Category Archives: Entertainment District

Looking up at some of the new skyscrapers making their mark on the downtown Toronto skyline

RBC WaterPark Place

The new RBC WaterPark Place office tower practically blends into the clouds in this view from the west on lower York Street on September 16 2014

 

 

South Financial Core towers

while four new towers reach for the clouds above the south downtown core. At left are the Delta hotel and Bremner office tower at Southcore Financial Centre on Bremner Blvd. Soaring skyward at right are the two ÏCE Condos on York Street.

 

 

1 Bloor condos

The sensuous curves of the One Bloor condo tower are already adding interest and excitement to the once-drab Yonge & Bloor intersection in Yorkville.

 

 

Below are more photos of the towers shown above, as well as other hotel, office and condo skyscrapers that I photographed this past week.

 

 

RBC WaterPark Place office building

 

RBC WaterPark Place

West side of RBC WaterPark Place viewed from lower York Street

 

 

RBC WaterParkPlace

South face of RBC WaterParkPlace seen from Queen’s Quay Blvd. The tower was designed by WZMH Architects of Toronto.

 

 

RBC WaterParkPlace

Upper half of the 30-storey tower, viewed from the southwest

 

 

RBC WaterPark Place

Another view of the tower from Queen’s Quay to the southwest

 

 

Studio on Richmond condominiums

 

Studio on Richmond

Looking up the north side of the Studio on Richmond condo tower situated between Simcoe and Duncan Streets in the Entertainment District. It will top off at 31 storeys. Its 41-storey sister tower, Studio2, is currently under construction behind it on Nelson Street.

 

 

Studio on Richmond condo

Studio on Richmond podium and tower viewed from the north side of Richmond Street near Simcoe Street

 

 

Studio on Richmond condo

The two-tower Studio on Richmond condo complex was designed by Quadrangle Architects of Toronto.

 

 

Studio on Richmond condo

A view of the Studio on Richmond condo from the west on Richmond Street near Duncan Street. The building is a project of Aspen Ridge Homes.

 

 

 Delta Hotel and Bremner office tower at Southcore Financial Centre

 

Delta Hotel and Bremner office tower

The Delta Toronto hotel (left) and the Bremner office tower are nearing completion at Southcore Financial Centre on Bremner Boulevard between York Street and Simcoe Street. The buildings are seen here from Roundhouse Park, near the Toronto Railway Museum.

 

 

 

Delta Hotel and Bremner office tower

The 45-storey Delta Hotel tower reflects on the west wall of the 30-storey Bremner office tower in this view from the southwest corner of Lower Simcoe Street and Bremner Boulevard.

 

 

Delta Hotel

Looking up the northwest corner of the Delta Hotel. The Bremner office tower is partially visible behind it.

 

 

 

Delta Hotel

Upper west side of the Delta Hotel. Scheduled to open in 2015, the Delta will be a premium 4-star hotel with 567 guest rooms.

 

 

Delta Hotel

The angled south face of the Delta Hotel, seen from Bremner Boulevard

 

 

 

The L Tower condominium

 

The L Tower

Upper floors of The L Tower seen from the west on Sept 16 2014. The dramatically curved skyscraper was designed by architect Daniel Libeskind.

 

 

 

The L Tower

A closer view of some of the upper levels of the 58-storey L Tower, which is located at the corner of Yonge Street and The Esplanade, directly behind the Sony Centre for the Performing Arts.

 

 

The L Tower

The L Tower makes an emphatic point on the downtown skyline

 

 

The L Tower

A telephoto view of the construction crane that has soared above The L Tower construction site for the past several years

 

 

The Mercer condo tower

 

The Mercer condo

Looking up the southeast corner of The Mercer condo building, which rises 33 storeys at the corner of Mercer and John Streets in the Entertainment District

 

 

The Mercer condo

The Mercer was designed by BBB Architects, and is a project of Graywood Developments Ltd. and Beaveerhall Homes.

 

 

 

Three Hundred Front Street West condominiums

 

 

300 Front Street West condos

The upper floors of the 49-storey Three Hundred Front Street West condo tower

 

 

300 Front Street West condos

Looking up the southeast corner of Tridel’s Three Hundred Front West condo. The building was designed by Toronto’s Wallman Architects.

 

 

Theatre Park condominiums

 

Theatre Park condo

The 47-storey Theatre Park condo tower is under construction on King Street West, right next door to Toronto’s historic Royal Alexandra Theatre. I shot this photo of Theatre Park from two blocks to the northwest.

