Tag Archives: U Condos

Bay Street towers at sunset

Bay Street towers at sunset

Bay Street condo and apartment towers stand in silhouette under fiery orange clouds during tonight’s sunset (as seen from my balcony east of Jarvis Street). The buildings topped by construction cranes are the two U Condos towers at Bay and St Mary Streets (far right) and the FIVE Condos tower at Yonge and St Joseph Streets (second from right). Bookending the view at far left are the Murano and Burano condo towers at Bay and Grosvenor Streets.

 

Looking up at some of the new skyscrapers making their mark on the downtown Toronto skyline

RBC WaterPark Place

The new RBC WaterPark Place office tower practically blends into the clouds in this view from the west on lower York Street on September 16 2014

 

 

South Financial Core towers

while four new towers reach for the clouds above the south downtown core. At left are the Delta hotel and Bremner office tower at Southcore Financial Centre on Bremner Blvd. Soaring skyward at right are the two ÏCE Condos on York Street.

 

 

1 Bloor condos

The sensuous curves of the One Bloor condo tower are already adding interest and excitement to the once-drab Yonge & Bloor intersection in Yorkville.

 

 

Below are more photos of the towers shown above, as well as other hotel, office and condo skyscrapers that I photographed this past week.

 

 

RBC WaterPark Place office building

 

RBC WaterPark Place

West side of RBC WaterPark Place viewed from lower York Street

 

 

RBC WaterParkPlace

South face of RBC WaterParkPlace seen from Queen’s Quay Blvd. The tower was designed by WZMH Architects of Toronto.

 

 

RBC WaterParkPlace

Upper half of the 30-storey tower, viewed from the southwest

 

 

RBC WaterPark Place

Another view of the tower from Queen’s Quay to the southwest

 

 

Studio on Richmond condominiums

 

Studio on Richmond

Looking up the north side of the Studio on Richmond condo tower situated between Simcoe and Duncan Streets in the Entertainment District. It will top off at 31 storeys. Its 41-storey sister tower, Studio2, is currently under construction behind it on Nelson Street.

 

 

Studio on Richmond condo

Studio on Richmond podium and tower viewed from the north side of Richmond Street near Simcoe Street

 

 

Studio on Richmond condo

The two-tower Studio on Richmond condo complex was designed by Quadrangle Architects of Toronto.

 

 

Studio on Richmond condo

A view of the Studio on Richmond condo from the west on Richmond Street near Duncan Street. The building is a project of Aspen Ridge Homes.

 

 

 Delta Hotel and Bremner office tower at Southcore Financial Centre

 

Delta Hotel and Bremner office tower

The Delta Toronto hotel (left) and the Bremner office tower are nearing completion at Southcore Financial Centre on Bremner Boulevard between York Street and Simcoe Street. The buildings are seen here from Roundhouse Park, near the Toronto Railway Museum.

 

 

 

Delta Hotel and Bremner office tower

The 45-storey Delta Hotel tower reflects on the west wall of the 30-storey Bremner office tower in this view from the southwest corner of Lower Simcoe Street and Bremner Boulevard.

 

 

Delta Hotel

Looking up the northwest corner of the Delta Hotel. The Bremner office tower is partially visible behind it.

 

 

 

Delta Hotel

Upper west side of the Delta Hotel. Scheduled to open in 2015, the Delta will be a premium 4-star hotel with 567 guest rooms.

 

 

Delta Hotel

The angled south face of the Delta Hotel, seen from Bremner Boulevard

 

 

 

The L Tower condominium

 

The L Tower

Upper floors of The L Tower seen from the west on Sept 16 2014. The dramatically curved skyscraper was designed by architect Daniel Libeskind.

 

 

 

The L Tower

A closer view of some of the upper levels of the 58-storey L Tower, which is located at the corner of Yonge Street and The Esplanade, directly behind the Sony Centre for the Performing Arts.

 

 

The L Tower

The L Tower makes an emphatic point on the downtown skyline

 

 

The L Tower

A telephoto view of the construction crane that has soared above The L Tower construction site for the past several years

 

 

The Mercer condo tower

 

The Mercer condo

Looking up the southeast corner of The Mercer condo building, which rises 33 storeys at the corner of Mercer and John Streets in the Entertainment District

 

 

The Mercer condo

The Mercer was designed by BBB Architects, and is a project of Graywood Developments Ltd. and Beaveerhall Homes.

 

 

 

Three Hundred Front Street West condominiums

 

 

300 Front Street West condos

The upper floors of the 49-storey Three Hundred Front Street West condo tower

 

 

300 Front Street West condos

Looking up the southeast corner of Tridel’s Three Hundred Front West condo. The building was designed by Toronto’s Wallman Architects.

 

 

Theatre Park condominiums

 

Theatre Park condo

The 47-storey Theatre Park condo tower is under construction on King Street West, right next door to Toronto’s historic Royal Alexandra Theatre. I shot this photo of Theatre Park from two blocks to the northwest.

 

 

Theatre Park condo

Theatre Park was designed by architectsAlliance of Toronto. The condo is a project of Lamb Development Corp., Niche Development and Harhay Construction Management Ltd.

