Tag Archives: Great Gulf

Looking up at some of the new skyscrapers making their mark on the downtown Toronto skyline

RBC WaterPark Place

The new RBC WaterPark Place office tower practically blends into the clouds in this view from the west on lower York Street on September 16 2014

 

 

South Financial Core towers

while four new towers reach for the clouds above the south downtown core. At left are the Delta hotel and Bremner office tower at Southcore Financial Centre on Bremner Blvd. Soaring skyward at right are the two ÏCE Condos on York Street.

 

 

1 Bloor condos

The sensuous curves of the One Bloor condo tower are already adding interest and excitement to the once-drab Yonge & Bloor intersection in Yorkville.

 

 

Below are more photos of the towers shown above, as well as other hotel, office and condo skyscrapers that I photographed this past week.

 

 

RBC WaterPark Place office building

 

RBC WaterPark Place

West side of RBC WaterPark Place viewed from lower York Street

 

 

RBC WaterParkPlace

South face of RBC WaterParkPlace seen from Queen’s Quay Blvd. The tower was designed by WZMH Architects of Toronto.

 

 

RBC WaterParkPlace

Upper half of the 30-storey tower, viewed from the southwest

 

 

RBC WaterPark Place

Another view of the tower from Queen’s Quay to the southwest

 

 

Studio on Richmond condominiums

 

Studio on Richmond

Looking up the north side of the Studio on Richmond condo tower situated between Simcoe and Duncan Streets in the Entertainment District. It will top off at 31 storeys. Its 41-storey sister tower, Studio2, is currently under construction behind it on Nelson Street.

 

 

Studio on Richmond condo

Studio on Richmond podium and tower viewed from the north side of Richmond Street near Simcoe Street

 

 

Studio on Richmond condo

The two-tower Studio on Richmond condo complex was designed by Quadrangle Architects of Toronto.

 

 

Studio on Richmond condo

A view of the Studio on Richmond condo from the west on Richmond Street near Duncan Street. The building is a project of Aspen Ridge Homes.

 

 

 Delta Hotel and Bremner office tower at Southcore Financial Centre

 

Delta Hotel and Bremner office tower

The Delta Toronto hotel (left) and the Bremner office tower are nearing completion at Southcore Financial Centre on Bremner Boulevard between York Street and Simcoe Street. The buildings are seen here from Roundhouse Park, near the Toronto Railway Museum.

 

 

 

Delta Hotel and Bremner office tower

The 45-storey Delta Hotel tower reflects on the west wall of the 30-storey Bremner office tower in this view from the southwest corner of Lower Simcoe Street and Bremner Boulevard.

 

 

Delta Hotel

Looking up the northwest corner of the Delta Hotel. The Bremner office tower is partially visible behind it.

 

 

 

Delta Hotel

Upper west side of the Delta Hotel. Scheduled to open in 2015, the Delta will be a premium 4-star hotel with 567 guest rooms.

 

 

Delta Hotel

The angled south face of the Delta Hotel, seen from Bremner Boulevard

 

 

 

The L Tower condominium

 

The L Tower

Upper floors of The L Tower seen from the west on Sept 16 2014. The dramatically curved skyscraper was designed by architect Daniel Libeskind.

 

 

 

The L Tower

A closer view of some of the upper levels of the 58-storey L Tower, which is located at the corner of Yonge Street and The Esplanade, directly behind the Sony Centre for the Performing Arts.

 

 

The L Tower

The L Tower makes an emphatic point on the downtown skyline

 

 

The L Tower

A telephoto view of the construction crane that has soared above The L Tower construction site for the past several years

 

 

The Mercer condo tower

 

The Mercer condo

Looking up the southeast corner of The Mercer condo building, which rises 33 storeys at the corner of Mercer and John Streets in the Entertainment District

 

 

The Mercer condo

The Mercer was designed by BBB Architects, and is a project of Graywood Developments Ltd. and Beaveerhall Homes.

 

 

 

Three Hundred Front Street West condominiums

 

 

300 Front Street West condos

The upper floors of the 49-storey Three Hundred Front Street West condo tower

 

 

300 Front Street West condos

Looking up the southeast corner of Tridel’s Three Hundred Front West condo. The building was designed by Toronto’s Wallman Architects.

