April 17 2013: Construction of the X2 Condominium tower has climbed 5 floors on the way to 49, as seen in this view from the northwest on Charles Street. Click on the picture to view a larger-size image.

 

 

Eye catcher: When 2012 drew to a close, construction of the X2 Condos at the southwest corner of Jarvis & Charles Streets was just beginning to rise above the hoarding that blocked most of the site from the view of passing motorists and pedestrians. As New Year’s approached, a couple of support columns for the 49-storey tower’s ground floor were taking shape near the west end of the building site — the first signs of construction progress visible from street level.

With construction now up to five floors, passersby can’t help but notice the building — and get an early sense of the tremendous visual impact it will have in the Bloor-Jarvis neighbourhood once construction is complete.

I have walked past the X2 Condos site three times in the past two weeks, and on each occasion have noticed that the building is commanding considerable attention from people passing by both on foot and in vehicles. I saw pedestrians pause to watch the construction work, and noticed dozens of vehicle drivers and passengers checking out the site while waiting for traffic lights to change at the busy Jarvis-Charles-Mt Pleasant intersection.

CONTINUED ON PAGE 2

Winter building pics: March 2013

 My March 2013 album on Flickr features more than 500 photos showing dozens of downtown construction projects and building sites. Click once on the image above to view a small-format slideshow of the pictures, or click twice to access the actual album where you can view individual full-size photos with captions.

 

 

Frozen fingers: It’s only a few days into spring and I’m still sorting through hundreds of building and construction photos I took during the winter. What has struck me the most is how gloomy and grey the city looked most of the time. Sunny, clear days were few and far between — and when they came, it was usually too bitterly cold and windy for me to risk freezing my fingers by wandering around with my camera.

I did manage a few long photo walks, though, and have been gradually posting the pics in albums on thetorontoblog.com’s Flickr photostream.  Above is a link to my fourth winter photo album, March 2013.

 

 

CONTINUED ON PAGE 2

Winter building pics: February 2013

Above is a link to my February 2013 Flickr album of building and construction photos I shot during walks in the downtown area. Click once on the image to view a small-format slideshow of the pictures, or click twice to access the album directly on Flickr and see full-size photos and captions.

 

Winter building pics: January 2013

Above is a link to my January 2013 Flickr album of building and construction photos I shot during walks in the downtown area. Click once on the image to view a small-format slideshow of the pictures, or click twice to access the album directly on Flickr and see full-size photos and captions.

 

Winter building pics: December 2012

Above is a link to my December 2012 Flickr album of building and construction photos I shot during walks in the downtown area. Click once on the image to view a small-format slideshow of the pictures, or click twice to access the album and see full-size photos and captions.

 

Pit Stops: Photo roundup of below-ground and at-grade construction activity at 21 downtown condo, office & university building sites

Picasso on Richmond condos

As 2012 drew to a close, some noteworthy downtown building projects had reached different stages of at- and below-grade construction progress. At some sites, like this one for the Picasso on Richmond condo tower, preliminary foundation drilling work was in full swing …

 

Studio on Richmond condos

… while at others, like this one for the Studio on Richmond and Studio2 condo towers just two blocks east of Picasso, site excavation was ongoing.

 

The Yorkville condos

Over the same period of time, underground parking levels were taking shape at some building sites, like this one for The Yorkville condo project on Davenport Road …

 

X2 Condos

… while over on Charles Street East, construction had reached a milestone mark at X2 Condos, where building had started on the ground level of the tower

 

Fall photos: Until condo and office tower construction starts to climb above street level, it can be difficult to track how quickly work is progressing on the dozens of new buildings going up in Toronto’s downtown core. Ground-level views of building sites are often obscured by hoarding and security fences, plus concrete delivery trucks, dump trucks and other construction vehicles maneuvering into and out of staging areas adjacent to construction zones. I find it’s a big challenge to monitor ongoing progress at places where underground levels are taking shape, let alone keep an eye on sites where shovels are just breaking ground or preliminary work is being undertaken to prepare for full-scale construction. The vast number of projects scattered throughout the downtown core certainly doesn’t make the task any easier.

