Category Archives: Delta Toronto

Looking up at some of the new skyscrapers making their mark on the downtown Toronto skyline

RBC WaterPark Place

The new RBC WaterPark Place office tower practically blends into the clouds in this view from the west on lower York Street on September 16 2014

 

 

South Financial Core towers

while four new towers reach for the clouds above the south downtown core. At left are the Delta hotel and Bremner office tower at Southcore Financial Centre on Bremner Blvd. Soaring skyward at right are the two ÏCE Condos on York Street.

 

 

1 Bloor condos

The sensuous curves of the One Bloor condo tower are already adding interest and excitement to the once-drab Yonge & Bloor intersection in Yorkville.

 

 

Below are more photos of the towers shown above, as well as other hotel, office and condo skyscrapers that I photographed this past week.

 

 

RBC WaterPark Place office building

 

RBC WaterPark Place

West side of RBC WaterPark Place viewed from lower York Street

 

 

RBC WaterParkPlace

South face of RBC WaterParkPlace seen from Queen’s Quay Blvd. The tower was designed by WZMH Architects of Toronto.

 

 

RBC WaterParkPlace

Upper half of the 30-storey tower, viewed from the southwest

 

 

RBC WaterPark Place

Another view of the tower from Queen’s Quay to the southwest

 

 

Studio on Richmond condominiums

 

Studio on Richmond

Looking up the north side of the Studio on Richmond condo tower situated between Simcoe and Duncan Streets in the Entertainment District. It will top off at 31 storeys. Its 41-storey sister tower, Studio2, is currently under construction behind it on Nelson Street.

 

 

Studio on Richmond condo

Studio on Richmond podium and tower viewed from the north side of Richmond Street near Simcoe Street

 

 

Studio on Richmond condo

The two-tower Studio on Richmond condo complex was designed by Quadrangle Architects of Toronto.

 

 

Studio on Richmond condo

A view of the Studio on Richmond condo from the west on Richmond Street near Duncan Street. The building is a project of Aspen Ridge Homes.

 

 

 Delta Hotel and Bremner office tower at Southcore Financial Centre

 

Delta Hotel and Bremner office tower

The Delta Toronto hotel (left) and the Bremner office tower are nearing completion at Southcore Financial Centre on Bremner Boulevard between York Street and Simcoe Street. The buildings are seen here from Roundhouse Park, near the Toronto Railway Museum.

 

 

 

Delta Hotel and Bremner office tower

The 45-storey Delta Hotel tower reflects on the west wall of the 30-storey Bremner office tower in this view from the southwest corner of Lower Simcoe Street and Bremner Boulevard.

 

 

Delta Hotel

Looking up the northwest corner of the Delta Hotel. The Bremner office tower is partially visible behind it.

 

 

 

Delta Hotel

Upper west side of the Delta Hotel. Scheduled to open in 2015, the Delta will be a premium 4-star hotel with 567 guest rooms.

 

 

Delta Hotel

The angled south face of the Delta Hotel, seen from Bremner Boulevard

 

 

 

The L Tower condominium

 

The L Tower

Upper floors of The L Tower seen from the west on Sept 16 2014. The dramatically curved skyscraper was designed by architect Daniel Libeskind.

 

 

 

The L Tower

A closer view of some of the upper levels of the 58-storey L Tower, which is located at the corner of Yonge Street and The Esplanade, directly behind the Sony Centre for the Performing Arts.

 

 

The L Tower

The L Tower makes an emphatic point on the downtown skyline

 

 

The L Tower

A telephoto view of the construction crane that has soared above The L Tower construction site for the past several years

 

 

The Mercer condo tower

 

The Mercer condo

Looking up the southeast corner of The Mercer condo building, which rises 33 storeys at the corner of Mercer and John Streets in the Entertainment District

 

 

The Mercer condo

The Mercer was designed by BBB Architects, and is a project of Graywood Developments Ltd. and Beaveerhall Homes.