 

 

Theatre Park condominiums

 

Theatre Park condo

The 47-storey Theatre Park condo tower is under construction on King Street West, right next door to Toronto’s historic Royal Alexandra Theatre. I shot this photo of Theatre Park from two blocks to the northwest.

 

 

Theatre Park condo

Theatre Park was designed by architectsAlliance of Toronto. The condo is a project of Lamb Development Corp., Niche Development and Harhay Construction Management Ltd.

 

 

Theatre Park Condos

Glass balcony panels are gradually being installed on the tower’s north side

 

 

Theatre Park Condos

Design details on the tower’s west side

 

 

ÏCE Condominiums

 

ICE Condos

The upper west sides of the 67- and 57-storey ÏCE Condominiums, located at 12 and 14 York Street in the south downtown core

 

 

ICE Condos

The top of the 67-floor ÏCE Condo at 14 York Street. A project of Lanterra Developments, the two skyscrapers were designed by Toronto’s architectsAlliance.

 

 

 

ICE Condos

 ÏCE Condo towers viewed from the southeast on Queen’s Quay Blvd.

 

 

ICE Condos

A view of the two towers from Grand Trunk Crescent to their northwest

 

 

 

Aura condominium

 

Aura condo tower

I shot this pic of the 78-storey Aura condominium tower from the podium green roof at Toronto City Hall. Aura is the tallest condominium building in Canada.

 

 

 

Aura condos

The upper third of Aura, viewed from several blocks to the southwest

 

 

 

Aura condo tower

A view of Aura from two blocks to the west on Elizabeth Street

 

 

Aura condo tower

Aura viewed from the northwest corner of College Park. A Canderel development project, the tower was designed by Graziani & Corazza Architects Inc.

 

 

 

Aura condos

The top of Aura, viewed from the southwest

 

 

Aura Condos

The top of Aura, viewed from the north

 

 

Nicholas Residences condominiums

 

Nicholas Residences

A view of 35-storey Nicholas Residences from the north on Balmuto Street. The condo is a project of Urban Capital and Alit Developments.

 

 

Nicholas Residences

Looking up the tower’s northwest corner, from the intersection of St Mary and St Nicholas Streets. The building was designed by Toronto’s Core Architects Inc.

 

 

Nicholas Residences

Nicholas viewed from the southwest on St Nicholas Street.

 

 

Nicholas Residences

West side of Nicholas, viewed from St Mary Street near Bay Street

 

 

 

FIVE Condominiums

 

FIVE Condo tower

Looking toward the 48-storey FIVE Condos tower from two blocks to the southeast, at the corner of Yonge and Maitland Streets.  To its right is the Nicholas Residences condo tower, two blocks north.

 

 

 

FIVE Condo tower

FIVE Condos was designed by Toronto’s Hariri Pontarini Architects

 

 

FIVE Condo tower

Looking up the south side of FIVE Condos from Wellesley Street West

 

 

FIVE Condo tower

The tower has a wonky appearance when viewed from the south, thanks to the undulating pattern of balconies on the east and west sides.

 

 

FIVE Condos S

Construction of the tower’s mechanical penthouse is underway. FIVE Condos is a project of MOD Developments Inc., Graywood Developments Ltd., Tricon and Diamondcorp.

 

 

 

FIVE Condos

Windows on the east side of FIVE Condos on September 5

 

 

FIVE Condos

FIVE Condos viewed from the east on the morning of September 11

 

 

 

FIVE Condo tower

A view of FIVE from the south on St Luke Lane, next to the Toronto Central YMCA Centre (left).  This view will change drastically in several years when Lanterra Developments builds its 60-storey 11 Wellesley on the Park condo tower on the property partly visible on the left side of St Luke Lane (presently occupied by a row of trees and a condo presentation centre behind them).

 

 

 

Chaz.Yorkville condominiums

 

ChazYorkville condos

Chaz.Yorkville Condominiums, on Charles Street between Yonge and Church Streets, is a project of 45 Charles Ltd. and Edenshaw Homes Limited.

