Category Archives: Neighbourhood Watch: What’s happening in specific city districts

Condos and cranes on the lower east side

Downtown Toronto construction projects

Rising in the east: Construction cranes and condo towers old & new dominate the southeast downtown skyline, seen here from the south building of the Metro Toronto Convention Centre on January 6 2012.  From left are: the green-windowed west tower of London on the Esplanade Condos, completed in 2010; The L Tower, a Daniel Libeskind-designed condo more than one-third of the way to its ultimate height of 57 floors; the 33-storey wedge-shaped condo tower at 25 The Esplanade, constructed 14 years ago; the 25-storey Market Wharf condo tower rising on Lower Jarvis Street; and, climbing skyward in the distance behind Market Wharf, the 40-storey Clear Spirit condo tower in the Distillery District. The yellow crane in the foreground is working on the $640 million Union Station Revitalization project.

 

 

Dream still alive for green space or new park on boarded-up block of Wellesley Street West

11 Wellesley Street West Toronto

January 25 2012: The Ontario Government is examining its options to make a prime piece of real estate on Wellesley Street West available for new city green space. The vacant property has been surrounded by navy blue hoarding for years.

 

More parks for downtown?: City planners and politicians alike have admitted that the central downtown area, and particularly the district between College and Bloor Streets, is woefully deficient in public parks and green space. But at least one new park — and possibly several more — could be in the cards for the city core, according to an Ontario Cabinet minister.

Glen Murray, the MPP for Toronto Centre and Minister of Training, Colleges and Universities, says the province is examining its options for making a vacant parcel of property on Wellesley Street West available to the city for redevelopment into green space or a park of some kind. Other provincially-owned lands in the downtown core also might become available for additional parkland, Mr. Murray told the first annual general meeting of the Church Wellesley Neighbourhood Association (CWNA) last night.

 

 

CONTINUED ON PAGE 2

More development planned for Church-Isabella site where controversial highrise addition will be built

66 Isabella Street Toronto

January 21 2012: These trees and the snow-covered lawn will soon disappear given that the City has approved a 23-storey addition to the 66 Isabella Street apartment building at left. The City is now being asked to approve construction of a 3-storey walk-up apartment building just a few feet north of the trees — on the site of the 1-storey podium that sits at the base of the Town Inn Suites (right).

 

620 Church Street Toronto development proposal sign

January 21 2012: This development proposal notice has been posted outside the Town Inn Suites podium next to Church Street

 

Town Inn Suites apartment building addition site plan

This site plan illustration shows how the proposed apartment building structures will wrap around the east, south and west sides of the Town Inn Suites property

 

Town Inn Suites apartment building proposed site

January 21 2012: These trees on the west side of the Town Inn Suites,  seen here looking south from Charles Street, will have to be destroyed to permit construction of one of the proposed walk-up apartment buildings

 

New infill trend?:  I’ve heard some downtown Toronto residents joke that surface parking lots should be declared an endangered species before they all get redeveloped into highrise condominium complexes. But parking lots aren’t the only pieces of prime real estate beginning to disappear from downtown streetscapes. Spacious private lawns and gardens surrounding  apartment towers built 30 to 50 years ago are also now being targetted by developers for lucrative apartment and condo infill construction projects.

On October 24 2011, Toronto City Council approved a developer’s proposal to build a 43-storey rental tower at Isabella and Sherbourne Streets, on the site of a 3-tower apartment and retail complex constructed on the western edge of the St James Town neighbourhood in the late 1970s. As I reported in an October 3 2011 post, the new tower will rise from the location of what is currently a No Frills grocery store as part of a major building overhaul that will redevelop the retail podium for the rental towers, as well as add townhouses to the east side of the complex along Bleecker Street. (The developer has not yet announced when construction will commence.)

Similar redevelopment plans are in the works just a few blocks west along Isabella, at the northwest corner of Church Street. On January 10 of this year, Toronto and East York Community Council (TEYCC) approved a developer’s proposal to construct a 23-storey addition to a 40-year-old apartment building at 66 Isabella Street. The proposal will be considered by Toronto City Council on February 6; however, Councillors are expected to rubber-stamp the plan now that it has already been given the nod by TEYCC.