 

 

 

Three Hundred Front Street West condominiums

 

 

300 Front Street West condos

The upper floors of the 49-storey Three Hundred Front Street West condo tower

 

 

300 Front Street West condos

Looking up the southeast corner of Tridel’s Three Hundred Front West condo. The building was designed by Toronto’s Wallman Architects.

 

 

Theatre Park condominiums

 

Theatre Park condo

The 47-storey Theatre Park condo tower is under construction on King Street West, right next door to Toronto’s historic Royal Alexandra Theatre. I shot this photo of Theatre Park from two blocks to the northwest.

 

 

Theatre Park condo

Theatre Park was designed by architectsAlliance of Toronto. The condo is a project of Lamb Development Corp., Niche Development and Harhay Construction Management Ltd.

 

 

Theatre Park Condos

Glass balcony panels are gradually being installed on the tower’s north side

 

 

Theatre Park Condos

Design details on the tower’s west side

 

 

ÏCE Condominiums

 

ICE Condos

The upper west sides of the 67- and 57-storey ÏCE Condominiums, located at 12 and 14 York Street in the south downtown core

 

 

ICE Condos

The top of the 67-floor ÏCE Condo at 14 York Street. A project of Lanterra Developments, the two skyscrapers were designed by Toronto’s architectsAlliance.

 

 

 

ICE Condos

 ÏCE Condo towers viewed from the southeast on Queen’s Quay Blvd.

 

 

ICE Condos

A view of the two towers from Grand Trunk Crescent to their northwest

 

 

 

Aura condominium

 

Aura condo tower

I shot this pic of the 78-storey Aura condominium tower from the podium green roof at Toronto City Hall. Aura is the tallest condominium building in Canada.

 

 

 

Aura condos

The upper third of Aura, viewed from several blocks to the southwest

 

 

 

Aura condo tower

A view of Aura from two blocks to the west on Elizabeth Street

 

 

Aura condo tower

Aura viewed from the northwest corner of College Park. A Canderel development project, the tower was designed by Graziani & Corazza Architects Inc.

 

 

 

Aura condos

The top of Aura, viewed from the southwest

 

 

Aura Condos

The top of Aura, viewed from the north

 

 

Nicholas Residences condominiums

 

Nicholas Residences

A view of 35-storey Nicholas Residences from the north on Balmuto Street. The condo is a project of Urban Capital and Alit Developments.

 

 

Nicholas Residences

Looking up the tower’s northwest corner, from the intersection of St Mary and St Nicholas Streets. The building was designed by Toronto’s Core Architects Inc.

 

 

Nicholas Residences

Nicholas viewed from the southwest on St Nicholas Street.

 

 

Nicholas Residences

West side of Nicholas, viewed from St Mary Street near Bay Street

 

 

 

FIVE Condominiums

 

FIVE Condo tower

Looking toward the 48-storey FIVE Condos tower from two blocks to the southeast, at the corner of Yonge and Maitland Streets.  To its right is the Nicholas Residences condo tower, two blocks north.

 

 

 

FIVE Condo tower

FIVE Condos was designed by Toronto’s Hariri Pontarini Architects

 

 

FIVE Condo tower

Looking up the south side of FIVE Condos from Wellesley Street West

 

 

FIVE Condo tower

The tower has a wonky appearance when viewed from the south, thanks to the undulating pattern of balconies on the east and west sides.

 

 

FIVE Condos S

Construction of the tower’s mechanical penthouse is underway. FIVE Condos is a project of MOD Developments Inc., Graywood Developments Ltd., Tricon and Diamondcorp.

 

 

 

FIVE Condos

Windows on the east side of FIVE Condos on September 5

 

 

FIVE Condos

FIVE Condos viewed from the east on the morning of September 11

 

 

 

FIVE Condo tower

A view of FIVE from the south on St Luke Lane, next to the Toronto Central YMCA Centre (left).  This view will change drastically in several years when Lanterra Developments builds its 60-storey 11 Wellesley on the Park condo tower on the property partly visible on the left side of St Luke Lane (presently occupied by a row of trees and a condo presentation centre behind them).