 

 

Theatre Park condo

Theatre Park was designed by architectsAlliance of Toronto. The condo is a project of Lamb Development Corp., Niche Development and Harhay Construction Management Ltd.

 

 

Theatre Park Condos

Glass balcony panels are gradually being installed on the tower’s north side

 

 

Theatre Park Condos

Design details on the tower’s west side

 

 

ÏCE Condominiums

 

ICE Condos

The upper west sides of the 67- and 57-storey ÏCE Condominiums, located at 12 and 14 York Street in the south downtown core

 

 

ICE Condos

The top of the 67-floor ÏCE Condo at 14 York Street. A project of Lanterra Developments, the two skyscrapers were designed by Toronto’s architectsAlliance.

 

 

 

ICE Condos

 ÏCE Condo towers viewed from the southeast on Queen’s Quay Blvd.

 

 

ICE Condos

A view of the two towers from Grand Trunk Crescent to their northwest

 

 

 

Aura condominium

 

Aura condo tower

I shot this pic of the 78-storey Aura condominium tower from the podium green roof at Toronto City Hall. Aura is the tallest condominium building in Canada.

 

 

 

Aura condos

The upper third of Aura, viewed from several blocks to the southwest

 

 

 

Aura condo tower

A view of Aura from two blocks to the west on Elizabeth Street

 

 

Aura condo tower

Aura viewed from the northwest corner of College Park. A Canderel development project, the tower was designed by Graziani & Corazza Architects Inc.

 

 

 

Aura condos

The top of Aura, viewed from the southwest

 

 

Aura Condos

The top of Aura, viewed from the north

 

 

Nicholas Residences condominiums

 

Nicholas Residences

A view of 35-storey Nicholas Residences from the north on Balmuto Street. The condo is a project of Urban Capital and Alit Developments.

 

 

Nicholas Residences

Looking up the tower’s northwest corner, from the intersection of St Mary and St Nicholas Streets. The building was designed by Toronto’s Core Architects Inc.

 

 

Nicholas Residences

Nicholas viewed from the southwest on St Nicholas Street.

 

 

Nicholas Residences

West side of Nicholas, viewed from St Mary Street near Bay Street

 

 

 

FIVE Condominiums

 

FIVE Condo tower

Looking toward the 48-storey FIVE Condos tower from two blocks to the southeast, at the corner of Yonge and Maitland Streets.  To its right is the Nicholas Residences condo tower, two blocks north.

 

 

 

FIVE Condo tower

FIVE Condos was designed by Toronto’s Hariri Pontarini Architects

 

 

FIVE Condo tower

Looking up the south side of FIVE Condos from Wellesley Street West

 

 

FIVE Condo tower

The tower has a wonky appearance when viewed from the south, thanks to the undulating pattern of balconies on the east and west sides.

 

 

FIVE Condos S

Construction of the tower’s mechanical penthouse is underway. FIVE Condos is a project of MOD Developments Inc., Graywood Developments Ltd., Tricon and Diamondcorp.

 

 

 

FIVE Condos

Windows on the east side of FIVE Condos on September 5

 

 

FIVE Condos

FIVE Condos viewed from the east on the morning of September 11

 

 

 

FIVE Condo tower

A view of FIVE from the south on St Luke Lane, next to the Toronto Central YMCA Centre (left).  This view will change drastically in several years when Lanterra Developments builds its 60-storey 11 Wellesley on the Park condo tower on the property partly visible on the left side of St Luke Lane (presently occupied by a row of trees and a condo presentation centre behind them).

 

 

 

Chaz.Yorkville condominiums

 

ChazYorkville condos

Chaz.Yorkville Condominiums, on Charles Street between Yonge and Church Streets, is a project of 45 Charles Ltd. and Edenshaw Homes Limited.

 

 

ChazYorkville condos

A signature design element of Chaz.Yorkville is the large rectangular box that juts from the tower’s south side. It’s the Chaz Club, a 2-storey private club for exclusive use of condo residents.

 

 

ChazYorkville condos

The tower was designed by Sol Wassermuhl of Page + Steele IBI Group Architects in Toronto. It will stand 47 storeys tall when complete.

 

 

Casa Condominium and ChazYorville Condos

Chaz.Yorkville is only a few weeks away from overtaking the height of its next-door neighbour, the 46-storey Casa Condominium tower, which was built in 2010.