 

Developments increase city’s supply of rental housing

In a December 13 2011 report, city planners had recommended that the addition to the east side of the existing 26-floor highrise be approved because it was an “appropriate … mixed-use development on an underutilized site and adds to the supply of purpose-built rental housing.” Many neighbourhood residents, on the other hand, were upset that the redevelopment would eliminate a stand of mature shade trees as well as a large private lawn — a treasured green space in an urban neighbourhood that City politicians and planners admit is sorely lacking in public parks. As I reported in a January 5 2012 post, many residents of 66 Isabella were angry not only because that they would lose their popular yard, but also since dozens of their neighbour tenants would be displaced during construction of the highrise addition.  Two Saturdays ago, they protested the development plan by organizing a “lawn occupation” that drew several dozen participants and attracted wide media attention (a photo and report on the event was published in the online edition of the Toronto Star on January 7).

Now, the bealeaguered residents and neighbours of 66 Isabella have yet another infill development proposal to deal with — right next door. In an application filed with the City on December 22 2011, a developer is seeking approval to build two 3-storey walk-up apartment buildings on green space surrounding the Town Inn Suites, a 26-storey hotel tower that is literally a twin to 66 Isabella, and stands only several dozen metres to its northeast. One of the rental buildings would wrap around the southeast corner of the hotel’s one-storey podium, which presently houses a swimming pool and outdoor sundeck. The second rental building would be constructed on the west side of the Town Inn Suites, currently the location of a tree-shaded side yard as well as the entrance/exit ramp to the hotel’s underground parking garage. The two apartment buildings would contain a total of 43 units.

 

Downtown residents fear loss of greenery

During conversations with a number of neighbourhood residents in recent days, people have told me they fear that the infill projects at Church & Isabella, along with the redevelopment proposal for Isabella & Sherbourne, could have a domino effect, encouraging more apartment building owners to seek to replace ground space on their properties with low- and high-rise additions. Lush gardens and tree-shaded lawns that presently beautify dozens of downtown rental buildings would be at risk if more property owners sense the potential for increased rental income and profits, and jump on the redevelopment bandwagon. “In just a few years, it might be rare to see trees and gardens downtown,” one worried neighbour told me. ” We could lose most of our greenery to look-a-like glass towers and building additions that extend right to the edge of the property line,” she said ruefully.

Below is a series of photos I shot this afternoon, showing the Town Inn Suites property that is proposed for redevelopment into low-rise apartments.

 

66 Isabella Street Toronto

This private yard at the northwest corner of Church & Isabella Streets will disappear when construction starts on a 23-storey addition to the building at left

 

Town Inn Suites at 620 Church Street Toronto

Looking toward the Town Inn Suites from the northwest corner of Church & Isabella Streets. The yard space and the 1-storey podium for the hotel are both slated for redevelopment into separate apartment housing projects.

 

Town Inn Suites Toronto

Looking from the east side of Church Street toward the hotel podium that would be redeveloped into a 3-storey walk-up apartment building

 

Town Inn Suites Toronto

The 46-storey Casa condominium tower soars skyward just half a block west of the proposed apartment development site, in this view from Church Street. Another condo skyscraper, Chaz.Yorkville, is currently under construction right next door to Casa, and will block much of this view of Casa once it is built. The City approved 39 storeys for Chaz.Yorkville; however, its developer subsequently sought zoning changes that would permit it to build 47 floors. It has since appealed to the Ontario Municipal Board because the city didn’t reach a decision on its request within the timeframe prescribed by provincial planning law.

 

Town Inn Suites Toronto

The 1-storey podium is a hotel amenity space that includes a swimming pool as well as outdoor terraces and sundecks

 

Town Inn Suites Toronto

A street-level view of the podium, from its southeast corner

 

Town Inn Suites Toronto

A development proposal sign on the east side of the hotel podium

 

Town Inn Suites Toronto

A view of the podium, looking southwest along the Church Street sidewalk. The apartment building at 66 Isabella Street rises in the background.

 

Town Inn Suites 620 Church Street Toronto

The Town Inn Suites main entrance at 620 Church Street. The hotel, which has 200 suites, will remain as part of the proposed new development.