 

 

 

Chaz.Yorkville condominiums

 

ChazYorkville condos

Chaz.Yorkville Condominiums, on Charles Street between Yonge and Church Streets, is a project of 45 Charles Ltd. and Edenshaw Homes Limited.

 

 

ChazYorkville condos

A signature design element of Chaz.Yorkville is the large rectangular box that juts from the tower’s south side. It’s the Chaz Club, a 2-storey private club for exclusive use of condo residents.

 

 

ChazYorkville condos

The tower was designed by Sol Wassermuhl of Page + Steele IBI Group Architects in Toronto. It will stand 47 storeys tall when complete.

 

 

Casa Condominium and ChazYorville Condos

Chaz.Yorkville is only a few weeks away from overtaking the height of its next-door neighbour, the 46-storey Casa Condominium tower, which was built in 2010.

 

 

One Bloor Condominiums

 

One Bloor Condos

Although construction has climbed only one-third of the way to its ultimate 75 storeys, the One Bloor condo tower is already making a huge architectural statement at the Yonge & Bloor crossroads in Yorkville. I shot this photo from the southwest corner of Yonge & Charles Streets.

 

 

One Bloor Condos

I often hear passersby comment favourably on the delightful sweeping curves of One Bloor’s podium and tower.

 

 

One Bloor Condos

Looking up at One Bloor from the southwest corner of the Yonge & Bloor intersection. The building was designed by Toronto’s Hariri Pontarini Architects.

 

 

One Bloor Condos

A view of One Bloor from the northwest, on Yonge Street just above Bloor

 

 

 

U Condos

 

U Condos

A view of the two U Condos towers from two blocks to the south on Bay Street, at Phipps Street. The construction crane at left is building the 32-storey 1Thousand Bay condo tower at the southwest corner of Bay and St Joseph Streets.

 

 

 U Condos

The west U Condos building has topped off at 45 storeys, while the east tower continues its climb toward 55 floors. U Condos is a project of Pemberton Group, and was designed by architectsAlliance of Toronto.

 

 

 

X2 Condominiums

 

X2 Condos

Construction crews are closing in the mechanical penthouse levels of the 49-storey X2 Condominiums at the southwest corner of Jarvis & Charles Streets

 

 

X2 Condos

X2 Condos viewed from one block to the southwest on Isabella Street. The tower is a project of Lifetime Developments and Great Gulf Homes.

 

 

X2 Condos

A September 3 view from the south of X2 Condos left, and the first X Condos, right, which was constructed in 2010. X2 was designed by Wallman Architects, while X Condos was designed by architectsAlliance.

 

 

Downtown skyline views from the Toronto Islands

The downtown Toronto skyline as seen from Ward's Island

A Ward’s Island view of the downtown Toronto skyline earlier this month

 

Pics and video: A lunchtime bikeride on the Toronto Islands earlier this month gave me a chance to check out how much the downtown skyline has changed in the one-year period since my last trip to the islands.

Although there are dozens and dozens of condo towers and several office highrises under construction in downtown Toronto, only a handful of projects have so far made a significant impact on the skyline views.

The southwest downtown core is now dominated by the two ÏCE Condominium towers which are still under construction on York Street, while the nearby Delta Hotel tower at Southcore Financial Centre on Bremner Boulevard also makes a big impact from some perspectives. 

Off to the west, the Library District Condominium tower is a noteworthy addition to the Concord CityPlace skyline; a year ago, only its construction crane was visible.

Over on the southeast side of the downtown core, The L Tower is the most eye-catching new building, with the water’s edge Residences of Pier 27 also commanding attention even though it’s only a midrise condominium project.  Much farther east, the Distillery District is easier to locate now that construction is drawing closer to completion on the Gooderham Tower.