 

 

Theatre Park Condos

Glass balcony panels are gradually being installed on the tower’s north side

 

 

Theatre Park Condos

Design details on the tower’s west side

 

 

ÏCE Condominiums

 

ICE Condos

The upper west sides of the 67- and 57-storey ÏCE Condominiums, located at 12 and 14 York Street in the south downtown core

 

 

ICE Condos

The top of the 67-floor ÏCE Condo at 14 York Street. A project of Lanterra Developments, the two skyscrapers were designed by Toronto’s architectsAlliance.

 

 

 

ICE Condos

 ÏCE Condo towers viewed from the southeast on Queen’s Quay Blvd.

 

 

ICE Condos

A view of the two towers from Grand Trunk Crescent to their northwest

 

 

 

Aura condominium

 

Aura condo tower

I shot this pic of the 78-storey Aura condominium tower from the podium green roof at Toronto City Hall. Aura is the tallest condominium building in Canada.

 

 

 

Aura condos

The upper third of Aura, viewed from several blocks to the southwest

 

 

 

Aura condo tower

A view of Aura from two blocks to the west on Elizabeth Street

 

 

Aura condo tower

Aura viewed from the northwest corner of College Park. A Canderel development project, the tower was designed by Graziani & Corazza Architects Inc.

 

 

 

Aura condos

The top of Aura, viewed from the southwest

 

 

Aura Condos

The top of Aura, viewed from the north

 

 

Nicholas Residences condominiums

 

Nicholas Residences

A view of 35-storey Nicholas Residences from the north on Balmuto Street. The condo is a project of Urban Capital and Alit Developments.

 

 

Nicholas Residences

Looking up the tower’s northwest corner, from the intersection of St Mary and St Nicholas Streets. The building was designed by Toronto’s Core Architects Inc.

 

 

Nicholas Residences

Nicholas viewed from the southwest on St Nicholas Street.

 

 

Nicholas Residences

West side of Nicholas, viewed from St Mary Street near Bay Street

 

 

 

FIVE Condominiums

 

FIVE Condo tower

Looking toward the 48-storey FIVE Condos tower from two blocks to the southeast, at the corner of Yonge and Maitland Streets.  To its right is the Nicholas Residences condo tower, two blocks north.

 

 

 

FIVE Condo tower

FIVE Condos was designed by Toronto’s Hariri Pontarini Architects

 

 

FIVE Condo tower

Looking up the south side of FIVE Condos from Wellesley Street West

 

 

FIVE Condo tower

The tower has a wonky appearance when viewed from the south, thanks to the undulating pattern of balconies on the east and west sides.

 

 

FIVE Condos S

Construction of the tower’s mechanical penthouse is underway. FIVE Condos is a project of MOD Developments Inc., Graywood Developments Ltd., Tricon and Diamondcorp.

 

 

 

FIVE Condos

Windows on the east side of FIVE Condos on September 5

 

 

FIVE Condos

FIVE Condos viewed from the east on the morning of September 11

 

 

 

FIVE Condo tower

A view of FIVE from the south on St Luke Lane, next to the Toronto Central YMCA Centre (left).  This view will change drastically in several years when Lanterra Developments builds its 60-storey 11 Wellesley on the Park condo tower on the property partly visible on the left side of St Luke Lane (presently occupied by a row of trees and a condo presentation centre behind them).

 

 

 

Chaz.Yorkville condominiums

 

ChazYorkville condos

Chaz.Yorkville Condominiums, on Charles Street between Yonge and Church Streets, is a project of 45 Charles Ltd. and Edenshaw Homes Limited.

 

 

ChazYorkville condos

A signature design element of Chaz.Yorkville is the large rectangular box that juts from the tower’s south side. It’s the Chaz Club, a 2-storey private club for exclusive use of condo residents.

 

 

ChazYorkville condos

The tower was designed by Sol Wassermuhl of Page + Steele IBI Group Architects in Toronto. It will stand 47 storeys tall when complete.

 

 

Casa Condominium and ChazYorville Condos

Chaz.Yorkville is only a few weeks away from overtaking the height of its next-door neighbour, the 46-storey Casa Condominium tower, which was built in 2010.

 

 

One Bloor Condominiums

 

One Bloor Condos

Although construction has climbed only one-third of the way to its ultimate 75 storeys, the One Bloor condo tower is already making a huge architectural statement at the Yonge & Bloor crossroads in Yorkville. I shot this photo from the southwest corner of Yonge & Charles Streets.

 

 

One Bloor Condos

I often hear passersby comment favourably on the delightful sweeping curves of One Bloor’s podium and tower.

 

 

One Bloor Condos

Looking up at One Bloor from the southwest corner of the Yonge & Bloor intersection. The building was designed by Toronto’s Hariri Pontarini Architects.

 

 

One Bloor Condos

A view of One Bloor from the northwest, on Yonge Street just above Bloor

 

 

 

U Condos

 

U Condos

A view of the two U Condos towers from two blocks to the south on Bay Street, at Phipps Street. The construction crane at left is building the 32-storey 1Thousand Bay condo tower at the southwest corner of Bay and St Joseph Streets.

