Tag Archives: Infinity3 condos

ÏCE and Infinity3 condo tower construction already making a significant visual impact on city skyline

ICE Condos and Infinity3 Condos

May 10 2012: South view from Bremner Boulevard of construction progress on the two ÏCE Condo towers, left and center, and the Infinity3 Condominiums, right

 

Changing views: Although construction of two neighbouring condo projects near the CN Tower still has a long ways to go before completion, it’s fast becoming apparent just how significantly the new towers will change the look of the city skyline.

The side-by-side ÏCE Condos and Infinity3 Condominiums rising on the north side of the Gardiner Expressway and Lake Shore Boulevard, between York and Lower Simcoe Streets, are already having a huge impact on sightlines and views in the South Financial District and Harbourfront areas. And that’s even though construction of the east ÏCE condo tower has so far climbed less than one-tenth of its ultimate 67-storey height, while the west ÏCE tower is just slightly more than one-third of its way to 57 floors. The main Infinity3 tower, meanwhile, is more than 20 floors high on its way to 34.

 

CONTINUED ON PAGE 2

City Scene: Taking in an ÏCE view

ICE Condos west tower

March 7 2012: A construction worker gazes at downtown Toronto from the curved west building of the 2-tower ÏCE Condos complex currently under construction at the southwest corner of York Street and Bremner Boulevard. Construction of the oval-shaped tower has reached more than 11 levels so far, on its way to 57 storeys. A project of Lanterra Developments, ÏCE Condos was designed by Peter Clewes of Toronto’s architectsAlliance.

 

ICE Condos Toronto

March 7 2012: Looking south from Bremner Boulevard towards the ÏCE Condos construction site. At left, construction of the 67-storey east tower has reached 3 levels while its sibling, center, has already climbed 11 levels on its way to 57. A 31-storey office building will eventually be constructed on the parking lots site in the foreground. The building under construction to the right is the Infinity3 condo tower, which has risen 9 floors on its way to 34. Infinity3 is a project of The Conservatory Group, and was designed by E.I. Richmond Architects Ltd.

 

 

Keeping tabs on … below-grade building progress at the Infinity3 and ÏCE condo tower projects

ICE Condos Toronto

July 1 2011: Looking down on the ÏCE Condos building site from the east side of Grand Trunk Crescent. I counted five below-ground floors under construction in the southwest corner (right) where a 57-storey tower is going up. Underground parking floors for its 67-storey sibling are taking shape in the foreground.

Infinity3 condo Toronto

July 1 2011: Right next door to the ÏCE Condos site, the underground levels for the Infinity3 condo complex are gradually filling in. This is a view of the southwest corner of the property next to Lower Simcoe Street.

 

Big basements: The giant L-shaped excavation south of the railway tracks, between York and Lower Simcoe Streets, keeps filling in as construction proceeds on underground levels for the two condominium complexes that will tower above the Gardiner Expressway. The greatest progress appears to have been made in the middle of the site along the property line between the ÏCE Condos development to the east and the Infinity3 Condominium project to the west. There, construction work is visible for five underground levels for Phase I of the ICE Condos complex, a 55-storey cylindrical tower. Right next door, on the west side of the wall, at least three underground levels are in varied stages of construction for Infinity3, which is a project of Conservatory Group.

Meanwhile, since units in Phase I and the 65-storey Phase II tower have completely sold out, builder Lanterra Developments has demolished the ÏCE Condos sales centre that used to sit near the corner of York Street and Bremner Boulevard. A 31-storey office building is planned for the site, but a construction start date for that phase of the project has not been announced. Part of the property is now being used as a pay-and-display parking lot that’s proving to be popular with people driving to the area to attend concert and sports events at the nearby Rogers Centre and Air Canada Centre.

Below are photos showing construction progress on both projects in the last couple of weeks.  Previous updates and pictures can be viewed in my April 23 2011 post and my February 25 2011 post.