 

Town Inn Suites Toronto

The north side of the Town Inn Suites, looking west from the corner of Church and Charles Streets. Repairs to the building exterior are underway.

 

Town Inn Suites Toronto

A development proposal sign at the southwest corner of Church & Charles

 

Town Inn Suites Toronto

The north side of the Town Inn Suites along Charles Street. A city planner last summer said that the developer initially had been planning to build a row of townhouses along this side of the property. Now, two apartment buildings are being proposed on the south and west sides of the hotel instead.

 

Town Inn Suites Toronto

This yard on the west side of the hotel is the proposed site for one of the new apartment buildings. That’s 66 Isabella  in the background.

 

Town Inn Suites Toronto

A view of the “back” of Town Inn Suites from Charles Street  to the northwest

 

Town Inn Suites Toronto

This ramp leads from Charles Street into the hotel’s underground parking garage. The ramp would be relocated and accessed from the laneway to the right once the new low-rise apartment building is constructed.

 

Town Inn Suites Toronto

The underground garage has parking for 163 vehicles

 

Town Inn Suites Toronto

The addition to 66 Isabella will block this view of the sky from Charles Street, while the proposed 3-storey apartment building will dominate the foreground

 

 

TEYCC being asked to call public meeting to review proposal for 2 condo towers at Dundas & Jarvis

200 Dundas East Toronto

January 6 2012: A developer wants to build two condo towers on the northeast corner of Dundas & Jarvis Streets, currently the site of a Hilton Garden Inn …

 

200 Dundas Street East Toronto

… but Toronto and East York Community Council will decide, this coming Tuesday, whether to schedule a community consultation meeting first

<>

200 Dundas East Toronto proposed towers

This illustration in a city planning department report shows the south elevation for the proposed 48- and 35-storey condo towers

<>

Public input: City planning staff aren’t comfortable with a developer’s plan for a 2-tower condo development at the northeast corner of Dundas & Jarvis Streets, so they have recommended that Toronto and East York Community Council (TEYCC) order a public meeting to get Toronto residents’ input into the proposal.

A numbered company, 1293446 Ontario Inc., owns a 3,223-square-meter property currently occupied by the 9-storey Hilton Garden Inn Toronto City Centre at 200 Dundas Street East. It wants to redevelop the site into a new mixed-use residential complex featuring two towers — 48 and 35 storeys, respectively — that would rise above a podium ranging from 2 to 10 floors in height. (The unsightly hotel building was originally built as an office complex sometime around the 1950s. Once home to a number of federal government offices, the drab building looked even uglier until it was renovated and repurposed as a hotel about a decade ago. A Comfort Suites hotel operated there until recently, when the Hilton chain acquired the property.)

The proposed condo complex would contain 693 residential units (condos as well as “purpose built student rental housing” for students at nearby Ryerson University), office space, street-level retail, underground parking for 352 vehicles, and 701 bicycle parking spaces. 450 of the residential units — 65% of the total — would be 1 bedroom, 35 would be bachelors, 139 would be 2 bedroom, while 69 would be configured as 3 or more bedrooms. The 48-storey skyscraper would soar 151.85 meters high — approximately the same height as the 250 Yonge Street office tower at the Toronto Eaton Centre six blocks west. City planning reports indicate the project’s architect of record is Page + Steele/IBI Group Architects of Toronto.

 

Proposal’s “current form” not acceptable to city planners

The developer met with city planning staff in May and October 2011 to discuss its proposal; however, on both occasions the planners said they couldn’t support the developer’s rezoning application “in its current form.”

“Staff indicated concern with the overall height of the project, the relationship with and transition to the adjacent Neighbourhoods Area, and the type of units being proposed for the student residence component,” the planners explain in a November 10 2011 preliminary report to TEYCC.

The planners add that the proposal raises at least a dozen different planning issues, including “built form concerns” about the “height and density of the proposal, the built form transition from this site into all surrounding neighbourhoods, shadow impacts on surrounding properties, open space, the public realm, and massing issues including, but not limited to: setbacks, stepbacks, views, sky view, light penetration, prvacy, wind mitigation and pedestrian realm weather protection.”

City planners have recommended that a community consultation be held for the project in February, and say they are aiming to complete their final report on the proposal later this year. The planners’ request for directions to hold a community consultation is on the agenda for the January 10 meeting of TEYCC.