 

 

 U Condos

The west U Condos building has topped off at 45 storeys, while the east tower continues its climb toward 55 floors. U Condos is a project of Pemberton Group, and was designed by architectsAlliance of Toronto.

 

 

 

X2 Condominiums

 

X2 Condos

Construction crews are closing in the mechanical penthouse levels of the 49-storey X2 Condominiums at the southwest corner of Jarvis & Charles Streets

 

 

X2 Condos

X2 Condos viewed from one block to the southwest on Isabella Street. The tower is a project of Lifetime Developments and Great Gulf Homes.

 

 

X2 Condos

A September 3 view from the south of X2 Condos left, and the first X Condos, right, which was constructed in 2010. X2 was designed by Wallman Architects, while X Condos was designed by architectsAlliance.

 

 

U Condos townhouse & tower construction asserts strong visual presence along Bay & St Mary Streets

U Condos construction viewed from Bay Street

August 17 2013: Above-ground construction is still in relatively early stages, but the U Condos condo tower and luxury townhouse complex … 

 

U Condos site viewed from Bay & Irwin Streets

… has already drastically transformed the southwest corner of Bay and St Mary Streets, seen here on September 26 2008 when a surface parking lot still occupied part of the development site

 

 

Strong presence: Construction of the U Condominiums complex is really beginning to turn heads on Bay Street now that one of its two towers is climbing steadily higher above its 3-storey podium and the concrete shells for luxurious townhouses that will wrap around three sides of the property.

Although passersby have been able to see above-ground construction activity since January, it has been only in recent weeks that the huge scale of the project — and the tremendous visual impact it will have on the neighbourhood — have become apparent.

The project’s  townhouse component has noticeably changed the pedestrian experience on Bay Street, while the west tower — which has climbed more than six storeys on its way to 45 — already hints at how drastically it and the even taller east tower will change the neighbourhood skyline. (Construction of the east tower has so far reached only as high as the townhouses.)

 

U Condos at Bay & St Mary Streets in Toronto

This artistic illustration, from an online promotional brochure that had been available on the U Condos website, shows how the completed towers will look when viewed from the same perspective as the two photos above.

CONTINUED ON PAGE 2

U Condos construction reaches street level

UCondos

This was how the U Condos construction site looked on January 21 of last year.  As the yellow foundation drilling machine continued its work …

 

U Condos

… an enormous mound of soil (upper right) still had to be excavated from the site …

 

U Condos

… but one year later (January 26 2013, to be exact), underground parking levels have filled in the giant L-shaped excavation, and construction of the 2 condo towers and 19 town homes has reached ground level. Building forms for support columns for the ground level of the West Tower (left) already rise above grade.

 

 

Above is a link to a Flickr album containing three dozen photos of U Condos construction since the beginning of December. Click the image once to view a small-format slideshow, or click twice to access the album and view full-size photos instead.

 

U Condos construction approaches grade

U Condos

December 6 2012: A view of the U Condos building site, looking northeast toward the intersection of Bay Street and St Mary Street, as construction of the project’s underground parking floors approaches ground level. A row of 3-storey “urban townhomes” will rise in the immediate foreground — the southern flank of the 2-tower condo complex.

 

U Condos

December 6 2012: Construction progress at the southwest corner of the U Condos property, where the 45-storey west tower will rise. Townhomes will extend across this side of the site.

 

U Condos

December 6 2012: Looking southeast from St Mary Street toward the site where the 50-storey east tower will rise. Concrete will soon be poured atop the building forms in the foreground, which are nearly at street level.

 

U Condos

From the U Condos website, this photo offers an October 2012 aerial view of the construction

 

Making grade: As autumn draws to a close, construction of the U Condos tower and townhouse complex is drawing closer to ground level.

Forms have been put in place along much of the west half of the property to prepare for concrete pours that will create the ceiling of the P1 level. That area is where the 45-storey West Tower will rise, as well as a row of “urban townhomes” along on the north and south perimeters of the property. Although similar building forms haven’t yet been installed on the east half of the site, where the 50-storey East Tower will soar skyward above more townhouses along Bay Street and St Mary Street, construction progress on that part of the project isn’t far behind.

Although the two tall towers will become skyline landmarks at the east (Bay Street) end of the University of Toronto campus, the 19 townhouses that will enclose the complex will ensure that U Condos stands out at street level, too. Indeed, they will give the U Condos project a unique look on Bay Street, sharply distinguishing the complex from all nearby condo, apartment and office highrises.

 

CONTINUED ON PAGE 2

U Condos underground floors filling in

U Condos August 19 2012

August 19 2012: A view from St Mary Street of below-grade construction progress for the 50-storey U Condos east tower …

 

U Condos August 19 2012

… and for the 45-storey west tower

 

U Condos

August 19 2012: South view of below-grade progress on the the west tower, where the third underground parking level is taking shape

 

U Condos

August 19 2012: Looking toward the northeast corner of the U Condos site as the underground parking floors continue to take form

 

Parking progress:  When I last published photos of progress at the U Condos site back on March 4 2012, crews were preparing for the installation of the construction cranes while still excavating the vast L-shaped site next to the University of Toronto campus at Bay and St Mary Streets.