 

CONTINUED ON PAGE 2

Crane installation underway at X2 Condos site

X2 Condos crane installation

March 10 2012: Charles Street is blocked to traffic while a portable crane installs the fixed-position construction crane that will build X2 Condos

 

X2 Condos crane installation

March 10 2012: The crane is being installed in the northwest corner of the 5-level-deep excavation for the 49-storey condo tower

 

X2 Condos crane installation

March 10 2012: The blue lower half of the crane rises from the deep excavation only meters from the south side of Charles Street

 

Assembly day: Another construction crane is rising on the city skyline today, joining dozens of other cranes already working on major condo, office and other building projects throughout the downtown core. The new crane will soar skyward above Jarvis and Charles Streets, where it will help construct the  X2 Condos tower for developer Great Gulf Homes.

X2 Condos will be a 49-storey tower designed by Toronto’s Rudy Wallman Architects Inc. It will be a “sister” skyscraper to Great Gulf’s highly popular X Condos, a 44-storey tower which opened for occupancy in the summer of 2010 just a stone’s throw away on the north side of  Charles Street. (X Condos was designed by a different architectural firm, Peter Clewes and his team at architectsAlliance of Toronto.)

 

CONTINUED ON PAGE 2

Crews digging deep for X2 Condos foundation

X2 Condos excavation

January 1 2012: A New Year’s Day view of the deep excavation pit for X2 Condos, looking west from the sidewalk along Jarvis Street

<>

X2 Condos Toronto

 February 5 2011: An excavating machine sits idle in the muddy soil near the western end of the deep rectangular pit…

 

X2 Condos Toronto

… but in just four days it has dug several feet deeper …

 

X2 Condos Toronto

… and on February 11 gets some assistance moving a mound of earth

 

Crane coming soon?: Every time I walk past the X2 Condos building site — which lately has been about four times a week — I expect to see a construction crane rising from the deep excavation at the southwest corner of Jarvis and Charles Streets.

In early January, one of the construction crew told me that workers had to excavate just 20 more feet of soil, after which time a 6-foot-thick slab of concrete would be poured throughout the bottom of the pit to create the base for the 49-storey building foundation. Once the concrete had cured, the crane would be installed. That would take place sometime in January, the construction worker said.

 

CONTINUED ON PAGE 2

Snow day! Photos of some downtown construction sites after a light morning snowfall dusts Toronto

West Don Lands Community Toronto

The vast construction zone for the new West Don Lands Community is seen in this image taken by a Waterfront Toronto webcam this afternoon. The 80-acre site was blanketed with light snow this morning, less than 24 hours after Waterfront Toronto and Infrastructure Ontario announced that long-awaited construction is finally commencing on the new mixed-use residential community a short distance east of the downtown business district. The highrise under construction at upper left is the 40-storey Clear Spirit condo tower in the nearby Distillery District.

 

Aura at College Park Condos Toronto

Construction progress on the 75-storey Aura at College Park condo tower is seen in this image captured from a webcam on the Aura website.

 

Nicholas Residences condo construction Toronto

Excavation activity at the Nicholas Residences condo site near Yonge & Bloor

 

FIVE Condos site Toronto

Shoring work continues on the FIVE Condos site at Yonge & St Joseph Streets

 

FIVE Condos site Toronto

Snow-covered steel I-beams and construction equipment on the FIVE Condos site

 

ETFO office building Toronto

A worker directs traffic past the ETFO office building site on Isabella Street

 

ETFO office building Toronto

Another view of progress on the 4-storey ETFO office headquarters

 

X2 Condos Toronto

Overlooking the long, rectangular excavation for the 49-storey X2 Condos tower under construction at the southwest corner of Jarvis & Charles Streets

 

X2 Condos Toronto

Crews have nearly completed digging the deep excavaton for the X2 Condos tower. The construction crane is expected to be installed soon

 

45 Charles Street East Toronto

Interior demolition work continues on the eight-storey office building at 45 Charles Street East, future site of the Chaz.Yorkville condo tower.

