Pit stop: Crews dig deeper at FIVE Condos site

FIVE Condos Toronto

January 25 2012: Excavation has reached more than one level deep at the northeast corner of the FIVE Condos site on St Joseph Street

 

FIVE Condos

January 25 2012: Looking south from St Joseph Street across the excavation for the 45-storey FIVE Condos tower.  For more information about the project, see my December 22 2011 post

 

<>

In photos: A block of heritage buildings begins its transformation into FIVE Condos at 5 St Joseph

FIVE Condos site

April 9 2011: The FIVE Condos site viewed from Yonge Street, looking west along St Joseph Street. A 50-storey tower will ultimately dominate this scene

 

FIVE Condos site on Yonge Street

April 9 2011: Vacant retail premises in some of the heritage buildings at 606, 608, 610 and 612 Yonge Street that will become part of FIVE Condos

 

FIVE Condos Toronto site

April 9 2011: Vacant retail premises at 614, 616 and 618 Yonge Street that also will be restored and incorporated into the condo complex

 

FIVE Condos site Toronto

April 22 2011: The Henry Turner building at 618 Yonge Street, left, and its tacky rear addition that once housed a sports bar on the second floor, plus coffee and fast food outlets with a small patio on the street level.

 

5 St Joseph Street

April 22 2011: The Rawlinson Cartage warehouse at 5 St Joseph Street once housed nightclubs on its street level, and fitness clubs on its upper floors

 

St Nicholas Street facade of the Rawlinson Cartage heritage buildings

April 22 2011: Looking south along St Nicholas Street at the west walls of the former Rawlinson Cartage buildings

 

St Nicholas Street Toronto

April 22 2011: Looking north along St Nicholas Street at the west walls of the former Rawlinson Cartage buildings

 

St Nicholas Street outside the FIVE Condos site

April 23 2011: St Nicholas Street is closed so crews can locate gas, hydro and water utility lines servicing the old buildings on the FIVE Condos site

 

FIVE Condos site Toronto

May 11 2011: Demolition equipment arrives at 5 St Joseph Street

 

5 St Joseph Street Toronto

May 13 2011: Crews begin destroying trees outside 5 St Joseph Street

 

St Nicholas Street Toronto

May 13 2011: St Nicholas Street is closed to traffic between St Joseph Street and Phipps Street, and won’t reopen until the condo construction is complete

 

Hoarding outside 606 to 618 Yonge Street Toronto

May 31 2011: Hoarding outside the former retail shops at 606 to 618 Yonge Street

 

FIVE Condos site demolition

May 31 2011: The rear addition to the Henry Turner building at 618 Yonge has been torn down, and demolition continues on the rear of 616 Yonge Street

 

5 St Joseph Street Toronto

May 31 2011: Drilling and shoring equipment outside 5 St Joseph Street

 

FIVE Condos site Toronto

June 18 2011: Demolition at the rear of 616 and 618 Yonge Street is complete

 

The west sides of 606 to 618 Yonge Street

June 21 2011: The west side of the heritage buildings at 606 to 618 Yonge Street, after their rear additions have been demolished

 

5 St Joseph Street Toronto

June 21 2011: Drilling and shoring equipment outside 5 St Joseph Street

 

FIVE Condos site Toronto

June 30 2011: An excavator digs on the property between the Yonge Street heritage buildings and 5 St Joseph Street

 

5 St Joseph Street Toronto

June 30 2011: Drilling and shoring equipment outside 5 St Joseph Street

 

Phipps Street view of the FIVE Condos site

July 2 2011: Demolition of 15 St Nicholas Street viewed from Phipps Street


Demolition of 15 St Nicholas Street

July 2 2011: A demolition machine at work on a heap of debris

 

19 St Nicholas Street demolition

July 2 2011: Rubble is all that remains of the former Shred Central indoor skateboard park at 19 St Nicholas Street

 

Demolition of 15-25 St Nicholas Street Toronto

July 2 2011: Demolition viewed from St Nicholas Street, looking north

 

Demolition of 19 St Nicholas Street Toronto

July 2 2011: Shred Central had occupied 19 St Nicholas for over 13 years

 

Demolition of 15 St Nicholas Street Toronto

July 2 2011: Demolition at the southwest corner of 15 St Nicholas Street

 