Since then, the underground levels for the two U Condos towers have steadily been taking shape, with work this month progressing to the third floor below ground.

 

CONTINUED ON PAGE 2

Crane installation imminent at U Condos site

U Condos Toronto

March 2 2012: A construction crane base pad is being assembled on the site where the 45-storey U Condos west tower will rise

 

U Condos Toronto

March 2 2012: A closer view of the crane pad

 

Crane coming: A construction crane will soon soar above the University of Toronto campus from the vast excavation for the two-tower U Condos development at Bay and St Mary Streets.

Late last week, crews began building a crane base on the site of the project’s 45-storey west tower, between St Mary Street to the north, University of Toronto’s Elmsley Hall and Brennan Hall to the west, and historic St Basil’s Church to the south. At least one more crane will be installed at some point to help build the 50-storey east tower, which will rise just to the northeast of the church, along Bay Street. Besides the two towers, the U Condos development will include multi-level townhouses on the north, east and south sides of the property, along with courtyards, pedestrian passageways, and a park extending south toward St Joseph Street.

 

CONTINUED ON PAGE 2

In Photos: Summer construction activity in north downtown and the Bloor-Yorkville area (Part 1)

77 Charles West condo Toronto

August 13 2011: Newly-installed glass curtain wall cladding on the 77 Charles West luxury condo building, seen (above and below) from St Thomas Street

 

77 Charles West condo Toronto

 

 

77 Charles West condos reaches 12 floors; cladding installation begins

 

Going green: Construction on the 77 Charles West luxury condo midrise could be topping off later this month, now that 12 of the building’s 13 floors have been built. Meanwhile, down at street level, the facade is beginning to reflect some of its nearby condo neighbours as its striking green-hued curtain wall cladding gradually gets installed.

I was surprised when I saw some of the first panels being put in place five days ago because the glass is turquoise green rather than blue, as renderings on the project website suggested it would be. Nevertheless, I like how it looks — and think it makes 77’s neighbours look good, too. Depending upon where I stood while looking at the new windows this morning, I saw sharp reflections of the One St Thomas Residences condo tower across the street, the Residences of the Windsor Arms at 22 St Thomas Street one block north, and other buildings in the Bloor-Yorkville area.

So far, the cladding encloses just three storeys around what will be the Charles Street entrance to the condominium homes (the 13 floors of luxury condos rise above Kintore College and Cultural Centre, a three-storey residence and educational facility for female Catholic students attending University of Toronto). I’m anxious to see how the cladding will look on the rest of the floors, especially on the curved south side of the building.

77 Charles West is a project of Aspen Ridge Homes, and was designed by Yann Weymouth of HOK.

Below are more photos of the new cladding and recent construction progress. Previous construction updates can be found in blog posts on July 5 2011, April 7 2011, and February 15 2011 —  my first report on the 77 Charles West project.

 

77 Charles West condos

August 6 2011: 77 Charles West condo construction viewed from St Thomas Street

 

77 Charles West condos Toronto

August 6 2011: New promotional signage on the building’s north side

 

77 Charles West condos Toronto

August 6 2011: Floors on the northwest corner of the building

 

77 Charles West condos Toronto

August 6 2011: St Mary Street view of the building’s curved southwest corner

 

77 Charles West condos Toronto

 August 8 2011: Crews install the first 3-storey section of glass cladding

 

77 Charles West condos Toronto

 August 8 2011: Workers put the green-hued glass curtain wall panels in place

 

77 Charles West condos Toronto

August 8 2011: A closer look at the cladding over the second and third storeys

 

77 Charles West condos Toronto

August 13 2011: New cladding viewed from Charles Street, looking west

 

77 Charles West condos Toronto

August 13 2011: Cladding above the entrance that faces north up St Thomas Street

 

77 Charles West condos Toronto

August 13 2011: The cladding reflects several nearby buildings including the Residences at the Windsor Arms, the One St Thomas Residences, 155 Cumberland Street condos, and The Colonnade apartment building on Bloor Street

 

77 Charles West condos Toronto

August 13 2011: Street-level view of the cladding’s neighbourhood reflection

 

77 Charles West condos Toronto

August 16 2011: Reflection of the nearby Residences of the Windsor Arms

 

77 Charles West condos Toronto

August 13 2011: One of the construction entrances on Charles Street

 

77 Charles West condos Toronto

August 13 2011: A closer look at a corner section of the glass curtain wall

 

77 Charles West condos Toronto

August 13 2011: New cladding viewed from the west end of the building

 

77 Charles West condos Toronto

August 13 2011: Cladding reflects the One St Thomas Residences across the street

 

«»

 

Enormous excavation for U Condominiums keeps getting deeper & wider

 

U Condos Toronto

August 6 2011: Excavation progress along the Bay Street side of the U Condos site, where the 50-storey east tower will rise


Digging down:  Whenever I checked out excavation activity at the U Condominiums site back in the spring, it always seemed like the earth was moving at a snail’s pace. I thought it might take until the end of the year before the digging would reach anywhere near the 15-metre depth required for construction of the foundation for the project’s two condo towers, which will rise 45 and 50 storeys tall.  Excavation work appeared to be moving well along the east, south and west perimeters of the property, but a  vast amount of earth remained in the center and along the north perimeter.  Since June, however, the excavation has progressed at an amazing pace, and the big hole in the ground at Bay and St Mary Streets is now more than two levels deep across most of the property.