 

 

ChazYorkville condos

A signature design element of Chaz.Yorkville is the large rectangular box that juts from the tower’s south side. It’s the Chaz Club, a 2-storey private club for exclusive use of condo residents.

 

 

ChazYorkville condos

The tower was designed by Sol Wassermuhl of Page + Steele IBI Group Architects in Toronto. It will stand 47 storeys tall when complete.

 

 

Casa Condominium and ChazYorville Condos

Chaz.Yorkville is only a few weeks away from overtaking the height of its next-door neighbour, the 46-storey Casa Condominium tower, which was built in 2010.

 

 

One Bloor Condominiums

 

One Bloor Condos

Although construction has climbed only one-third of the way to its ultimate 75 storeys, the One Bloor condo tower is already making a huge architectural statement at the Yonge & Bloor crossroads in Yorkville. I shot this photo from the southwest corner of Yonge & Charles Streets.

 

 

One Bloor Condos

I often hear passersby comment favourably on the delightful sweeping curves of One Bloor’s podium and tower.

 

 

One Bloor Condos

Looking up at One Bloor from the southwest corner of the Yonge & Bloor intersection. The building was designed by Toronto’s Hariri Pontarini Architects.

 

 

One Bloor Condos

A view of One Bloor from the northwest, on Yonge Street just above Bloor

 

 

 

U Condos

 

U Condos

A view of the two U Condos towers from two blocks to the south on Bay Street, at Phipps Street. The construction crane at left is building the 32-storey 1Thousand Bay condo tower at the southwest corner of Bay and St Joseph Streets.

 

 

 U Condos

The west U Condos building has topped off at 45 storeys, while the east tower continues its climb toward 55 floors. U Condos is a project of Pemberton Group, and was designed by architectsAlliance of Toronto.

 

 

 

X2 Condominiums

 

X2 Condos

Construction crews are closing in the mechanical penthouse levels of the 49-storey X2 Condominiums at the southwest corner of Jarvis & Charles Streets

 

 

X2 Condos

X2 Condos viewed from one block to the southwest on Isabella Street. The tower is a project of Lifetime Developments and Great Gulf Homes.

 

 

X2 Condos

A September 3 view from the south of X2 Condos left, and the first X Condos, right, which was constructed in 2010. X2 was designed by Wallman Architects, while X Condos was designed by architectsAlliance.

 

 

A peek at the Pace Condos construction site

Pace Condos

December 6 2013: A view of the construction site for Pace Condos, located at the southwest corner of Jarvis & Dundas Streets

 

Approaching grade: Construction continues on the underground parking levels for the Pace Condos tower at the southwest corner of Jarvis and Dundas Streets in east downtown.

But in just a few weeks’ time, construction will reach grade and work will begin on the building’s 6-storey podium — the base for a 36-storey tower that will transform the east downtown skyline.

The steady approach to street level at means that, throughout 2014, neighbours and passersby will get a clear view of construction progress as the tower climbs skyward, eventually topping off with 42 residential floors. For now, pedestrians can catch a partially-obscured glimpse of building activity if they peek through a chainlink fence next to the sidewalk at the corner of Jarvis & Dundas.

A project of Great Gulf, Pace Condos was designed by Diamond Schmitt Architects. Residents of the 384-unit building will enjoy extensive recreational and fitness amenities on the tower’s 7th floor, including access to an outdoor swimming pool and a landscaped garden on the podium roof. The building will have more than 4,500 square feet of retail space at ground level.

Below is another photo of work on the underground parking levels, as well as an artistic rendering of the building.

 

Pace Condos

December 10 2013: Once two more underground parking levels have been completed, work on the 42-storey tower will begin to climb above street level.

 

 

Pace Condos

This illustration of the Pace Condos building appeared on a development proposal sign the City posted on the project site nearly three years ago. The tower was designed by Diamond Schmitt Architects.

 

Nicholas & FIVE condos making big visual impact on Yonge Street; 1 Bloor tower set to follow suit

north downtown Yonge Street

November 14 2013: Construction of FIVE Condos (left) and Nicholas Residences (center rear) is dramatically changing the landscape of north downtown Yonge Street. This is a view from the east side of Yonge just below Maitland Street, one block south of Wellesley Street.