 

Developers & buyers see positive side of gritty neighbourhood

The site for the proposed towers sits on the edge of a low-income and high-crime area of east downtown, a gritty neighbourhood that has been home for decades to dozens of boarding houses, homeless shelters, soup kitchens and facilities offering social services for the down-and-out and poor. Nevertheless, the Dundas-Jarvis area has recently commanded considerable attention from the condo development industry and prospective purchasers alike, who believe the rough-and-tumble area offers tremendous investment potential. The neighbourhood’s walking-distance proximity to downtown offices, educational institutions, shopping and entertainment is particularly appealing to condo buyers.

Last year, developer Great Gulf Homes made headlines when it announced plans to build the 42-storey Pace Condos tower at the southwest corner of Dundas & Jarvis, formerly the site of a small low-rise retail plaza. Buyers descended in droves, and already more than 10 of the tower’s 27 different condo suite floorplans have sold out. Construction of Pace Condos could start as early as spring. Meanwhile, word on the street is that one or possibly even two condo towers could be in the works for what is now a large surface parking lot on the northwest corner of Dundas & Jarvis. The lot sits next to the 222 Jarvis office building that once was headquarters for Sears Canada, but is presently undergoing a multimillion-dollar “green building retrofit” and conversion into offices for the Ontario government. It’s widely expected that the parking lot segment of the property eventually will be severed from the office building section and sold off for redevelopment.

 

Condo & hotel development expected nearby

Area residents say they suspect highrises are in the cards for the southeast corner of Dundas & Jarvis, too — currently a block of low-rise retail shops, including a Ho-Lee-Chow Chinese takeout restaurant. And on Shuter Street just one block south, two additional development projects could help spur more neighbourhood improvement. In August 2010, Toronto City Council approved zoning amendments that would permit construction of a 20-storey, 260-room hotel at 203 Jarvis, presently a surface parking lot at the northeast corner of Jarvis & Shuter Streets. However, construction has not commenced, and there has been no indication when work will begin. The property is owned by Manga Hotels (Downtown) Inc. Manga Hotels is a Mississauga, Ont.-based private company involved with “the acquisition, development and management of high quality hotels affiliated with prestigious brands such as Marriott, Hilton, InterContinental Hotel Group and Starwood Hotels.” The “new developments” page of its website shows that a Homewood Suites by Hilton is planned for 203 Jarvis. The webpage says the all-suites hotel,  designed by Page + Steele/IBI Group Architects, “will be a major addition to the downtown Toronto core.” Clearly, the new Homewood Suites is slated to replace the Hilton Garden Inn up the street. Meanwhile, marketing and sales are in full swing for a 14-storey condo building, O2 Maisonettes on George, that will be constructed on the empty lot right next door at 102 Shuter Street — formerly the location of the Walnut Hall heritage building that was demolished after collapsing in May 2007.

 

Toronto East Downtown Planning Review underway

Developer interest in other nearby properties led to a July 6 2010 City Council decision calling on city planning staff to conduct a “full local area review” to determine “the possibility of permitting higher density residential development” in the Dundas-Jarvis area. The “Toronto East Downtown Planning Review” initially required planners to study Dundas Street East between George and Sherbourne Streets, as well as Sherbourne between Dundas and Shuter Streets; however, City Council decided on November 29 2011 to expand the study boundaries to encompass the wider district bounded by Jarvis, Carlton, Sherbourne and Queen Streets. City planners anticipate that they will be able to file a final report and “recommendations for the implementation of a revitalization strategy for the study area” sometime in the last quarter of this year.

A brighter future appears to be in store for east downtown; whether that includes a cluster of condo towers at Dundas & Jarvis plus a new hotel and condo at Jarvis & Shuter should become clear within the next year or two.

Below are more photos of 200 Dundas and its immediate vicinity, including the Homewood Suites and O2 Maisonettes development sites, along with illustrations and renderings of the various projects that appear in city planning documents and on project websites.