U Condos is a project by The Pemberton Group. Its two condo towers, along with 3-storey townhouses that will flank the north, east and south sides of the development, were designed by Peter Clewes of Toronto’s architectsAlliance.

Below are photos showing summer excavation progress at the U Condos location.  Earlier construction photos can be viewed in my blog posts on May 7 2011, April 2 2011, March 18 2011, and February 4 2011 — my first report on the U Condos project.

 

U Condos Toronto

June 21 2011: Looking southeast toward Bay Street from the U Condos construction entrance off  St Mary Street

 

U Condos Toronto

 June 21 2011:  Looking towards the eastern side of the site along Bay Street

 

U Condos Toronto

June 21 2011: A construction supervisor watches excavation activity about 20 feet below. Bay Street is on the other side of the hoarding behind him.

 

U Condos Toronto

 June 21 2011: The southeastern corner where the 50-storey condo tower will rise

 

U Condos Toronto

June 21 2011: Excavation on the south side of the site next to St Basil’s Church

 

U Condos Toronto

July 3 2011: Excavation progress at the location for the east condo tower

 

U Condos Toronto

July 3 2011: Excavation equipment and machines near the ramp off Bay Street

 

U Condos Toronto

July 3 2011: An excavator on the south side of the site near St Basil’s Church. A row of 3-storey townhouses will be built along that edge of the U Condos property.

 

U Condos Toronto

July 3 2011: The southwest corner of the U Condos property near Brennan Hall on the University of Toronto campus

 

U Condos Toronto

July 24 2011: A substantially wider and deeper area has been excavated at the southwest corner in the past three weeks

 

U Condos Toronto

July 24 2011: An excavator sits roughly where the east tower will be constructed

 

U Condos Toronto

July 24 2011:  Another view of the excavator from the St Mary Street entrance

 

U Condos Toronto

July 24 2011: Looking toward the southeast corner of the property from a security fence along St Mary Street

 

U Condos Toronto

August 6 2011: Significant excavation progress on the eastern third of the site

 

U Condos Toronto

August 6 2011: Looking toward St Basil’s Church across the center of the site

 

U Condos Toronto

August 6 2011: The 45-storey west tower will be built at this location

 

 

«»

 

Foundation work begins on north section of the One Bloor site

 

One Bloor condo tower Toronto

August 6 2011: Foundation drilling equipment on the One Bloor condo tower site

 

Drilling starts: One of Toronto’s biggest construction events took place in the middle of July when the groundbreaking ceremony was held for the much-awaited One Bloor condo tower at the southeast corner of the city’s premier Yonge & Bloor intersection. Drilling equipment had arrived on the site weeks earlier, but it wasn’t until July 15 that executive shovels turned soil to officially kick off construction of the 70-storey tower.

A project of Great Gulf Homes, One Bloor was designed by Hariri Pontarini Architects of Toronto.  My previous coverage of this condo project includes posts on July 15 2011, May 4 2011, and January 10 2011 — my first report on One Bloor.

Below are several recent photos of construction equipment on the One Bloor property. Numerous tower renderings and a full architectural description of the building can be viewed at this page on the Hariri Pontarini website.

 

One Bloor condo tower Toronto

 July 13 2011: Pedestrians walk on Yonge Street south of Bloor Street, passing foundation drilling machines on the One Bloor site

 

One Bloor condo tower Toronto

 July 13 2011: Yonge Street view of the One Bloor site, looking east toward the Xerox Tower at 33 Bloor Street East

 

One Bloor condo tower Toronto

July 13 2011: A man walks along the temporary subway station access path next to the north side of the One Bloor condo tower location

 

One Bloor condo tower Toronto

August 6 2011: Foundation building equipment on the One Bloor site

 

One Bloor condo tower Toronto

August 6 2011: A ground level view of the north half of the tower site

 

 

Neighbourhood Watch: Photos of Bloor-Yorkville area condos and construction activity (Part 2)

Casa condominium tower on Charles Street West

May 5 2011: The 46-storey Casa condo on Charles Street West, viewed from a driveway between the Bloor Street Neighbourhood condo (left) and the St Charles Court apartment building (right)

 

Bloor Street Neighbourhood condos

May 5 2011: looking up at the L-shaped Bloor Street Neighbourhood condo tower

 

Bloor Street Neighbourhood condos

May 5 2011: Balconies on the west side of Bloor Street Neighbourhood

 

driveway betwen Bloor Street Neighbourhood condo tower and Charles Court apartments

May 5 2011: South view toward the Casa condo tower from a driveway linking Hayden Street and Charles Street between the Bloor Street Neighbourhood condo tower and Charles Court apartments