Demolition of 15 St Nicholas Street Toronto

July 2 2011: The south wall of 15 St Nicholas Street is pulled down

 

19 St Nicholas Street Toronto demolition

July 9 2011: Demolition continues at 19 St Nicholas Street

 

Demolition of 19 and 25 St Nicholas Street Toronto

July 15 2011: Ongoing demolition of 19 and 25 St Nicholas Street

xx

Demolition of 25 St Nicholas Street Toronto

July 18 2011: A demolition machine pulls apart 25 St Nicholas Street 

xx

St Nicholas Street Toronto

July 21 2011: Looking north from the corner of Phipps & St Nicholas Streets

 

Demolition of 19-25 St Nicholas Street Toronto

July 24 2011: Demolition of 19-25 St Nicholas Street nears completion

 

Demolition of 15-25 St Joseph Street Toronto

August 6 2011: There is little left of the buildings at 15-25 St Joseph Street

 

FIVE Condos site demolition

August 6 2011: A demolition machine stirs up dust on the future tower site

 

5 St Joseph STreet Toronto

August 14 2011: Drilling work continues outside 5 St Joseph Street

 

St Nicholas Street Toronto

August 14 2011: Looking south along St Nicholas Street

 

FIVE Condos site

August 14 2011: St Nicholas Street view of the FIVE Condos site

 

FIVE Condos site

August 14 2011: Looking east across the site where the warehouse buildings at 15-25 St Joseph Street once stood

 

606-614 Yonge Street Toronto

August 19 2011: Marketing billboards for FIVE Condos on hoarding outside the Yonge Street heritage buildings

 

5 St Joseph Street Toronto

August 19 2011: Excavating equipment outside 5 St Joseph Street

 

5 St Joseph Street Toronto

August 19 2011: The red targets and holes in the brockwork mark the spots where steel supports will be installed to hold up the 5 St Joseph Street facade during construction of the condo tower

 

5 St Joseph Street Toronto

September 3 2011: Foundation building equipment on the empty lot where the buildings at 15-25 St Nicholas Street once stood

 

FIVE Condos site

September 12 2011: Crews will soon begin erecting the giant steel frame that will support the facade of 5 St Joseph Street

 

5 St Joseph Street Toronto

September 24 2011: The massive steel support starts taking shape

 

5 St Joseph Street Toronto

September 24 2011: The support structure will eventually extend the length of the building’s St Joseph Street facade

 

5 St Joseph STreet Toronto

September 24 2011: The huge frame extends halfway across St Joseph Street

xx

5 St Joseph Street Toronto

October 8 2011: The supports will hold the 4-storey brick wall in place while the condo tower is being built

 5 St Joseph Street Toronto

October 14 2011: The full support structure is now in position

 

5 St Joseph Street Toronto

November 20 2011: This wall along St Nicholas Street will be demolished soon

 

5 St Joseph Street Toronto

November 20 2011: A view of the east side of 5 St Joseph Street before the remaining rear section of the building is demolished

 

5 St Joseph Street Toronto

November 20 2011: The section of building with the windows will be demolished next, leaving only the front facade intact

 

5 St Joseph Street Toronto

November 25 2011: Demolition begins on the upper floor of 5 St Joseph Street

 

5 St Joseph Street Toronto

November 25 2011: The top three floors of the building were once home to gyms, including Epic Fitness, L3 Fitness, and Level Fitness

 

5 St Joseph Street Toronto

November 25 2011: Demolition viewed from the northwest along St Joseph Street

 

5 St Joseph Street Toronto

December 8 2011: All that’s left of 5 St Joseph is the 4-storey brick facade

 

5 St Joseph Street Toronto

December 11 2011: Sunlight streams through windows and the former main entrance doorway to 5 St Joseph Street

 

5 St Joseph Street Toronto

December 11 2011: Shoring work continues along the east side of St Nicholas Street behind the wrapped warehouse building facade

 

5 St Joseph Street Toronto

December 11 2011: The south-facing side of the 5 St Joseph Street brick facade is being kept under wraps

 

FIVE Condos site Toronto

December 22 2011: Excavation has begun for the 50-storey tower that will rise in the center of this site

 

FIVE Condos site Toronto

December 22 2011: A construction crew works at the edge of the excavation behind the Yonge Street heritage buildings

 

5 St Joseph Street Toronto

December 22 2011: Passersby often ask construction workers if the steel support is permanent. It eventually will be removed, of course.