 

200 Dundas Street East Toronto

January 6 2012: The upper west (Jarvis Street) side of the Hilton Garden Inn Toronto City Centre at 200 Dundas Street East

 

200 Dundas Street East Toronto

January 6 2012: The Jarvis Street entrance to the Hilton Garden Inn

 

200 Dundas Street East Toronto

January 6 2012: The hotel viewed from the southeast corner of Dundas and George Streets. Chain restaurants and retail stores occupy the ground floor along Dundas.

 

200 Dundas Street East Toronto

January 6 2012: Toronto’s largest downtown mall, the Toronto Eaton Centre, is only a 10-minute walk away. The 250 Yonge Street office tower at the Eaton Centre is the tall building visible at rear left.

 

200 Dundas Street East Toronto

January 6 2012: The rear of the Hilton Garden Inn, viewed from George Street

 

200 Dundas Street East Toronto

January 6 2012: The upper east side of the Hilton Garden Inn

 

Filmores Hotel 212 Dundas Street East Toronto

January 12 2012: The infamous Filmores Hotel and its notorious “Gentlemen’s Club” is the Hilton Garden Inn’s neighbour to the east at 212 Dundas

 

Dundas Street East at George Street

 January 6 2012: Looking east along Dundas from George Street

 

200 Dundas Street East Toronto

January 6 2012: This laneway on the north side of the hotel runs between Jarvis and George Streets. At left is the 10-storey Jarvis-George Co-Op.

 

200 Dundas Street East site plan illustration

 This 200 Dundas Street East site plan illustration appears in the city planning department’s November 10 2011 preliminary report on the condo tower proposal

 

200 Dundas Street East Toronto illustration

This illustration from the November 10 2011 planning report shows the various stepbacks proposed for the 48-storey west tower

 

200 Dundas Street East Toronto illustration

 This illustration, also from the city planners’ preliminary report, shows the various setbacks proposed for the 35-storey east tower

 

SE corner of Dundas and Jarvis Streets Toronto

January 6 2012: Area residents expect the strip of low-rise retail buildings on the southeast corner of Dundas and Jarvis will be redeveloped with condo towers

 

Northwest corner of Dundas and Jarvis Streets Toronto

January 6 2012: The northwest corner of Dundas and Jarvis. The building at left is the Merchandise Lofts condo at 155 Dalhousie Street. At right is the Brutalist-style Ontario government office building at 222 Jarvis. A large parking lot behind the hoarding along the sidewalks may be sold for redevelopment as condo towers.

 

222 Jarvis Street Toronto

February 3 2011:Designed by Maxwell Miller as head office for Sears Canada, 222 Jarvis Street is undergoing a major “green” retrofit as it is renovated into offices for the Ontario government. The 9-storey building was constructed in 1971. WZMH Architects of Toronto designed the new Ontario Public Service workplace.

 

222 Jarvis Street Toronto

March 22 2011: A sign on hoarding lining the sidewalks around 222 Jarvis Street. Renovation and retrofitting of the 455,000 square foot edifice commenced in late 2009 and is expected to conclude sometime this fall. Government workers could begin moving into the building as early as December.

 

222 Jarvis Street Toronto

March 22 2011: Looking north from Dundas Street. This view could someday be dominated by condo towers if the parking lot in front of 222 Jarvis (blocked from view by the hoarding and construction trailers) is sold for redevelopment.

 

222 Jarvis Street Toronto

March 22 2011: Southwest view of 222 Jarvis from Mutual & Dundas Streets. Some neighbourhood residents call the building “the upside-down wedding cake” in reference to its distinctive inverted-pyramid shape.

 

southwest corner of Dundas and Jarvis Streets

January 6 2012: The southwest corner of Dundas and Jarvis Streets, looking west

 

southwest corner of Dundas and Jarvis Streets

January 6 2012: A small retail plaza once occupied this site, which has a municipal address of 155 Dundas East. The dingy, low-rise buildings were demolished last summer, as I reported in my July 1 2011 post.

 

southwest corner of Dundas and Jarvis Streets

January 6 2012: Looking to the northwest, from Jarvis Street, across the vacant 155 Dundas East property where Pace Condos will be constructed

<>

Pace Condos Toronto

Great Gulf Homes initially proposed a 46-storey condo tower for this site, as I reported in a March 22 2011 post. On November 29 2011, the City approved a 42-storey tower instead, and construction of Pace Condos could begin this spring.