 

walkway between Charles Court apartments and Bloor Street Neighbourhood condo tower

May 5 2011: Pedestrians take a short-cut north to Hayden Street along the driveway between the Charles Court apartments (left) and the Bloor Street Neighbourhood condo tower

 

Uptown Residences and Crystal Blu condo towers

May 6 2011: A driveway just two vehicles wide is all that separates The Uptown Residences (left) and Crystal Blu Condos, new condo towers on Balmuto Street

 

Uptown Residences condo tower

May 6 2011: Construction on the exterior of The Uptown Residences is complete — except for the condo tower’s main entrance on Balmuto Street

 

Four Seasons Toronto Hotel + Residences

May 6 2011: Construction of the Four Seasons Toronto Hotel + Residences, viewed from outside The Uptown Residences

 

Four Seasons Toronto Hotel + Residences

May 6 2011: Four Seasons Toronto Hotel + Residences viewed from Balmuto Street

 

Four Seasons Toronto hotel + residences

April 30 2011: Four Seasons Toronto Hotel + Residences tower viewed from the northwest corner of Bloor and St Thomas Streets

 

Four Seasons Hotel + Residences Toronto

May 5 2011: Four Seasons Hotel + Residences Toronto construction viewed from Church Street near Park Road

 

Milan condo tower at Yonge & Church

April 23 2011: Looking south at the excavation progress for the Milan condo tower under construction at Yonge & Church

 

Milan condo tower at Yonge & Church

April 23 2011: View toward the southeast corner of the Milan condo tower excavation site, from the Canadian Tire store parking lot next door

 

Milan condo tower at Yonge & Church

April 23 2011: Deep excavation in the site’s southeast corner on Church Street

 

Milan condo tower at Yonge & Church

April 23 2011: Excavation activity near the Yonge subway line at the north side of the Milan condo tower construction site

 

Milan condo tower at Yonge & Church

April 23 2011: The Milan condo tower excavation entrance ramp off Church Street

 

Milan condo tower at Yonge & Church

May 5 2011: A view of the Milan excavation from the site’s southeast corner on Church Street, as a subway train passes the east side of the construction area.

 

Milan condo tower at Yonge & Church

May 5 2011: Church Street view through security fencing toward the northeast corner of the Milan condo tower construction site

 

Milan condo tower at Yonge & Church

May 5 2011: Looking north from Church Street toward the Canadian Tire store next to the Milan condo construction zone

 

Milan condo tower at Yonge & Church

May 5 2011: view toward the east side of the Milan site from the Church Street construction entrance ramp

 

Milan condo tower at Yonge & Church

May 5 2011: Church Street view of the Milan site, looking northeast

 

Seventy Seven Charles West condos

April 30 2011: Construction progress at the Seventy Seven Charles West condos viewed from Charles Street

 

Seventy Seven Charles West condos

April 30 2011: Seventy Seven Charles West condos viewed from the corner of St Thomas and Charles Streets

 

Seventy Seven Charles West condos

April 30 2011:  Looking south on St Thomas Street at the Seventy Seven Charles West condos

 

One St Thomas condo tower

April 22 2011: A window washer descends the south side of the 29-storey One St Thomas condo tower, which sits directly across Charles Street from the Seventy Seven Charles west condo construction site

 

One St Thomas condo tower

April 22 2011:  The cleaner works his way down the limestone-clad wall

 

One St Thomas condo tower

April 22 2011: His job perk is a view inside some of the city’s most exclusive luxury condos

 

One St Thomas condo tower

April 22 2011: The tower, which evokes highrise buildings from 1920s and 1930s-era New York City, was designed by Robert A.M. Stern Architects

 

Nicholas Residences condo construction site

May 6 2011: Hoarding is installed along St Nicholas Street and heavy machinery positioned on St Mary Street as crews prepare to demolish buildings where the Nicholas Residences condo tower will be constructed

 

Nicholas Residences condo tower construction site

May 6 2011: This building was formerly home to Regis College, the Jesuit Graduate Faculty of Theology at the University of Toronto. The interior has been gutted, and demolition of the brick exterior is imminent

 

Nicholas Residences condo tower construction site

May 6 2011: Nicholas will rise 35 storeys next to the Church of Scientology Toronto building, left, at the corner of Yonge & St Mary Streets

 

U Condos construction site

April 30 2011: Bay Street view of excavation progress at the U Condos construction site, looking northwest toward hoarding along St Mary Street. The construction crane for the Seventy Seven Charles West condo building rises behind Loretto College, the 6-storey brick building toward the upper left of the photo.