 

5 St Joseph Street Toronto

December 22 2011: Shoring activity at the northwest corner of the site

 

5 St Joseph Street Toronto

December 22 2011: The wrapped facade looms above excavation and shoring machines on the condo site

 

5 St Joseph Street Toronto

December 22 2011: This site will be excavated for five underground levels

 

Welders at FIVE Condos site

December 22 2011: Welders work on one of the I-beams that will be sunk into the ground to shore up the excavation site

 

5 St Joseph Street Toronto

December 22 2011: If only the facade could have been wrapped in festive colours for the holiday season!

Work gets underway preparing Yonge-St Joseph site for construction of 45-storey FIVE condo tower

Hariri Pontarini Architects rendering of FIVE Condos tower

FIVE Condos, depicted at dusk in this illustration provided courtesy of Toronto’s Hariri Pontarini Architects, will become a landmark for the Yonge-Wellesley area.

 

5 St Joseph Street site of the FIVE Condo development

April 22 2011: A  St Joseph Street view of the FIVE Condos development site

 

Soil testing on St Nicholas Street

April 27 2011: Soil testing and utility service locating activity on St Nicholas Street, the western flank of the FIVE Condos construction site

 

High FIVE: The block to the northwest of Yonge and Wellesley Streets is set to become downtown’s newest condo construction zone, as crews begin preparing the site for FIVE Condos at 5 St Joseph. For the past two weeks, contractors have been conducting soil tests on the project site perimeter, while on Tuesday workers began locating and marking utility service entry points to the property, including gas, sewer and power lines. Yesterday and again today, St Nicholas Street was closed to traffic between St Joseph Street and Phipps Street as crews conducted more preliminary work along the northwest flank of the FIVE Condos location and continued demolishing the interior of some of the buildings on site. That section of St Nicholas Street could remain closed to vehicles and foot traffic for up to four years — the time it’s expected to take to construct FIVE’s 45-storey tower, heritage lofts and street-level retail spaces.

I wish construction wasn’t going to take so long, because I’m anxious to see not just how the FIVE tower will appear on the city skyline, but also to see if I’m right in predicting that this significant mixed-use development project could kick-start a much-needed renewal of the worn and weary Yonge Street strip between Wellesley and Bloor Streets.

FIVE is an intriguing project that will transform a large L-shaped piece of property fronting on St Nicholas Street to the west, St Joseph Street to the north, and Yonge Street to the east. There are three heritage buildings on the site — the Rawlinson Cartage buildings at 610 and 612 Yonge Street, and the William Doherty building at 614 Yonge street — along with other historically noteworthy structures including Rawlinson warehouse buildings at 5 St Joseph and along the east side of St Nicholas Street.

I must admit I felt dismayed when the FIVE project was publicly proposed three years ago, and not just because it meant my favourite gym would eventually be closed (I used to work out at a fitness club that occupied three floors of the Rawlinson building on St Joseph; it was a wonderful, incomparable space for a gym, and I was sorry to learn it was going to become loft condos). Word on the street at the time suggested that most of the heritage buildings between Yonge and St Nicholas would have to be razed to make way for a modern glass and steel tower. I dreaded the thought that the wonderful brick buildings might be demolished, since that would totally destroy the neighbourhood’s charm, ruin the look and feel of the narrow brick-paved St Nicholas laneway, and sadly eliminate some charming old buildings from the streetscape along Yonge. But I was hugely relieved once I saw that Hariri Pontarini Architects had sensitively designed the condo development around the heritage buildings, and wasn’t going to take away the things I love most about this particular area. Now I’m actually looking forward to the construction. I think that FIVE will not only breathe new life into a big block of historic buildings, but could also reinvigorate the surrounding neighbourhood, and perhaps even exert a positive influence on further thoughtful development along the Yonge Street strip.

