Rêve King West exterior looking more complete

Facebooktwitterredditpinterestlinkedinmail

Reve King West condo construction progress

Rêve King West condo construction progress viewed from the Bathurst Street bridge to the southwest on March 29 2011

 

Nearly finished: January was the last time I was in the vicinity of the Rêve King West condo construction site. At that time, concrete had been poured for all 14 floors of the midrise Tridel condo building, while windows and exterior cladding had been installed on all but the top six storeys. Two construction cranes were still working on site. When I was back in the area at the end of March, I saw that the cranes had been removed from the roof, while almost all windows had been installed. Most of the exterior finish was in place, too. Occupancy is tentatively scheduled for this summer. Most suites have already been sold, but several are still available, at prices ranging from $334,000 for a 1-bedroom with den, to $850,000 for a 1,55-square-foot, 3-bedroom suite with a large terrace. Below are several more pics of the building; earlier construction photos can be viewed in my January 21 2011 post.

 

Reve King West condo construction progress

Southeast view of Rêve King West condo building on Front St. W. near Bathurst St.

 

Reve King West condo construction progress

North end of the Rêve King West condo building viewed from Niagara Street

 

Reve King West condo construction progress

The upper southwest floors of Rêve King West, viewed from Front Street

 

Reve King West condo construction progress

Another Bathurst Street bridge view of Rêve King West


One thought on “Rêve King West exterior looking more complete

  1. Pingback: Condo construction update for the King & Bathurst area | www.TheTorontoBlog.com

Leave a Reply

Your email address will not be published. Required fields are marked *