 

45 Charles Street East Toronto

Despite the light snow cover, a drilling rig (rear right) was busy jackhammering a concrete pad at the northwest corner of the Chaz.Yorkville site

 

Burano Condos and Women's College Hospital Toronto

Two major construction projects at the southwest corner of Bay & Grosvenor Streets: Burano Condos, left, and the Women’s College Hospital redevelopment.

 

Womens College Hospital Toronto

The new Women’s College Hospital building has risen five floors so far on what was formerly the site of the hospital’s multi-level parking garage

 

Burano Condos on Bay Street Toronto

The soaring glass atrium on the north (Grosvenor Street) side of Burano Condos

 

Burano Condos Toronto

A view of the atrium from the north side of Grosvenor Street

 

Burano Condos Toronto

A publicly-accessible piazza, designed by landscape architects Janet Rosenberg + Associates, will be constructed next to the atrium

 

Burano Condos Toronto

The sharply angled glass panels of the atrium provide a striking contrast to the condo tower that soars 50 storeys straight up above it

 

Harbourfront Centre York Quay parking garage construction

A Harbourfront Centre webcam image of progress on the new underground parking garage for York Quay Centre. Concrete floor slabs have been poured for the 3 below-grade levels, and work will start soon on the ground-level roof over the structure. New outdoor public spaces will be created on top.

 

 

A tacky marketing tactic for X2 Condos

X Condo sculpture

A condo ad detracts from views of Shayne Dark’s bold red “Double Vision” sculpture outside X Condos


An affront to art?: I remember the first time I saw the Shayne Dark sculpture, “Double Vision,” outside the new X Condominium tower. The slender, long lipstick-red tubes rising from the sidewalk at the southeast corner of the tall coal-black condo tower caught my attention from more than two blocks away, so I hurried up Jarvis Street to take a closer look.

Because of its striking visual impact next to the building, Dark’s sculpture, which reminds me of bamboo shoots, instantly became one of my favourite pieces of public condominium art. But it didn’t take long before the eye-catching art unwittingly became a tacky marketing tool for X Condo’s sister project, X2 Condos. In next to no time, a garish black, white and hot pink billboard advertising the X2 condo sales centre was plunked in front of “Double Vision.”

Not only does the sign spoil views of the stunning sculpture, it also cheapens the artwork — which I’m certain cost the condo developer a pretty pile of cash. And speaking of cash, I’m willing to bet lawyers could make a good case demonstrating that the sign violates Dark’s moral rights … after all, remember what happened when the Eaton Centre tied Christmas bows on artist Michael Snow’s Canada geese sculpture, “Flight Stop?”

Memo to the clever marketing people at X2: Time to find a more appropriate place to park the sales office sign; perhaps on the south side of Charles Street, away from the sculpture. Please show some respect and class for the art, folks.

 

Shayne Dark Double Vision sculpture

For readers who haven’t seen it, here is a photo from last August showing “Double Vision” when it wasn’t obscured by advertising. A pink sandwich board sign for the X2 sales office looks much less obnoxious placed away from the artwork.


X2 Condo Shayne Dark sculpture

This is what you see now when you view “Double Vision” from the south


Shovels in the ground at X2 Condos site

X2 Condos

The earth is moving at the X2 Condos project site


X2 marks its spot: I felt a touch of nostalgia when I saw a drilling machine and backhoe cutting into the snow-covered ground at the corner of Jarvis and Charles Streets this afternoon.

Don’t know why, but I suddenly started thinking about the ugly three-storey office building that used to occupy the site. For the longest time it housed an overpriced Becker’s convenience store and a sports bar called Caps that served awesome — but wickedly hot — BBQ chicken wings, good burgers and reasonably-priced beer. Caps was popular with sports teams as well as the cops who worked across the street in a police building that ultimately met its demise when the hugely popular 44-storey X Condominium tower started construction several years ago.