 

ICE Condos Toronto

June 20 2011: A red excavating machine (rear middle of photo) completes demolition work on the former ÏCE Condos sales centre. Units in the two-tower condo complex are completely sold out …

 

ICE Condos Toronto

… so the site is now being used as a pay-and-display public parking area

 

Infinity3 Condos and ICE Condos Toronto

June 20 2011: From Lower Simcoe Street, an eastward-looking view of the Infinity3 project (foreground) and the ICE Condos development (in the back below the blue, yellow and white construction trailers on York Street)

 

Infinity3 Condos and ICE Condos Toronto

June 20 2011: The Infinity3 complex is going up directly across the street from Infinity1, a 35-storey condo at 30 Grand Trunk Crescent, and Infinity2, a 16-storey condo at 51 Lower Simcoe Street.

 

Infinity3 Condos Toronto

June 20 2011: Construction of Infinity3’s underground levels is more advanced on the east side of the property; the west half still has a long way to go to catch up.

 

Infinity3 Condos Toronto

June 20 2011: A view of work on two of Infinity3’s underground parking floors

 

Infinity3 Condos Toronto

June 20 2011: Progress on three levels is visible at the southwest corner

 

Infinity3 Condos Toronto

June 20 2011: A closer view of work on two of Infinity3’s underground floors

 

ICE Condos Toronto

June 20 2011: Construction crews working on the ÏCE Condos project

 

ICE Condos Toronto

June 20 2011: A worker stands in rebar rods set in place for a concrete pour

 

ICE Condos Toronto

June 20 2011: Two Infinity3 construction workers stand on wall construction forms

 

ICE Condos Toronto

June 20 2011: Two Infinity3 construction workers guide a bucket of concrete being lowered by one of the two construction cranes operating on the project

 

ICE Condos Toronto

July 1 2011: A view of underground level construction toward the north end of the ÏCE Condos building site

 

ICE Condos Toronto

July 1 2011: A southeasterly view across the ÏCE Condos site from the sidewalk along Grand Trunk Crescent

 

ICE Condos Toronto

July 21 2011: A view of four floors at different stages of construction progress

 

ICE Condos Toronto

June 20 2011: Rebar, wall forms and portable toilets on the ÏCE Condos site

 

ICE Condos Toronto

June 20 2011: The southwest corner of the ÏCE Condos site is advancing at a significantly faster pace than elsewhere

 

ICE Condos Toronto

July 1 2011: A view of the ÏCE Condos site, left, and the Infinity3 property, right

 

Infinity3 condo Toronto

July 1 2011: A view of the western half of the Infinity3 construction site

 

Infinity3 condo Toronto

July 1 2011: Overlooking the middle section of the Infinity3 construction site

 

Infinity3 condo Toronto

July 1 2011: Infinity3 construction approaches street grade near the crane situated next to Grand Trunk Crescent

 

Infinity3 condo Toronto

July 1 2011: Looking to the southeast across the Infinity3 construction zone

 

Infinity3 condo Toronto

July 1 2011: Forms in place to build supporting walls for Infinity3

 

Infinity3 condo Toronto

July 1 2011: Overlooking the eastern half of the Infinity3 construction zone

 

Infinity3 condo Toronto

July 1 2011: Looking to the southeast behind one of the Infinity3 cranes

 

Infinity3 condo Toronto

July 2 2011: Another view of Infinity3 from Grand Trunk Crescent

 

Infinity3 condo Toronto

July 2 2011: There are several spots along Grand Trunk Crescent from which Infinity3 can be viewed through security fencing next to the public sidewalk

 

Infinity3 condo Toronto

July 1 2011: The eastern section of Infinity3 next to the ÏCE Condos property

 

 

 

Pit stop: ÏCE & Infinity3 construction progress

Infinity3 and ICE condo construction progress

April 21 2011: Lower Simcoe Street view of bottom level construction progress at the Infinity3 and ÏCE condo tower construction sites

 

Lower floor poured: The giant pit between York Street and Lower Simcoe Street is starting to fill in, as construction of underground levels at the ÏCE Condos and Infinity3 Condo projects moves along. Five construction cranes are now working on the site — up from the three that I mentioned in my February 25 2011 post. Below are some photos I took of the construction progress on Thursday.