 

 

One Bloor Condominiums

 

One Bloor Condos

Although construction has climbed only one-third of the way to its ultimate 75 storeys, the One Bloor condo tower is already making a huge architectural statement at the Yonge & Bloor crossroads in Yorkville. I shot this photo from the southwest corner of Yonge & Charles Streets.

 

 

One Bloor Condos

I often hear passersby comment favourably on the delightful sweeping curves of One Bloor’s podium and tower.

 

 

One Bloor Condos

Looking up at One Bloor from the southwest corner of the Yonge & Bloor intersection. The building was designed by Toronto’s Hariri Pontarini Architects.

 

 

One Bloor Condos

A view of One Bloor from the northwest, on Yonge Street just above Bloor

 

 

 

U Condos

 

U Condos

A view of the two U Condos towers from two blocks to the south on Bay Street, at Phipps Street. The construction crane at left is building the 32-storey 1Thousand Bay condo tower at the southwest corner of Bay and St Joseph Streets.

 

 

 U Condos

The west U Condos building has topped off at 45 storeys, while the east tower continues its climb toward 55 floors. U Condos is a project of Pemberton Group, and was designed by architectsAlliance of Toronto.

 

 

 

X2 Condominiums

 

X2 Condos

Construction crews are closing in the mechanical penthouse levels of the 49-storey X2 Condominiums at the southwest corner of Jarvis & Charles Streets

 

 

X2 Condos

X2 Condos viewed from one block to the southwest on Isabella Street. The tower is a project of Lifetime Developments and Great Gulf Homes.

 

 

X2 Condos

A September 3 view from the south of X2 Condos left, and the first X Condos, right, which was constructed in 2010. X2 was designed by Wallman Architects, while X Condos was designed by architectsAlliance.

 

 

King Charlotte condo’s ground level takes shape

King Charlotte condos

November 28 2013: Construction on the King Charlotte condo tower has climbed above the hoarding on Charlotte Street in the Entertainment District

 

 

Get stacking: The last time I passed by the King Charlotte condo tower construction site with a camera in hand was on a cold afternoon back in February. Work on the 32-storey tower was still in its early stages; in fact, the excavation for the building’s 13-meter-deep, 4-level underground parking garage was less than half complete.  The entire construction site was dusted with a light layer of fresh snow.

I saw the site a couple of times during the summer, while work on the parking garage was proceeding, but didn’t make to Charlotte Street with a camera until several days ago. This time I discovered that the building is now rising above ground, with construction well underway on the main floor, which will eventually house retail and commercial space.

Over the course of the next 8 months or so, it will be interesting to watch the construction progress and see how the Entertainment District’s newest point tower literally stacks up — Peter Clewes of architectsAlliance has designed the building as a vertical series of variously-sized boxes.

“The boxes stack upon each other, and not necessarily in a fashion that one might initially imagine,” Lamb Development Corp. president & CEO Brad J. Lamb notes in a project description on the King Charlotte condominium website.

“The retail box protrudes from the podium box, the tower box appears to teeter and overhang the podium box, and the oversized rooftop amenity box actually does overhang the tower box. It is all very playful, yet incredibly clean and crisp,” he writes.

 

King Charlotte condo rendering

The King Charlotte condominium tower was designed by Peter Clewes of architectsAlliance. This rendering appears on the King Charlotte project website.

 

 CONTINUED ON PAGE 2

Theatre Park condo rising higher above King St.

Theatre Park Condos

November 14 2013: The Theatre Park condo tower continues its upward climb next door to Toronto’s Royal Alexandra Theatre on King Street West

 

Over 30: The Theatre Park condo tower continues to make its mark on the Entertainment District skyline as construction continues to climb higher above King Street West.

The concrete shell for the tower, which will boast 47 residential floors when finished, is roughly two-thirds of the way up. Work was underway on the 30th and 31st floors when I passed by late last week, with a new level being poured about every three to four days. Window and cladding installation is nearly complete on floors 7, 8 and 9.

 

Theatre Park condo

An artistic rendering of the 47-storey Theatre Park condo tower, designed by Toronto’s architectsAlliance.