 

CONTINUED ON PAGE 2

Construction views from Roundhouse Park

 

Constantly changing scenery: The Rogers Centre, the CN Tower and the skyscrapers of the Financial District once dominated the north and east views from Roundhouse Park on Bremner Boulevard. But a slew of nearby construction projects is giving park visitors new views that change by the day. Above is a video I shot from the park yesterday, showing building activity at five major construction sites nearby: Infinity3, the final phase of the Infinity condo complex between Bremner and Lake Shore Boulevard; the two ICE Condos towers at York Centre on the east side of the Infinity buildings; the Delta Toronto hotel and Bremner office tower at Southcore Financial Centre; the Ripley’s Aquarium of Canada approaching the end of construction at the foot of the CN Tower; and the Three Hundred Front Street West condo tower to the northwest.

 

 

South downtown skyscraper construction offers soaring backdrop for Toronto’s new aquarium

Ripley's Aquarium of Canada and tower construction projects  in Toronto's south downtown area

April 4 2013: Construction is proceeding on schedule for a summer opening of the Ripley’s Aquarium of Canada (foreground), located on Bremner Boulevard at the foot of the CN Tower.  The new aquarium is one of eight different buildings seen at various stages of construction in this photo shot from the pedestrian walkway on the east side of the Rogers Centre. Rising behind the aquarium are, from left, The L Tower, the Delta Toronto Hotel and Bremner Tower office building at Southcore Financial Centre, the two cylindrical ÏCE Condos skyscrapers, and the two towers of the Infinity3 Condominiums. Click on the photo to view it in a larger format.

 

 

Winter building pics: March 2013

 My March 2013 album on Flickr features more than 500 photos showing dozens of downtown construction projects and building sites. Click once on the image above to view a small-format slideshow of the pictures, or click twice to access the actual album where you can view individual full-size photos with captions.

 

 

Frozen fingers: It’s only a few days into spring and I’m still sorting through hundreds of building and construction photos I took during the winter. What has struck me the most is how gloomy and grey the city looked most of the time. Sunny, clear days were few and far between — and when they came, it was usually too bitterly cold and windy for me to risk freezing my fingers by wandering around with my camera.

I did manage a few long photo walks, though, and have been gradually posting the pics in albums on thetorontoblog.com’s Flickr photostream.  Above is a link to my fourth winter photo album, March 2013.

 

 

CONTINUED ON PAGE 2

Winter building pics: February 2013

Above is a link to my February 2013 Flickr album of building and construction photos I shot during walks in the downtown area. Click once on the image to view a small-format slideshow of the pictures, or click twice to access the album directly on Flickr and see full-size photos and captions.

 

Winter building pics: December 2012

Above is a link to my December 2012 Flickr album of building and construction photos I shot during walks in the downtown area. Click once on the image to view a small-format slideshow of the pictures, or click twice to access the album and see full-size photos and captions.

 

Keeping tabs on … Delta Hotel & Bremner office tower construction at Southcore Financial Centre

Southcore Financial Centre construction

April 21 2011: Pile driving and shoring activity continues as crews prepare the Delta Toronto hotel and Bremner Tower office site for excavation.

 

Shore thing: The site for downtown Toronto’s next new hotel and office tower — part of the Southcore Financial Centre (SFC) at the northwest corner of Bremner Boulevard and Lower Simcoe Street — continues to be prepared for excavation. Drilling rigs have been working on the property since the beginning of this year, installing steel I-beams  to shore up the north side of the site next to the railway tracks. Excavation for the 45-storey Delta Toronto hotel and the 30-storey Bremner Tower office building should commence within a few months. Meanwhile, the 26-storey PricewaterhouseCoopers office building — the first SFC tower to be built — is 86% leased, with occupancy expected to be begin this fall. Below is a rendering from the Southcore Financial Centre website, showing how all three towers will appear once completed, along with a series of photos I took of the construction site on Thursday.

 

Southcore Financial Centre hotel and office towers

From the SFC website, a south view of the hotel & office towers

 

Southcore Financial Centre construction

April 21 2011: Bremner Boulevard north view of the construction site

 

Southcore Financial Centre construction

April 21 2011: The site sits south of the railway tracks, and across Lower Simcoe Street from the Toronto Convention Centre (left)

 

Southcore Financial Centre construction

April 21 2011: North view from Bremner Boulevard of the SFC site

 

Southcore Financial Centre construction

April 21 2011: The west half of the site, along Lower Simcoe Street

 

Southcore Financial Centre construction

April 21 2011: Northeast view of the construction zone from Bremner Blvd.