 

Infinity3 and ICE condo construction

April 21 2011: Four of the five construction cranes working the site are visible in this east view of the Infinity3 and ÏCE condo building progress

 

Infinity3 and ICE condo construction

April 21 2011: All five cranes — four white, one red — are visible in this view from Roundhouse Park above Lower Simcoe Street

 

Infinity3 and ICE condo construction progress

April 21 2011: The vast excavation for the two condominium tower projects stretches from York Street at the east to Lower Simcoe Street at the west

 

Infinity3 and ICE condo construction progress

April 21 2011: Freshly poured concrete floor near the site’s northwest corner

 

Infinity3 and ICE condo construction progress

April 21 2011: Forms in place to pour the next underground floor for ÏCE Condos

 

Infinity3 and ICE condo construction progress

April 21 2011: Building activity is currently concentrated on the center of the site

Infinity3 and ICE condo construction progress

April 21 2011: A view of the curved southeast corner of the ÏCE Condos site

 

Infinity3 and ICE condo construction progress

April 21 2011: Wall forms for ÏCE Condos underground levels

 

Infinity3 and ICE condo construction progress

April 21 2011: Floor and wall forms for the ÏCE Condos underground levels

 

Infinity3 and ICE condo construction progress

April 21 2011: Rebar and freshly poured concrete

 

Infinity3 and ICE condo construction progress

April 21 2011: A construction worker smooths a freshly poured concrete floor

 

Infinity3 and ICE condo construction progress

April 21 2011: Underground floors take shape in the middle of the site

 

Infinity3 and ICE condo construction progress

April 21 2011: The Lower Simcoe Street entrance to the Infinity3 excavation

 

Infinity3 and ICE condo construction progress

April 21 2011: A loo with an Infinity3 view

 

Infinity3 and ICE condo construction progress

April 21 2011: Construction of the bottom underground level for Infinity3 approaches the west end of the site near Lower Simcoe Street

 

Infinity3 and ICE condo construction progress

April 21 2011: The ramp from Lower Simcoe Street into the deep excavation for the Infinity3 condo development

 

Infinity3 and ICE condo construction progress

April 21 2011: A view of the Infinity3 condo excavation from Grand Trunk Crescent

 

Infinity3 and ICE condo construction progress

April 21 2011: A view of the Infinity3 construction zone

 

Infinity3 and ICE condo construction progress

April 21 2011: Another Grand Trunk Crescent view of the Infinity3 condo site

 

Infinity3 and ICE condo construction progress

April 21 2011: Lower floor construction progress near the western third of the site

 

Infinity3 and ICE condo construction progress

April 21 2011: Lower floor construction progress in the middle of the excavation

 

Infinity3 and ICE condo construction progress

April 21 2011: A red and yellow crane works the east side of the ÏCE Condos site

 

 

City Scene: Criss-crossed construction cranes

construction cranes at ICE Condos construction site

Crossing paths: The boom of one construction crane appears to be resting atop another in this photo from February 18. The two cranes are building the new ICE Condos and Infinity3 condo towers in the former railway lands area south of the Financial District.  The tower in the background is an old timer: it’s one of the Harbour Square condo buildings constructed in Harbourfront,  at the foot of Bay Street, way back in the late 1970s.

Infinity views and ÏCE foundations

Infinity3 condos ICE Condos

Three white cranes rise from the massive South Financial district (aka railway lands) excavation where the Infinity3 and ÏCE condo towers are being built.


From black asphalt to green courtyard canopy: What was once a vast asphalt-paved open-air parking area near the foot of York Street is gradually being transformed into an environmentally-conscious urban courtyard, covered by a 6,000-square-metre green canopy that will surround the base of two slender cylindrical skyscrapers — the 55- and 65-storey ÏCE Condominiums.