With distinctive curving glass balconies, the 45-storey FIVE condo tower will establish a visual landmark and focal point for the Yonge & Wellesley area. The refurbished facades for the re-purposed historic buildings will become landmarks in their own right, preserving and enhancing the neighbourhood’s charm and character while demonstrating that development doesn’t always require the destruction of old buildings. FIVE could be a trailblazing project, showing the city and developers how to blend new residential highrises into older, low-rise buildings along a major commercial thoroughfare without spoiling the unique look and feel of the streetscape.  My key hope is that the city will ultimately pedestrianize St Nicholas to complement the cafés and boutiques envisioned for FIVE’s street level; a European-style promenade with outdoor café seating would be a perfect enhancement to the neighbourhood. (5ive, a gay dance bar that formerly occupied the ground floor of 9 St Joseph,operated a café and bar on the tree-shaded boulevard in front of the building for a few summers in the early 2000s. It would be great to see the northwest streetcorner at the FIVE complex come alive with something like that once again.)

For the next several years, though, I’ll have to wait and watch while FIVE goes up. That should be equally interesting to follow. While crews dig a 19-meter-deep excavation on the construction site, the five-story facade of the Rawlinson building on St Joseph Street will have to be preserved and maintained. That means a steel support structure must be erected on the street to hold the wall in place. Although the five-storey west wall of the historical building on St Nicholas Street will be dismantled to allow for construction of the FIVE tower, it will be rebuilt. Since the developer needs construction staging areas, on-street parking spaces must be removed from the south side of  St Joseph; meanwhile, the narrow (5.5-meter wide) stretch of St Nicholas between St Joseph and Phipps Street must be closed altogether for the duration of construction. The street closures and parking space removals could cost the developer $216,000 in fees payable to the city, full details of which are outlined in a March 30 2011 city report.

Below are recent photos I’ve taken of buildings on and around the FIVE development site, along with renderings provided courtesy of Hariri Pontarini Architects that suggest how the Yonge, St Joseph and St Nicholas streetscapes will appear once the heritage buildings and facades have been restored and rebuilt into the condo complex. Additional renderings, including images of the FIVE tower from four different perspectives, can be viewed on the St Joseph + Yonge project description page of the Hariri Pontarini website.

 

Street closure diagram for FIVE Condos construction site

From a background file on the City of Toronto website, a Transportation Services diagram shows street closures required for the construction of FIVE Condos

 

Development proposal sign for FIVE Condos

The development proposal sign that was posted outside 5 St Joseph Street, seen here in December 2008. The original plan proposed a 49-storey tower, but a 45-floor tower will be built instead.

 

The Five Condos site at 5 St Joseph Street

December 19 2008: The former Rawlinson Cartage building at 5 St Joseph Street

 

The corner of Yonge and St Joseph Streets on December 19 2008

The FIVE Condos site at the southwest corner of Yonge and St Joseph Streets seen during a snowstorm on December 19 2008

 

Neighbourhood poster protesting the FIVE Condos project

March 1 2009: Neighbourhood opposition failed to stop the development

 

The southwest corner of Yonge and St Joseph Streets on April 19 2010

April 19 2010: A view of the southwest corner of Yonge and St Joseph Streets.  A long advertising banner indicates the Yonge Street properties that are part of the FIVE Condos development site

 

The south side of St Joseph Street west of Yonge Street

April 19 2010: The FIVE Condos site on the south side of St Joseph Street just west of Yonge Street

 

The Rawlinson Cartage building at 9 St Joseph Street

April 19 2010: Banners advertising FIVE Condos on the facade of the former Rawlinson Cartage building at 5 St Joseph Street

 

The Rawlinson Cartage building at 5 St Joseph street

April 19 2010: Street-level view of the former Rawlinson Cartage building

 

Dundonald Street view west towards the FIVE Condos site

April 19 2010: Looking west on Dundonald Street toward the FIVE Condos site

 

South view down St Nicholas Street

December 4 2010: Looking south on St Nicholas Street at the west side of the FIVE Condos site. This brick facade will be dismantled and rebuilt.

 

West side of the FIVE Condos site along St Nicholas Street

December 4 2010: The west side of the FIVE Condos site viewed from the southwest corner of St Nicholas Street and Phipps Street

 

Looking north on St Nicholas Street from Phipps Street

December 4 2010: The west side of the FIVE Condos site viewed from Phipps Street looking north along St Nicholas Street

 

West side of FIVE Condos site viewed from St Nicholas Street

December 4 2010:  The west side of the FIVE Condos site, looking north along St Nicholas Street from the corner of Phipps Street. This part of the project site will be transformed into street-level retail space (see below).