 

Southcore Financial Centre construction

April 21 2011: North view of the construction area from Bremner Blvd.

 

Southcore Financial Centre construction

April 21 2011: An excavator and a pile driver on the site

 

Southcore Financial Centre construction

April 21 2011: A steel I-beam sunk into the ground to shore up the south perimeter of the two-tower building site

 

Southcore Financial Centre construction

April 21 2011: One of the drilling rigs preparing the site for excavation

 

Southcore Financial Centre construction

April 21 2011: Drilling rig parts next to a pile of steel I-beams

 

Southcore Financial Centre construction

April 21 2011: East view of the Southcore Financial Centre construction site from the Simcoe Street steps to the Toronto Convention Centre

 

Southcore Financial Centre construction

April 21 2011: A view of the row of steel I-beam foundation supports next to the railway tracks at the north end of the construction site

 

Southcore Financial Centre construction

April 21 2011: The north half of the hotel and office tower site

 

Southcore Financial Centre construction

April 21 2011: Pile driving machines near the SE corner of the site

 

Southcore Financial Centre construction

April 21 2011: I-beams along the north side of the property

 

Southcore Financial Centre construction

April 21 2011: A pile driving machine on the west side of the site

 

 

Southcore Financial Centre construction

April 21 2011: An excavator digging at the northeast corner of the site


1 up, 2 to go: Southcore office & hotel towers will change city skyline south of the railway tracks

Southcore Financial Centre tower renderings

Artistic rendering of the three Southcore Financial Centre towers…


Southcore Financial Centre

…and a southeast view of the Centre as it appeared on February 18. The 26-storey PricewaterhouseCooper head office building at 18 York Street (right) is nearing completion, but excavation is still in early stages for the Delta Toronto hotel and Bremner office tower office still to be built.


Trackside towers: As downtown’s newest office tower approaches the end of construction, site excavation has only just begun for its two younger siblings, who will gradually grow into prominent hotel and office towers standing proudly right next door. 

Work on the 26-storey PricewaterhouseCooper (PwC) office building at 18 York Street is winding down, and occupancy for most of its floors is scheduled for the third quarter of this year. (Four and a half floors of the PwC tower, which is 86% leased, won’t be ready for occupancy until early in 2013.)

Meanwhile, crews are preparing to build downtown’s next new highrise hotel, the Delta Toronto, as well as the city’s next new office block, the Bremner Tower, on lands along Bremner Boulevard just west of PwC.

But this young family of buildings, formally known as the Southcore Financial Centre (SFC), is already having a major impact on the city. Along with some newer neighbours (Telus Tower and Maple Leaf Square) who recently took up residence nearby,  SFC is changing the look of the skyline and railway lands while at the same time drawing the Financial District to the south side of the train tracks.

And with construction currently underway for the ÏCE and Infinity3 condo towers just one block to the south, and construction expected to start later this year on the Ripley Toronto Aquarium one block to the west, this formerly derelict railway lands district is being transformed into a bustling and vibrant urban neighbourhood.

Sometimes I still can’t believe this is happening. Before I even moved to Toronto in the early 1980s, politicians kept promising new office and residential developments would revitalize the ugly railway lands between Union Station and Lake Shore Boulevard. As is typical for Toronto, it took so long for things to get going, I never thought I’d see construction actually get underway. But it has been happening, and the pace of transformation from blight to bright has been phenomenal.