 

 

Shifting landscape: Two condo tower construction projects are rapidly changing the look of Yonge Street’s west side, between College and Bloor Streets, while a third new building will soon make a dramatic impact on views up the east side of Yonge Street.

The steadily rising concrete frames for FIVE Condos and Nicholas Residences now dominate the views up Yonge from as far south as its intersection with Carlton and College Streets. Depending upon your particular vantage point along the 10-block stretch of what city planners call “north downtown Yonge,” FIVE and Nicholas already obscure or partially block from sight several skyscrapers in the Yorkville neighbourhood — including the 51-storey Manulife Centre tower, which has been a familiar landmark indicating the intersection of Bloor & Bay Streets since 1972.

But with a long way still to go before construction of FIVE and Nicholas is complete, it’s already obvious that both new buildings will exude an even more powerful presence on the landscape once they have attained their full height. As of this weekend, construction of Nicholas has reached the 27th level on the way to 35, with cladding and windows installed up to the 13th floor so far. Two blocks down the street, construction of FIVE Condos has climbed to the 16th storey — exactly one-third of its way to the building’s final 48 floors. Installation of that tower’s cladding has not yet begun.

Meanwhile, the One Bloor condo project is poised to begin an equally remarkable transformation of views up the east side of Yonge Street. Rising at the southeast corner of Yonge & Bloor Streets, One Bloor will ultimately top off at 75 floors, completely reshaping the Yorkville skyline and one of the country’s most famous crossroads in the process.

 

One Bloor condos

November 27 2013: Looking toward the One Bloor condo construction site from one block to the south, at the intersection of Yonge and Charles Streets.

 

 

CONTINUED ON PAGE 2

First Gulf breaks ground for Globe & Mail Centre; 17-storey tower will bring jobs to SE downtown

Phillip Crawley, Bill Hatanaka, Brad Duguid, David Gerofsky, Mayor Rob Ford and Councillor Pam McConnell

Globe and Mail Publisher Phillip Crawley, left, OpTrust President & CEO Bill Hatanaka, Ontario Minister of Training, Colleges & Universities Brad Duguid, First Gulf Corporation CEO David Gerofsky, Toronto Mayor Rob Ford and Toronto City Councillor Pam McConnell wield shiny silver shovels at the recent groundbreaking ceremony for the new Globe and Mail Centre at King & Berkeley Streets.

 

 

Construction kick-off: For the past half-dozen years, Toronto’s southeast downtown has been teeming with a variety of low-, mid- and high-rise residential construction projects that have been steadily transforming the city’s Old Town, Corktown, Distillery District and West Don Lands areas. A new 500,000 square foot office tower that First Gulf Corporation has started building at King, Berkeley and Front Streets will boost the region’s revitalization even more, bringing up to 5,000 jobs to the bustling area.

First Gulf Corporation recently broke ground on its 17-storey Globe and Mail Centre, named after the building’s anchor tenant, The Globe and Mail newspaper, which will relocate from its current premises near Front Street and Spadina Avenue on the west side of downtown. Local politicians joined executives from The Globe and Mail, plus First Gulf and its development partner OPTrust, in an October 30 ground-breaking ceremony that officially kicked off construction of the Centre. Completion of the tower is anticipated for 2016.

Designed by Toronto’s Diamond Schmitt Architects, The Globe and Mail Centre will cut  a unique profile on the southeast downtown skyline thanks to the building’s distinctive design of stacked, alternate-sized floor plates and large outdoor terrace spaces. Ten-foot-tall windows will let natural light penetrate deep into the building interior, while presenting occupants with expansive views of Toronto’s waterfront, Financial District, and adjacent residential neighbourhoods.

 

Gobe and Mail Centre building rendering

This artistic illustration, by Diamond Schmitt Architects, shows how the Globe & Mail Centre will look when viewed from the southeast along Berkeley Street

 

 

CONTINUED ON PAGE 2

One Bloor condo building progress finally in view

One Bloor condo construction is now visible above the sidewalk hoarding

August 17 2013: Work on the 75-storey One Bloor condo tower finally comes into view as podium construction climbs above the sidewalk scaffolding …

 

 

Buildings at the SE corner of Yonge & Bloor being demolished in August 2008

… five years after demolition machines razed the low-rise retail, restaurant and office buildings that had occupied the southeast corner of Yonge & Bloor

 

 

Show time: It has taken five years, but people passing through the bustling Yonge & Bloor intersection can once again see a building structure (albeit one still in the very early stages of construction) standing on the southeast corner.