 

 

CONTINUED ON PAGE 2

Peter Street condo tower continues to climb as nearby Tableau Condos gradually gets its legs

Peter Street Condominiums construction progress

November 14 2013: Construction has reached the 12th floor of Peter Street Condominiums at the northeast corner of Adelaide and Peter Streets …

 

 

Tableau Condos construction progress

… while at the opposite end of the same block, the ground level of Tableau Condos continues to take shape at Peter & Richmond Streets. The two condo towers will bookend the 9-story office building that sits in the middle of the block at 111 Peter Street.

 

One block, two towers: The east side of Peter Street between Richmond and Adelaide Streets is changing dramatically as construction continues to progress on two new condominium towers that will also transform the Entertainment District skyline and streetscapes in the process.

At the southeast corner of Peter and Adelaide, work on the Peter Street Condominium tower has climbed above the 11th level, bringing the building nearly one-third of the way to its ultimate 40-storey floorcount.

Just a few meters north, at the corner of Peter and Richmond, construction is progressing on the ground level of Tableau Condos, a 36-storey tower that will stand atop a distinctive table-shaped podium supported by long, tall column “legs.”

Artistic illustrations of both buildings, along with construction progress photos shot this week, can be viewed on page 2 of this post.

 

CONTINUED ON PAGE 2

Theatre Park condo climbing higher on King Street

Theatre Park condos Toronto

August 19 2013: Nearly 1/3 of its way to 47 storeys, the Theatre Park condo tower already dwarfs Toronto’s historic Royal Alexandra Theatre

 

Stealing the show: When I last posted photos of the Theatre Park condos back in the spring (see my April 18 2013 post), construction was just beginning to overtake the height of neighbouring heritage buildings, including the Royal Alexandra Theatre.

Three-quarters of the way through summer, the tower has now grown to about one-third of its ultimate 47-storey height. And as it continues climbing higher, Theatre Park undoubtedly will keep stealing attention from the 106-year-old landmark next door.

A project of Lamb Development Corp, Niche Development and Harhay Construction Management Ltd., the Theatre Park condominium tower was designed by architectsAlliance.

The slender point tower still has some suites available for purchase — at prices starting from $489,900, according to the condo website.

Below are several more construction progress photos I shot recently. The Theatre Park Condos album on TheTorontoBlog’s Flickr page contains several dozen photos of construction activity since December 2012.

 

Theatre Park condos Toronto

August 19 2013: Tower podium viewed from the south side of King Street

 

 

Theatre Park condos

August 19 2013: Tower construction has climbed past the 16th level

 

 

Theatre Park condos Toronto

August 19 2013: The Theatre Park tower continues to rise higher above the 106-year-old Royal Alexandra Theatre

 

 

Theatre Park condos Toronto

August 19 2013: The 66-storey Living Shangri-la Toronto hotel and condo tower (right) looks on as Theatre Park continues its climb above the Entertainment District

 

 

 

Theatre Park condo tower construction begins to climb above heritage neighbours on King Street

Theatre Park condo

April 17 2013: With the concrete frame for its podium in place, construction of the Theatre Park condo tower is set to rise above the neighbouring heritage buildings on King Street West, including the Royal Alexandra Theatre at 260 King West, left, and the Nicholls Building at 220 King West, right

 

 

CONTINUED ON PAGE 2

Pit stop at The Mercer condo construction site

 The Mercer condo

April 3 2013: The excavation for The Mercer condo tower, as seen from Mercer Street at the southwest corner of the construction site. Below are several more excavation photos that I shot earlier this month.

 

 

 

CONTINUED ON PAGE 2

Winter building pics: February 2013

Above is a link to my February 2013 Flickr album of building and construction photos I shot during walks in the downtown area. Click once on the image to view a small-format slideshow of the pictures, or click twice to access the album directly on Flickr and see full-size photos and captions.

 

$1.95 million penthouse still up for grabs as construction winds down at Charlie Condos

Charlie Condos

January 10 2013: Charlie Condos (second tower from left) stands proudly on the Entertainment District skyline. Its nearby highrise condo neighbours include M5V Condos (with the bold red mechanical room box on its west side), Cinema Tower (with the construction crane) and Festival Tower (right).

 

Charlie Condos

February 9 201: Looking up at the 36-storey Charlie tower from King Street

 

 

Final few with a superb view: Looking for a brand-new condo with plenty of space and spectacular views — plus an immediate closing? If you’ve got $1 million or more to spend, a spacious upper-level suite at Charlie Condos could be yours today.