 

Pace Condos Toronto

A rendering of Pace Condos, designed by Toronto’s Diamond Schmitt Architects.

 

203 Jarvis Street Toronto

April 21 2011: The northeast corner of Jarvis and Shuter Streets. The City has approved construction of a 20-storey Homewood Suites by Hilton hotel on the site, currently occupied by a surface parking lot.

 

203 Jarvis Street Toronto

February 3 2011: A planning notice posted at the 203 Jarvis Street site for the proposed Homewood Suites by Hilton hotel

 

203 Jarvis Street Toronto

April 21 2011: Looking east across Jarvis Street toward the parking lot where the 260-unit all-suites hotel will be constructed.

 

203 Jarvis Street Toronto

February 3 2011: Looking north from Shuter Street at the site for the proposed all-suites hotel. The 13-storey Grand Hotel & Suites, half a block to the north, was originally the downtown Toronto headquarters for the Royal Canadian Mounted Police (RCMP). The building was converted into a hotel in 1993.

 

203 Jarvis Street proposed hotel illustration

 This illustration, from a July 22 2010 city planning department report, depicts the south elevation of the proposed 20-storey hotel. The Homewood Suites by Hilton is being designed by Toronto’s Page + Steele/IBI Group Architects

 

203 Jarvis Street proposed hotel west elevation

 This illustration, also from the July 22 2010 city planning report, depicts the west (Jarvis Street) elevation for the proposed all-suites hotel

 

102 Shuter Street Toronto

May 8 2011: A view of the 102 Shuter Street site where the 14-storey O2 Maisonettes on George condo will be built.

 

102 Shuter Street Toronto

May 8 2011: Looking north from Shuter Street toward the proposed O2 Maisonettes condo site. This is the former location of the historic Walnut Hall heritage townhouses, which collapsed and were demolished in 2007.

 

102 Shuter Street Toronto

May 8 2011: The original proposal was for a 20-storey condo with 69 units. The O2 Maisonettes, currently in the sales phase, will be 14 floors with 50 units.

 

102 Shuter Street

July 1 2011: The O2 Maisonettes site viewed from George Street, looking west

 

102 Shuter Street

July 1 2011: Another George Street view of the O2 Maisonettes condo site, looking west toward the downtown Financial District

 

02 Maisonettes on George condo illustration

This illustration of the 02 Maisonettes on George midrise appears on the condo project website. Designed by Brian Sickle of Page + Steele/IBI Group Architects Inc., O2 is a project of Empire Communities, Identity Developments and Stal Inc.

 

02 Maisonettes on George building amenities illustration

Also from the O2 condo website, this illustration shows the layout for the building’s indoor and outdoor amenities

 

02 Maisonettes on George condo building rear view

This illustration, depicting a rear view of 02 Maisonettes, also appears on the 02 project website. The building will boast 36 two-level units ranging from 1,100 to 1,417 square feet. 

<>

Neighbours planning Saturday “lawn occupation” to protest highrise plan for Church-Isabella corner

66 Isabella Street Toronto

January 5 2012: Neighbourhood residents are planning to gather Saturday at this private green space on the northwest corner of Church and Isabella Streets to protest a proposal to build a 23-storey residential tower on the site

 

66 Isabella Street Toronto lawn occupation notice

 This notice was posted today on the private facebook group page for the Church Wellesley Neighbourhood Association (CWNA)

 

Occupy Isabella: Following on the heels of last autumn’s Occupy movement, a group of downtown residents is planning to gather at the northwest corner of Church and Isabella Streets for five hours on Saturday to protest a developer’s plans to construct a 23-storey residential highrise on the site.

As I reported in a December 14 2011 post, some residents in the Church-Wellesley area are angry that the city appears set to approve construction of a highrise addition to the 40-year-old apartment building at 66 Isabella Street. The addition — which would include 199 rental units plus 12 condominium suites in a 19-storey tower rising from a 4-storey podium — would be built on a 1,778-square-meter piece of property where a lawn and eight mature shade trees provide a private “park” atop the apartment building’s two-level underground parking garage. People in the neighbourhood are dismayed by the tower proposal because it would eliminate a sizeable, treasured green space in an area that city planners and politicians admit is sorely lacking in adequate public parkland.