 

Hariri Pontarini Architects rendering of FIVE Condos development along St Nicholas Street

This rendering, provided courtesy of Hariri Pontarini Architects, suggests how dramatically St Nicholas Street will be transformed with the addition of street-level retail space in the FIVE Condos development

 

A passageway from St Nicholas Street to a laneway behind Yonge Street

December 4 2010: This passageway through one of the buildings on the FIVE Condos site leads from St Nicholas Street to a laneway behind Yonge Street

 

A laneway between St Nicholas Street and Yonge Street

March 12 2011: A view of what’s at the east end of the passageway, looking toward the back of several buildings that front onto Yonge Street.

 

The south side of the FIVE Condos development site

March 12 2011: Looking north from the laneway behind St Nicholas and Yonge Streets. The FIVE Condo tower will rise 45 floors from this location.

 

Looking east on Phipps Street toward the FIVE Condos development site

December 21 2010: Looking east on Phipps Street (behind the Sutton Place Hotel) toward the FIVE Condos development site

 

Phipps Street view of the west side of the FIVE Condos development site

December 21 2010: A view from Phipps Street of one of the St Nicholas Street buildings on the FIVE Condos development site

 

The Shred Central indoor skateboard park

December 21 2010: The Shred Central skate park at 19 St Nicholas Street was the city’s last indoor skateboard facility. It closed in January to make way for the FIVE Condos construction. The park’s closure, after 13 years of operations, made the news in the December 3 2010 issue of the Globe and Mail.

 

South view down St Nicholas Street

December 21 2010: St Nicholas Street view of the three-storey building at the south end of the FIVE Condos development site. The five-storey brick building at far right is not part of the FIVE project.

 

Looking north along St Nicholas Street

December 21 2010: Street-level view of the west wall of the FIVE Condos site on St Nicholas Street, just below St Joseph Street

 

Looking up at the St Nicholas Street facade of the FIVE Condos site

December 21 2010: Looking up at the St Nicholas Street facade

 

Fire stairs on the St Nicholas Street facade of the Rawlinson Cartage building

December 21 2010: Fire stairs on the St Nicholas Street facade of the Rawlinson Cartage building at 5 St Joseph Street

 

Five Condos site at Yonge and St Joseph Streets

April 9 2011:  The southwest corner of Yonge & St Joseph Streets

 

Vacant stores on the Yonge Street properties that are part of the FIVE Condos site

April 9 2011: Three of the Yonge Street properties included in the FIVE project

 

Vacant stores in the Yonge Street properties part of the FIVE Condos development

April 9 2011: More of the Yonge Street properties that are part of the FIVE project

 

Hariri Pontarini Architects rendering of the Yonge Street section of the FIVE Condos development

This rendering, provided courtesy of Hariri Pontarini Architects, illustrates how the Yonge Street buildings and storefronts will be incorporated into the FIVE Condos project

 

11 St Joseph Street condominium building

April 19 2011: The Eleven Residences condominium building at 11 St Joseph Street was originally another historic Rawlinson Cartage building. When the building was redeveloped into a residential highrise in the early 2000s, its facade was dismantled and reassembled — as will be the case with the facades for the buildings where FIVE Condos will rise.

 

5 St Joseph Street site of FIVE Condos

April 22 2011: A St Joseph Street view of the Five Condos site

 

the Five Condos site at corner of St Joseph and St Nicholas Streets

April 22 2011: Southeasterly view of the 5 St Joseph Street building and the development site along the east side of St Nicholas Street

 

Hariri Pontarini Architects rendering of FIVE Condos development along St Joseph Street

This rendering, provided courtesy of Hariri Pontarini Architects, offers a St Joseph Street view of the FIVE Condos development

The FIVE Condos sales centre at 5 ST Joseph Street

April 22 2011: The entrance to the FIVE Condos presentation and sales centre at 5 St Joseph Street.  The street level premises of this former Rawlinson Cartage building have been home to at least three gay bars: Katrina’s during the 1980s, Colby’s in the 1990s, and 5ive in the early 2000s.

 

Buildings on the north side of St Joseph Street

April 22 2011: Buildings on the north side of St Joseph Street, directly across from the Five Condos site