Four years ago, a parking lot occupied the northwest corner of King & Charlotte Streets in the Entertainment District. Today, Charlie towers 36 storeys on the site, with owners of its 314 suites gradually taking occupancy of their units as construction draws to a close.

But anyone who missed out on purchasing a suite either before or during construction still has an “exceptional opportunity” to buy a signature suite on one of Charlie’s top floors.

 

 

CONTINUED ON PAGE 2

Pit Stops: Photo roundup of below-ground and at-grade construction activity at 21 downtown condo, office & university building sites

Picasso on Richmond condos

As 2012 drew to a close, some noteworthy downtown building projects had reached different stages of at- and below-grade construction progress. At some sites, like this one for the Picasso on Richmond condo tower, preliminary foundation drilling work was in full swing …

 

Studio on Richmond condos

… while at others, like this one for the Studio on Richmond and Studio2 condo towers just two blocks east of Picasso, site excavation was ongoing.

 

The Yorkville condos

Over the same period of time, underground parking levels were taking shape at some building sites, like this one for The Yorkville condo project on Davenport Road …

 

X2 Condos

… while over on Charles Street East, construction had reached a milestone mark at X2 Condos, where building had started on the ground level of the tower

 

Fall photos: Until condo and office tower construction starts to climb above street level, it can be difficult to track how quickly work is progressing on the dozens of new buildings going up in Toronto’s downtown core. Ground-level views of building sites are often obscured by hoarding and security fences, plus concrete delivery trucks, dump trucks and other construction vehicles maneuvering into and out of staging areas adjacent to construction zones. I find it’s a big challenge to monitor ongoing progress at places where underground levels are taking shape, let alone keep an eye on sites where shovels are just breaking ground or preliminary work is being undertaken to prepare for full-scale construction. The vast number of projects scattered throughout the downtown core certainly doesn’t make the task any easier.

 

CONTINUED ON PAGE 2

Wrecking crews clearing sites for Casa 2, King+ and King Charlotte condo tower construction

42 Charles Street East

October 25 2012: Demolition crews are busy dismantling the 9-storey building at 42 Charles Street East that formerly housed offices for the Toronto YMCA…

 

39 Hayden Street

… as well as this 3-storey brick law office building right behind it, at 39 Hayden Street, to clear the site for the 56-storey Casa 2 Condominium tower

 

King Charlotte condo site

October 20 2012: Piles of rubble and metal are all that remain of the 3-storey warehouse building that once stood at 11 Charlotte Street …

 

11 Charlotte Street

… seen here on March 29 2011. It has been demolished to make way for the 32-storey King Charlotte condo tower. Click on the photo to view a larger image.

 

King+ Condos site

October 4 2012: Low-rise buildings that once stood at 37 Sherbourne Street have been razed to make room for the 17-storey King+ Condos

 

King+ Condos site

… which will incorporate into the new tower part of the facade of the historic National Hotel building at 251 King East, constructed in 1868

 

 

Getting wrecked: Demolition and other site preparation work is clearing the way for construction to commence on three condo tower projects in three different downtown neighbourhoods.

Two office buildings are being knocked down and ripped apart near Yonge & Bloor to make room for the 56-storey Casa 2 Condominium that will take their place. The 9-storey brick building at 42 Charles Street East formerly housed offices of the Toronto YMCA, while the 3-storey brick building to its north, at 39 Hayden Street, had previously been home to a law firm. (For more information on the Casa 2 project, see my September 17 2012 post.)

 

CONTINUED ON PAGE 2

Shoring work for The Mercer adds to daily din of Entertainment District condo construction

The Mercer condo

October 1 2012: A construction worker walks past foundation drilling machines on The Mercer condo tower site. Click on the photo to view a larger image.

 

The Mercer condo

October 1 2012: Tall shoring machines on The Mercer condominium tower site. This view is from John Street, looking west. Click on the photo to view a larger-size image.

 

The Mercer condo

A John Street view of the full corner site, looking northwest …

 

The Mercer condo

… a Mercer Street view of the shoring work, also looking northwest …

 

The Mercer condo

… and another Mercer street view, this time looking northeast

 

CN Tower view of The Mercer condo location

September 25 2012: The white circle indicates the The Mercer’s approximate location in this CN Tower view of the Entertainment District. Six more condo towers have been proposed just for the one block area to The Mercer’s west, while double that number are either already under construction or have been proposed for its immediate vicinity.