 

Neighbourhood ‘green therapy’ jeopardized

“At present the lawn represents ‘green therapy’ for a wide community from as far away as Sherbourne Street and Bloor. Neighbourhood residents frequently choose to pass this corner on their way to and from work in order to enjoy the last bit of green space in an otherwise sterile landscape of steel, glass and pavement,” explains a notice posted on the Church Wellesley Neighbourhood Association facebook page today. (The CWNA’s facebook page is a “closed group” page accessible only by members who have been admitted to the group by moderators; currently, 350 people are signed up.)

Dog owners at 66 Isabella are disappointed they will lose a place to socialize while their pets enjoy the private “playground,” while tenants in 50 apartments on the east side of the building are upset that they will be forced to relocate for at least six months while their units are reconfigured to permit construction of the tower addition. “Many are seniors and have called it home for 30 plus years. Residents of the other 150 units who are already suffering deafening noise from the continuous construction of high rises on Charles Street will be exposed to another 18 months to two years of the same for 12 hours a day. Many of these residents are seniors, shift workers, home office workers or parents of small children,” the protest organizers state in the media release on the CWNA facebook page.

The organizers are calling for people to join residents of 66 Isabella in a “lawn occupation” being held from 10 a.m. to 3 p.m. on Saturday to protest the apparently imminent destruction of the lawn and trees. “The City of Toronto and East York Community Council meet next Tuesday, January 10, to decide the project’s fate. If Mohican Holdings (owners of 66 Isabella) get approval the destruction of the lawn and trees will be almost immediate,” the organizers state.

 

$450,000 for local streetscape and park improvements

The fate of the green space is indeed on the agenda for the January 10 meeting of Toronto and East York Community Council,  at which time the TEYCC will consider approving zoning amendments that would permit construction of the 23-storey tower addition. Passage of the amendments was recommended by city planners in a December 13 2011 background report about the tower proposal. “The proposed zoning by-law  amendment application is appropriate for the development of this site as it provides for a mixed-use development on an underutilized site and adds to the supply of purpose-built rental housing. The site is within the downtown core along Church Street and near the Yonge-University-Spadina subway line.  There is already a mix of residential and commercial uses along Church Street and the proposed 23-storey addition to the east side of the existing building is an appropriate and compatible land use,” the planning report notes.

However, the planners recommended that the property owner be required to pay the city “$450,000 to be used toward local streetscape and park improvements” before  it can obtain its “first above-grade building permit for the development.”

 

66 Isabella Street Toronto

A view of the 66 Isabella private green space, looking to the northeast from Isabella Street this afternoon

 

 

Accent panels on Paintbox Condo tower exterior add colour to Regent Park’s growing skyline

Paintbox Condominiums at Toronto's Regent Park

October 31 2011: Windows, cladding and coloured accent panels recently installed on the NE corner of the Paintbox Condominiums tower in Regent Park

 

Paintbox Condominiums in Toronto's Regent Park

October 31 2011: The west side of the Paintbox Condominium tower, under construction on Dundas Street East in the heart of Regent Park

 

Colour palette: Construction of the Paintbox Condominium tower has climbed above 22 storeys, leaving just four more floors to be built before the newest highrise addition to Regent Park tops off. Meanwhile, window and cladding installation is well underway on the four-storey podium plus the tower’s bottom seven floors. In fitting with the building’s name, the tower’s dark grey exterior features multicoloured, horizontal accent panels above and below the windows on each floor — adding welcome touches of colour to a once-dour district currently undergoing a massive multibillion-dollar redevelopment.

Rising at 591 Dundas Street East at the intersection of Sackville Street, Paintbox Condos is part of Phase 2 of the multi-year Regent Park Revitalization program. The redevelopment, which will see the construction of additional condo and apartment towers, plus low-rise and townhouse residence components,  commenced several years ago and could take up to 12 more years to complete.

A project of The Daniels Corporation, Paintbox will have 284 units ranging in size from 392 to 925 square feet, starting at $200,000. The building was designed by Toronto’s Diamond + Schmitt Architects. Below are more photos, taken today, showing progress on the condominium tower as well as the new Regent Park Arts and Cultural Centre under construction at its base. Photos of Paintbox Condos from earlier this year can be viewed in my July 15 2011 post, which includes a link to an online photo album showing Regent Park Revitalization project Phase 1 & 2 construction activity.

