Toronto) traditionally held bragging rights to the tallest building in the Commonwealth?

I’m keeping my fingers crossed and hoping that Great Gulf ultimately hikes the height of One Bloor to make it the tallest condo in Canada, but I won’t hold my breath just yet.

Below are several more photos I’ve taken of the One Bloor site, along with pics of Great Gulf marketing billboards featuring artistic renderings of their tower design. Additional renderings as well as more details about the project can be viewed on the project website, onebloor.com.