For years, there wasn’t much more than a few parking lots and dusty, vacant fields on the vast swath of land stretching from the CN Tower in the west to the old Canada Post building at the corner of Bay Street and Lake Shore Blvd., in the east. Then the Air Canada Centre opened in 1999, followed in late 2005/early 2006 by the 35- and 16-storey Infinity condominium buildings at the corner of Bremner and Simcoe.  Last year, both the Telus office tower and the Maple Leaf Square condo/office/hotel/retail complex opened on the east side of York at Bremner. This year, condos, offices and a hotel are under construction, and a major tourist attraction will be joining them soon. Whew! Three years from now, I might not even recognize the neighbourhood!

But let’s get back to Southcore, the new kids on the block bounded by Lower Simcoe Street to the west, Bremner Blvd. to the south, York Street to the east, and the railway tracks to the north. The Delta Toronto will be a 45-storey, 566-room, four-star hotel standing at the corner of Bremner and Simcoe, conveniently just across the street from the Metro Toronto Convention Centre. The 30-storey Bremner Tower will sit between the Delta and PwC, on Bremner Blvd.

When I walked around the area last week, a construction crew and pile driver were working along the north perimeter of the site, right next to the rail tracks. Below are some pics I snapped from street level and from the Convention Centre stairs, along with some hotel and office tower renderings from the Southcore Financial Centre website.

 

Southcore Financial Centre tower renderings

Website illustration of the south elevation of the three Southcore towers


Southcore Financial Centre tower renderings

Rendering of the Southcore Financial Centre towers viewed from the southeast


Delta Toronto hotel tower

Website rendering of the 45-storey Delta Toronto hotel tower


Delta Toronto hotel tower

Website rendering of the Delta Toronto hotel tower courtyard


PwC 18 York Street office tower

January 3 2011: West view of the PricewaterhouseCoopers office tower, left, the Maple Leaf Square complex and the Infinity condos (right)


PwC office tower at 18 York Street

January 3 2011: The top floors of the west side of the PwC office tower


PwC office tower at 18 York Street

January 3 2011: Southwest view of the PwC tower and Telus Tower


PwC office tower at 18 York street

January 3 2011: PwC office tower construction gate on Bremner Blvd.


Southcore Financial Centre site

January 3 2011: Northwest view of the Southcore Financial Centre location for the Delta hotel and Bremner Tower. Overlooking the site are the PwC tower and Telus Tower at left, Maple Leaf Square towers (center), and the Infinity condos.


Southcore Financial Centre

January 3 2011: Trailers and dumpsters on the hotel and office tower building site


Southcore Financial Centre

February 18 2011: Delta Hotel and Bremner Tower site viewed from the southwest corner of Bremner Blvd and Lower Simcoe Street. Once built, the two towers will completely block this view of the Financial District skyscrapers.


Delta Hotel and Bremner Tower

February 18 2011:  Another view of the hotel and office tower building site


Southcore Financial Centre

February 18 2011: Yellow pile driving machine (center) on the Southcore site


Southcore Financial Centre

February 18 2011: Toronto Convention Centre view of the Southcore building site


Southcore Financial Centre

February 18 2011: Another convention centre view of the building site


Southcore Financial Centre

Within months, full-scale excavation of this site will be in progress


Southcore Financial Centre

February 18 2011: Pile driver at the site’s railway perimeter


Southcore Financial Centre

While the pile driving machine prepares the Southcore site for excavation, another huge construction project is underway nearby — the Union Station railway platform revitalization project (the covered area at the rear left side of the photo).


Southcore Financial Centre

The structure behind the pile driving machine is the north side of the PwC tower


Southcore Financial Centre

Construction workers guide the pile driver


Southcore Financial Centre

A closer look at the foundation-building machine


PwC office tower at 18 York

February 18 2011: PwC tower viewed from corner of York St. and Bremner Blvd.


PwC office tower at 18 York Street

A closer look at the top southeast corner of the PwC tower


PwC office tower at 18 York Street

February 18 2011: Simcoe Street view of the cranes atop the PwC office tower


PwC office tower at 18 York Street

Closer view of the upper west side of the PwC office tower


CN Tower reflection on 18 York Street office tower

February 18 2011: A Simcoe Street view of the CN Tower reflecting in the west windows of the new PricewaterhouseCoopers office building.