 

U Condos construction site

April 30 2011: Looking from Bay Street toward excavation machinery at the northwest corner of the U Condos construction site

 

A shoring machine on the U Condos construction site

April 30 2011: A shoring machine on the U Condos construction site

 

U Condos foundation construction

April 30 2011 A steel I-beam sunk into the ground to help shore up the huge U Condos site for excavation and foundation construction

 

U Condos construction site excavation

April 30 2011: Southward view from St Mary Street of excavation progress on the U Condos construction site

 

U Condos construction site excavation

April 30 2011 St Mary Street view toward the southeast corner of the U Condos construction site

 

U Condos construction site

April 30 2011 St Mary Street view toward the southwest corner of the U Condos construction site

 

U Condos construction site

April 30 2011 St Mary Street view toward the southwest corner of the U Condos construction site

 

U Condos construction site

April 30 2011: A shoring machine in the SW corner of the U Condos site

 

Pit stops: Checking out excavation activity at Fashion House, Motion Apartments and U Condos

Fashion House condos on King Street West

March 29 2011: Excavation at the NE corner of the Fashion House site

 

Motion on Bay apartment tower

March 22 2011: Motion on Bay apartment tower excavation at Bay & Dundas Streets

 

U Condos condo tower excavation

April 1 2011: U Condos condo tower excavation at Bay and St Mary Streets

 

Digging deeper: Excavations for three new highrise residential buildings are moving steadily along in three different downtown areas.

The digs at Fashion House Condos on King Street West, Motion Apartments on Bay at Dundas, and U Condos on Bay near Yorkville, all are more than one underground level deep at parts of their respective construction sites. But while excavation activity is underway on almost the entire Motion on Bay site, digging is limited to certain perimeter points at Fashion House and U Condos. Pile driving and shoring activity continues at both of those sites, where roughly three-quarters of the ground on each property has yet to be broken.

Below is a series of recent photos showing excavation progress at each building site. To view building renderings and pictures I’ve published previously, see my January 24 post on Fashion House, my January 29 post for Motion on Bay, and my February 4 and March 18 posts on U Condos.

 

Fashion House condos on King Street West

March 29 2011: View from King Street of the Fashion House site

 

Fashion House condos on King Street West

March 29 2011: Activity at the northwest corner of the Fashion House site

 

Fashion House condos on King Street West

March 29 2011: Activity at the northwest corner of the Fashion House site

 

Fashion House condos on King Street West

March 29 2011: Excavation at the north side of the Fashion House site

 

Fashion House condos on King Street West

March 29 2011: Activity at the NE corner of the Fashion House site

 

Motion on Bay Apartments

February 15 2011: Northwest view of Motion on Bay excavation

 

Motion on Bay Apartments excavation progress

February 15 2011: The north half of the Motion on Bay construction site

 

Motion on Bay Apartments excavation progress

March 22 2011: Excavation activity at the SW corner of the Motion site

 

Motion on Bay Apartments excavation progress

March 22 2011: Shoring and excavation equipment at the Motion site

 

U Condos on Bay Street below Yorkville

April 1 2011: Digging away at the southwest corner of the U Condos site

 

U Condos on Bay Street below Yorkville

April 1 2011: Excavator digging at the NW corner of the U Condos site

 

U Condos on Bay Street below Yorkville

April 1 2011: The dig is more than one level deep at U Condos’ western perimeter

 

U Condos on Bay Street below Yorkville

April 1 2011: A closer view of the depth of the excavation at the northwest corner

 

U Condos on Bay Street below Yorkville

April 1 2011: Excavation depth along the property’s western perimeter

 

U Condos on Bay Street below Yorkville

April 1 2011: St Mary Street view of activity at the east end of the site

 

U Condos on Bay Street below Yorkville

April 1 2011: Preparing the Bay Street side of the site for excavation


Here’s the latest dirt on U Condos construction

U Condos construction site

March 16 2011: Huge mounds of earth at the U Condos construction site block parts of St. Basil’s Church from view along St. Mary Street. Construction crews are in the early stages of excavation work for the two-tower condo project.

 

Prepping the perimeter: Piles of earth keep growing bigger on the U Condos construction site, as crews continue to prepare the property’s perimeter for site excavation and foundation building. Below are photos I’ve taken during the past month of the vast condo construction site at the corner of Bay and St. Mary Streets near Yorkville. Additional photos and a description of the project are provided in my February 4 post about U Condos.

 

U Condos construction site

February 12 2011: The U Condos site after a light dusting of snow

 

U Condos construction site

February 15 2011: Pile drivers preparing the U Condos Bay Street perimeter

 

U Condos construction site

February 15 2011: St. Mary Street view of U Condos site

 

U Condos construction site

February 15 2011: Activity at the northeastern corner of the U Condos site

 

U Condos construction site

February 15 2011: Activity at the northeastern corner of the U Condos site

U Condos construction site

March 13 2011: Foundation building machines on the U Condos site

 

U Condos construction site

March 13 2011: Enormous mounds of earth in the middle of the property

 

U Condos construction site

March 13 2011: Foundation construction machines on the U Condos building site

 

U Condos construction site

March 13 2011: Machinery and equipment on the east side of the property

 

U Condos construction site

March 13 2011: Machinery and equipment on the east side of the property

 

U Condos construction site

March 13 2011: Mounds of earth keep piling up near St. Basil’s Church

 

U Condos construction site

March 13 2011: Pile driving equipment at the south end of the property

 U Condos construction site

March 16 2011: Equipment, machines and steel beams on the east side of the site

 

U Condos construction site

March 16 2011: The beams will strengthen the retaining walls for the excavation

 

U Condos construction site

March 16 2011: One of the excavating machines on the U Condos site. The tower at the rear right of the photo is the One Bedford condominium on Bloor Street.