Five years ago this month, the southeast corner of Yonge & Bloor was surrounded by scaffolding, above which passersby could see demolition machines razing the upper floors of several low-rise retail, restaurant and office buildings that had occupied the corner property for decades. They were clearing away the old structures — and the pedestrian-friendly Roy’s Square lane behind them — to make room for construction of a highly-hyped 80-storey condo, hotel & retail complex that developer Bazis International called 1 Bloor.

With a promised “iconic” design, 1 Bloor would become a striking new landmark for the Yonge & Bloor area, and claim bragging rights to the title of tallest residential building in Canada. Prospective purchasers lined up for days before the presentation centre opened and, once it did, units sold like hot cakes.

By mid-September of 2008 the old buildings on the 1 Bloor site were completely demolished, leaving nothing but a big empty lot for passersby to see through security fences set up around the property. Architecture and building buffs — not to mention all the people who had bought condos at 1 Bloor — anxiously awaited word that construction was about to start.

 

1 Bloor promotional billboard November 13 2007

November 13 2007: This billboard advertised the original 1 Bloor condo tower that developer Bazis International had planned for the site.

 

 

CONTINUED ON PAGE 2

X2 Condos turning heads at Jarvis & Charles

X2 Condos

April 17 2013: Construction of the X2 Condominium tower has climbed 5 floors on the way to 49, as seen in this view from the northwest on Charles Street. Click on the picture to view a larger-size image.

 

 

Eye catcher: When 2012 drew to a close, construction of the X2 Condos at the southwest corner of Jarvis & Charles Streets was just beginning to rise above the hoarding that blocked most of the site from the view of passing motorists and pedestrians. As New Year’s approached, a couple of support columns for the 49-storey tower’s ground floor were taking shape near the west end of the building site — the first signs of construction progress visible from street level.

With construction now up to five floors, passersby can’t help but notice the building — and get an early sense of the tremendous visual impact it will have in the Bloor-Jarvis neighbourhood once construction is complete.

I have walked past the X2 Condos site three times in the past two weeks, and on each occasion have noticed that the building is commanding considerable attention from people passing by both on foot and in vehicles. I saw pedestrians pause to watch the construction work, and noticed dozens of vehicle drivers and passengers checking out the site while waiting for traffic lights to change at the busy Jarvis-Charles-Mt Pleasant intersection.

CONTINUED ON PAGE 2

$1.95 million penthouse still up for grabs as construction winds down at Charlie Condos

Charlie Condos

January 10 2013: Charlie Condos (second tower from left) stands proudly on the Entertainment District skyline. Its nearby highrise condo neighbours include M5V Condos (with the bold red mechanical room box on its west side), Cinema Tower (with the construction crane) and Festival Tower (right).

 

Charlie Condos

February 9 201: Looking up at the 36-storey Charlie tower from King Street

 

 

Final few with a superb view: Looking for a brand-new condo with plenty of space and spectacular views — plus an immediate closing? If you’ve got $1 million or more to spend, a spacious upper-level suite at Charlie Condos could be yours today.

Four years ago, a parking lot occupied the northwest corner of King & Charlotte Streets in the Entertainment District. Today, Charlie towers 36 storeys on the site, with owners of its 314 suites gradually taking occupancy of their units as construction draws to a close.

But anyone who missed out on purchasing a suite either before or during construction still has an “exceptional opportunity” to buy a signature suite on one of Charlie’s top floors.

 

 

CONTINUED ON PAGE 2

Pit Stops: Photo roundup of below-ground and at-grade construction activity at 21 downtown condo, office & university building sites

Picasso on Richmond condos

As 2012 drew to a close, some noteworthy downtown building projects had reached different stages of at- and below-grade construction progress. At some sites, like this one for the Picasso on Richmond condo tower, preliminary foundation drilling work was in full swing …

 

Studio on Richmond condos

… while at others, like this one for the Studio on Richmond and Studio2 condo towers just two blocks east of Picasso, site excavation was ongoing.