At the same time, what used to be a scruffy vacant lot right next door has become the building site for a new highrise condo complex, too — the 35-storey Infinity3 condos off Lower Simcoe Streets. Infinity3 condosThe parking lot, which sat to the north of Lake Shore Blvd. and the Gardiner Expressway, used to be popular with people driving into the city to attend events at the nearby Air Canada Centre and Harbourfront. But it’s now one of downtown Toronto’s largest condo building excavations, where foundations for underground parking levels are in the early stages of  construction.

Three construction cranes operate high above the enormous, L-shaped pit, while the construction entrance ramps off Grand Trunk Crescent and Lower Simcoe Street handle a steady stream of cement and dump truck traffic.

Below are photos I have taken from the CN Tower of the ÏCE and Infinity3 locations both before construction started, and during the early stages of site excavation. There’s also several pics I snapped at the side-by-side condo building site on a sunny day last week, along with some artistic renderings, from the ÏCE Condos website, of the two ÏCE towers and their courtyard canopy. Above left is a website rendering of the Infinity3 building under construction; it will be a new sibling to the two Infinity condo buildings that were constructed several years ago at the corner of Bremner Blvd. and Lower Simcoe Street.

ÏCE Condos is a project by Lanterra Developments and Cadillac Fairview; the buildings were designed by Peter Clewes of Toronto’s architectsAlliance. Infinity3 is a project of The Conservatory Group. The Infinity 3 website doesn’t name the project architects; however, the E.I. Richmond Architects Ltd. website includes the Infinity towers in its portfolio. Another rendering of the Infinity3 complex can be viewed on that site.

 

Infinity condos

September 22 2008: CN Tower view of the two Infinity condo buildings and the site for the Infinity3 project — a vacant lot off Lower Simcoe Street


Infinity condos ICE Condos

September 22 2008: A CN Tower view of the parking lot that is now an excavation for the two ÏCE Condos skyscrapers. The brown structure in the upper left corner is the foundation for the ÏCE Condos sales office being set up at the time.


Infinity condos Infinity3 condos

September 22 2008: CN Tower view of the Infinity3 condo site off Lower Simcoe Street; the little square building was the Infinity3 condo sales centre.


ICE Condos Infinity3 Condos

November 2 2010: CN Tower view of substantial excavation progress at the construction sites for the ÏCE Condos and Infinity3 Condos


ICE Condos Infinity3 Condos

November 2 2010: ÏCE Condos and Infinity3 Condos site excavation progress


Infinity condos Infinity3 condos

February 18 2011: The two existing Infinity condo buildings, left, overlook the deep Infinity3 excavation pit to their south.


Infinity3 condos ICE Condos

February 18 2011: Worksite viewed from Lower Simcoe Street


Infinity3 condos ICE condos

February 18 2011: Eastward view of the Infinity3 and ICE Condos worksites


Infinity3 condos

Infinity3 condo construction site entrance off Lower Simcoe Street


Infinity3 Condos ICE Condos

Infinity3 and ICE Condos foundations taking shape


Infinity3 condos ICE condos

A man standing outside the beige construction crew trailer (top center) supervises the ÏCE Condos building activity at the bottom of the pit


Infinity3 ICE Concods

A closer look at the foundation forms taking shape in the pit


Infinity3 condos ICE condos

One of the construction crew building the condo’s underground levels


ICE condos

Construction workers at the bottom of the deep ÏCE Condos excavation


ICE condos

Surveyors at work near the construction entrance to the ÏCE Condos excavation. The building in the background is the new Maple Leaf Square complex.


ICE Condos

The surveyors working above the ÏCE Condos excavation


ICE condos

ÏCE condos website rendering of the two condominium skyscrapers


ICE condos

ÏCE condos website rendering of the green canopy for the condo courtyard


ICE condo towers

The ÏCE condo towers depicted in an animated video on the project website


ICE condo towers

Website video suggests how the ÏCE towers might appear on the skyline