Here’s looking at U, Condos

U Condos

U’s Turn: In just a few short years, things will really be looking up for the St. Michael’s College campus at the University of Toronto. Way up. From the old ivy-clad stone and brick bastions of academia to the shiny new glass and steel towers of luxury condo living 45 and 50 storeys up. That’s how high the two towers of U Condos, currently starting construction, will soar above the college campus from their perch at the southeast corner of Bay and St. Mary Streets near Yorkville. It’s going to be a huge and dramatic change for a wedge-shaped piece of property that previously contained an unremarkable asphalt parking lot and a wide field of green grass. For people who were lucky to buy in when the buildings initially went on sale, U Condos undoubtedly will prove to be an incredibly wise investment. I’m willing to bet a substantial number of buyers are real estate- and personal finance-savvy parents who scooped up suites so their kids will have accommodations when they attend U of T; after graduation day, mom and dad will sell the units at a tidy profit, perhaps even paying off the kids’ substantial university tuition bills and other education expenses in the process.  Contractors have been preparing the site for excavation since December; heavy machinery has been moving mounds of earth, while pile drivers have been punching away at several different places on the U Condos property.  Below is an architectural rendering of the U Condos podium, along with photos I’ve taken in the U Condos neighbourhood at various times since 2008.

U Condos

Architectural rendering of U Condos towers and podium


U Condos

Billboards along U Condos Bay Street location November 14 2008


U Condos

View towards Bay Street from west end of U Condos site November 1 2010


U Condos

U Condos site viewed from St. Mary Street on November 1 2010


U Condos

U Condos site viewed from Bay Street on November 11 2010


U Condos

Billboard on U Condos site November 11 2010


U Condos

View towards U Condos site from west end of St Mary Street on December 4 2010; in two years, the new towers will totally dominate this view towards Bay Street


U Condos

Idle excavation equipment on U Condos site December 4 2010


U Condos

Idle excavation equipment on U Condos site December 4 2010


U Condos

Idle excavation equipment on U Condos site December 4 2010


U Condos

Last glimpse of green: This lawn, seen December 4 2010, will soon be dug up


U Condos

All quiet on the U Condos site on Sunday January 9


U Condos

Snow-covered excavation machinery at the U Condos site January 9


U Condos

U Condos site under a blanket of snow on January 9


U Condos

Pile driving machinery on January 24 after a light snowfall


U Condos

Pile driving machinery on January 24


U Condos

U Condos billboards along Bay Street on January 29


U Condos

Early stages of excavation at U Condos on January 29


U Condos

Grass has been completely cleared from the western half of the site


U Condos

U Condos hoarding along St Mary Street January 29


U Condos

U Condos hoarding along St Mary Street January 29



New year, new construction milestones

2011 is getting off to a foggy, soggy start in Toronto (it’s 10 degrees Celsius and pouring rain as I write), but the wet weather won’t put a damper on the frenetic pace of building activity across the downtown area. When construction gets back to full speed next week once the holiday season has wound down, numerous projects will start, approach or reach significant stages of construction. At least five towers will make a major mark on the city skyline soon. In Yorkville, The Four Seasons Private Residences and Museum House on Bloor, both of which already have a substantial streetscape presence, will be pouring their top floors during the winter. Several blocks south, on Bay Street, the Burano condo tower is quickly climbing high, while the Living Shangri-La Torontoand Trump International Toronto hotel/condo skyscrapers are adding excitement to the Financial District skyline. Market Wharf is doing the same for the St. Lawrence Market neighbourhood. In the next few weeks, streetscapes in several different areas will transform as construction climbs above ground level at 77 Charles Westin Yorkville, The L Tower on Yonge Street, Charlie Condos in the Entertainment District, The Modern at Sherbourne and Richmond, and the Clear Spirit tower in the Distillery District. Not too far behind are Aura at College Park on Yonge Street, Cinema Tower on Adelaide Street West, Three Hundred Front Street West, The Residences of Pier 27 on the waterfront, ICE Condos and Infinity3 Condos in the South Financial District, and Couture Condos on Jarvis Street; foundation work and underground levels are progressing fast at all seven sites. In the area bounded by Bloor, Bay, Wellesley and Jarvis Streets, demolition and excavation work should soon get in full swing for five key developments: U Condos, Five Condos, Nicholas Residences, X2 Condos, and the long-awaited One Bloor tower. Digging will get underway in earnest for the Ryerson University Student Learning Centre at Yonge and Gould Streets, and for the Delta Toronto hotel and Bremner Tower office complex in the South Financial District. Meanwhile, construction should soon conclude at the Sherbourne Common park at the waterfront, as well as for the 18 York office tower and seven major residential structures: the Ritz-Carlton Toronto, Crystal Blu Condos, Uptown Residences, James Cooper Mansion, Lumiere Condos, M5V Condos, and the YWCA Elm Centre. I’ll be taking a closer look at each of the above-mentioned projects — and many more hot construction spots — in the weeks ahead.

77 Charles Street


18 York