 

The Yorkville condos

Over the same period of time, underground parking levels were taking shape at some building sites, like this one for The Yorkville condo project on Davenport Road …

 

X2 Condos

… while over on Charles Street East, construction had reached a milestone mark at X2 Condos, where building had started on the ground level of the tower

 

Fall photos: Until condo and office tower construction starts to climb above street level, it can be difficult to track how quickly work is progressing on the dozens of new buildings going up in Toronto’s downtown core. Ground-level views of building sites are often obscured by hoarding and security fences, plus concrete delivery trucks, dump trucks and other construction vehicles maneuvering into and out of staging areas adjacent to construction zones. I find it’s a big challenge to monitor ongoing progress at places where underground levels are taking shape, let alone keep an eye on sites where shovels are just breaking ground or preliminary work is being undertaken to prepare for full-scale construction. The vast number of projects scattered throughout the downtown core certainly doesn’t make the task any easier.

 

CONTINUED ON PAGE 2

Construction underway on completely sold-out Pace condo tower project at Dundas & Jarvis

Pace Condos

December  13 2012: “Sold Out” signs dominate the hoarding around the Pace Condos construction site on the southwest corner of Dundas and Jarvis Streets

 

Pace Condos

December 13 2012: A foundation shoring machine towers above the hoarding along the Dundas Street sidewalk next to the Pace Condos site

 

Sales success: Construction is in full swing on a 42-storey condo tower development that could help revitalize a scruffy southeast downtown neighbourhood that is home to dozens of shelters and social service agencies serving one of the country’s largest low-income communities.

Shoring and foundation drilling machines have been stirring up dust at the southwest corner of Dundas and Jarvis Streets, where Pace Condos will gradually climb skyward over the next three years. The Great Gulf project at 155 Dundas East — which was approved by Toronto City Council just over one year ago — has been a tremendous sales success for the developer. The 384-unit building is completely “sold out,” according to bold signage posted on sidewalk hoarding along the Dundas and Jarvis perimeters of the construction site.

 

CONTINUED ON PAGE 2

Fall photo update: One Bloor condo construction

1 Bloor condo

December 5 2012: Two construction cranes soar above the One Bloor condo tower excavation at Yonge & Bloor. Click on the photo to view a larger-size image.

 

Digging nearly done:  Last time I reported about construction progress on the One Bloor condo tower, in my September 4 2012 post, crews still had a huge amount of earth to excavate from the building site. As winter approaches some excavation work remains, but the two white construction cranes soaring above the property are a sure sign that the pace of building activity is going to pick up significantly. And at the bottom of the big pit more than five levels below the southeast corner of the busy Yonge & Bloor intersection, the base of the elevator core for the 75-storey skyscraper has started taking shape.

 

CONTINUED ON PAGE 2

Pit stop: X2 Condos parking floors filling in

X2 Condos

September 9 2012: Another underground parking level takes shape at the X2 Condos construction site at the southwest corner of Jarvis & Charles Streets. Nearly three of the building’s six below-grade levels have been constructed so far.

 

X2 Condos

September 9 2012: A closer view of an underground floor taking form

 

X2 Condos

September 9 2012: Rebar is being put in place to prepare for a concrete pour

 

X2 Condos

September 9 201: Jarvis Street view of construction progress on the 49-storey tower.

 

X2 condos rendering

A project of Great Gulf and Lifetime Developments, X2 Condos was designed by Toronto’s Rudy Wallman Architects Ltd. The tower will have 470 suites.

 

X2 Condos tower rendering

This artistic rendering, which appears on the project website, depicts a view of the 49-storey tower from the northeast.

 

 X Condominium

X2 Condos will be a sister to the X Condominium tower on the north side of Charles Street (seen here in a view from the southeast on August 30 2011).  The 44-storey X Condos, which opened for occupancy two years ago, was designed by architectsAlliance.  Together, the developers say, X and X2 will stand as an eastern “gateway to Yorkville/Bloor.”