Eventually, the Becker’s store and the bar closed down. The PizzaPizza company acquired the property, spruced up the building, and moved its headquarters inside. But the days of the PizzaPizza place were numbered. X Condos was a tremendous success; its units sold like gangbusters, leaving no doubt there was a strong demand for more condos in the immediate neighbourhood. It was obvious that the PizzaPizza property would be worth an absolute fortune as a condo tower development site. Inevitably, signs were posted on the property in 2008 to advise the neighbourhood that plans were afoot to build a 44-storey condo highrise there.

In November 2009, a sales office for X2 Condos was constructed on Charles Street on the site of two brick mansions that formerly housed law firms and other offices (properties that also would ultimately be demolished to make way for the condo highrise.) Demolition of all three buildings began last August, and throughout the autumn the lot sat empty while soil testing and other preliminary site preparation work was performed.

In the meantime, the city approved the developer’s request to add more floors to X2, bringing the tower’s total height to 49 storeys. Now, digging has begun in earnest on the northeast perimeter of the site.

Don’t know why, but suddenly I’m craving beer and chicken wings! Too bad I can’t walk up the street to Caps anymore.

Below is a rendering of the X2 Condo building (designed by Toronto’s Rudy Wallman Architects, by the way), along with photos I’ve taken of the X2 site over the past three years. More photos can be viewed in an album accessible from the Photo Sets page of the blog (where you’ll find another album with pictures showing the construction of X Condos, from site excavation to fully-finished and occupied tower.

Although X and X2 look a lot alike, as sisters usually do, X was designed by a different architect — Peter Clewes of Toronto’s architects Alliance.)

 

X2 Condos rendering

Artistic rendering of X2 Condo tower at the corner of Jarvis & Charles


X2 Condos

August 14 2008: Condo development proposal sign on X2 Condos site


X2 Condos

Sept 3 2008: View of the former PizzaPizza offices on the X2 site


X2 Condos

Sept 3 2008: Jarvis Street view of the former PizzaPizza headquarters


X2 Condos

December 3 2008:  Charles Street view of the development site


X2 Condos

November 2 2009:  PizzaPizza building being prepared for demolition


X2 Condos

November 2 2009: X2 Condos sales office sign on Charles Street East


X Condos

November 2 2009: X2 Condos sales office being constructed on the project site


X2 Condos

November 22 2009: X2 Condos marketing signs on the PizzaPizza building


X2 Condos

November 22 2009: X2 Condos marketing signs on the PizzaPizza building


X2 Condos

Bright pink signs on exterior of X2 Condos sales office


X2 Condos

August 29 2010: Demolition of the PizzaPizza building underway


X2 Condos

August 29 2010: Big empty lot behind the PizzaPizza building being demolished


X2 Condos

August 29 2010: X2 Condos sales office gradually being demolished


X2 Condos

August 29 2010: Charles Street view of demolition activity at the X2 Condos site


X2 Condos

August 29 2010: Jarvis Street view of the PizzaPizza building demolition


X2 Condos

August 29 2010: Jarvis Street view of the PizzaPizza building demolition


X2 Condos

X2 Condos sales office in its new location: a townhouse at X Condos


X2 Condos

October 3 2010: View of the lot where X2 will be built


X2 Condos

November 11 2010: Work crew tests soil conditions


X2 Condos

November 11 2010: Soil testing operations at the west end of the site


X2 Condos

December 18 2010: X2 Condos site after a light snowfall


X2 Condos

January 9 2011: A blanket of snow covers the X2 Condos site


X2 Condos

February 8 2011: Machines digging away at the perimeter of the property


X2 Condos

February 8 2011: Digging at the northeast perimeter of the X2 Condos site


X2 Condos

February 8 2011: Tag-team excavation activity on the  X2 Condos site