 

 

Shoring the site: The area is formally known as the Entertainment District, but as intensification of the bustling west downtown neighbourhood continues its breakneck pace, Torontonians might soon start calling it the Condominium Construction District. It seems residents and tourists can’t stroll more than a block without encountering drilling, dust, dump trucks and the constant cacophony of construction work — or development proposal signs heralding more highrises still to come.

The Mercer, a 33-storey tower set to rise on the northwest corner of John and Mercer Streets, is the latest condominium project adding to the incessant daytime din of building activity that permeates the neighbourhood.

 

CONTINUED ON PAGE 2

Former Alice Fazooli restaurant razed to make way for construction of The Bond condo tower

294 Adelaide Street West

October 4 2012: Hoarding protects the sidewalk alongside the former Entertainment District location of an Alice Fazooli’s restaurant at 294 Adelaide Street West …

 

Alice Fazooli's Italian Grill

… seen here on February 17 2011 before part of the restaurant building was converted into a presentation centre for The Bond Condominiums tower, which will be built on the site

 

Alice Fazooli restaurant building demolition

 October 1 2012: Demolition of the one-time restaurant building as seen from a parking lot next to the northwest side of the site …

 

Alice Fazooli restaurant building

… and through one of the building`s front windows, before the installation of protective hoarding blocked views of demolition work from the street

 

 The Bond Condominiums

This building illustration appears on The Bond Condominiums website. Click on the image to view the rendering in a larger format.

 

The Bond Condominiums

This illustration, also from the project website, depicts a street-level view of The Bond’s podium. The building was designed by Toronto’s Core Architects Inc. Click on the illustration to view a larger-size image.

 

Adieu, Alice: I still recall fun times with family and friends at the former Alice Fazooli’s restaurant in the Entertainment District nearly a decade ago, so I wasn`t surprised to feel a tad nostalgic when I saw the building being smashed to smithereens this week, clearing the space for construction of a yet another condominium tower.

The once-popular restaurant site at 294 Adelaide Street West is being razed as preliminary construction work kicks off for The Bond Condominiums, a 40-storey condo tower that will take its place. Designed by Toronto’s Core Architects, The Bond is a project of Lifetime Developments. It will have 369 condos in studio plus  1-, 2- and 3-bedroom configurations, along with a collection of penthouse suites, an outdoor private terrace, and extensive indoor amenity spaces.

 

 

CONTINUED ON PAGE 2

Theatre Park condo foundation filling in fast

Theatre Park condo

August 25 2012: Looking toward the north end of the Theatre Park condo construction site, where underground levels are fast taking shape

 

Theatre Park condo

August 25 2012: A view of construction progress on underground levels near the midsection of the Theatre Park site. The condo property extends from King Street on the south to Pearl Street on the north.

 

Theatre Park condo

 August 25 2012: Work has progressed the farthest at the King Street (south) end of the site, where only one more underground level remains to be built

 

Inching upwards: Construction drama should start moving above grade at the Theatre Park condo tower site this fall.

The underground levels for the 47-storey tower have been filling in fast this summer. Work on the southern third of the site — next to the Royal Alexandra Theatre on King Street — has progressed the farthest, and only one more underground level remains to be constructed before that part of the building reaches street level.  The northern two-thirds of the site has some catching up to do, but isn’t far behind.

 

CONTINUED ON PAGE 2

Cinema Tower adds angles, curves & colour to city skyline as condo construction climbs higher

Cinema Tower Toronto

July 27 2012: Looking up the SW corner of Cinema Tower from Widmer Street

 

Cinema Tower Toronto

July 27 2012: Cinema Tower viewed from he northwest on Adelaide Street

 

Curves & colour:  The last time I walked around the Cinema Tower construction site in late March,  the highrise condominium component of the 43-storey tower had climbed about 5 floors above its sizable 6-storey podium. Although the striking curves and angles of the condo floors were already obvious at that point, I still wasn’t sure what to make of the tower’s design, since the building was basically just a massive concrete frame.

It was a completely different story when I finally got back down to take a fresh look on Friday. The tower has since climbed three-quarters of the way to its ultimate height, and I was pleasantly surprised to see how the building’s interesting angles, curves and colours make Cinema Tower stand out on the Entertainment District skyline. It’s turning out to be a much better-looking building than I had expected, based on the artistic illustrations I had seen on the Cinema Tower website and on hoarding around the construction site.

 

CONTINUED ON PAGE 2