 

Paintbox Condominiums billboard

Paintbox Condo tower illustration on a Dundas Street billboard

 

Regent Park Arts & Cultural Centre

October 31 2011: Paintbox Condominiums rises above the west end of the Regent Park Arts & Cultural Centre under construction on Dundas Street East between Sumach and Sackville Streets

 

Regent Park Arts & Cultural Centre

October 31 2011: Window and cladding installation at the northeast corner of the Regent Park Arts & Cultural Centre

 

Regent Park Arts & Cultural Centre

October 31 2011: The north side of the Regent Park Arts & Cultural Centre extends along Dundas Street East

 

Regent Park Arts & Cultural Centre

October 31 2011: Paintbox tower rising at the west end of the culture centre

 

Paintbox Condominiums

October 31 2011: Window and cladding installation on the tower’s NE corner

 

Regent Park Arts & Cultural Centre and Paintbox Condominiums

Octover 31 2011: Looking up the condo from the west end of the cultural centre

 

Paintbox Condominiums

October 31 2011: Windows and cladding have been installed on the first seven floors above the four-storey condo podium

 

Paintbox Condominiums

October 31 2011: Looking up the northeast corner of the tower

 

Paintbox Condominiums

October 31 2011: Paintbox condo tower viewed looking east along Dundas Street

 

Paintbox Condominiums

October 31 2011: Lower half of the tower viewed from the north side of Dundas, just west of Sackville Street

 

Paintbox Condominiums

October 31 201: Part of the four-storey podium on the tower’s west flank

 

Paintbox Condominiums

October 31 2011: The condo tower will soar 26 storeys above the podium

 

Paintbox Condominiums

October 31 2011: Window and cladding details on the tower’s west side

 

Paintbox Condominiums

October 31 2011: More windows, cladding and balconies on the west wall

 

 

Hollywood film director slams ‘bizarre’ condo tower proposal for Yonge & Gloucester

Norman Jewison Park Toronto

A 29-storey condo tower proposed for Gloucester Street would cast shadows on Norman Jewison Park as early as 3 pm each afternoon, and would block sunlight from Mr. Jewison’s offices in the 5-storey light-brown brick building at right …

xx

18 Gloucester Lane Toronto

 … the former Rawlinson Furniture warehouse, constructed in 1878 at 18 Gloucester Lane just east of Yonge Street between Gloucester & Isabella Streets

 

No celebrity endorsement: I have attended a number of community consultation meetings the City has held in the last year to get feedback on proposed condo developments, but this past Tuesday night was the first at which one of Canada’s leading cultural icons stood up to express an opinion. And what world-renowned movie producer/director Norman Jewison had to say was anything but a celebrity endorsement for the condo tower project proposed for 2-8 Gloucester Street.

Mr. Jewison, 85, has offices in a 133-year-old building he owns immediately to the north of the potential condo development site. He told the meeting he was “amazed” that the condo proposal “has gotten so far,” because he had not even been advised that a tower might rise next door, just 3 meters from his windows.

Calling the condo plan “a bizarre idea,” Mr. Jewison expressed dismay that his building “will be completely in shade. Every single window in our building will now be looking into somebody’s bedroom. We’ll have no light. No sun. No view,” he said. “Everything is just squeezed in,” he added, referring to the compact site for the proposed L-shaped, 200,000-square-foot tower which, he said, would bring “a tremendous influx of people into this neighbourhood.”

The acclaimed director and producer of more than two dozen major Hollywood movies which have collectively received 46 Oscar nominations and won 12 Academy Awards, Mr. Jewison was among 25 people who commented on the condo proposal during the two-hour meeting.

As I have previously reported in posts on October 11 2011 and June 22 2011, a developer has applied to the City for zoning changes to permit construction of a 29-storey tower with 211 condominium units next to two heritage buildings at the corner of Yonge and Gloucester Streets. In an August 15 2011 background report, city planners identified 12 main issues with the development plan, and recommended that a community consultation meeting be held to obtain public feedback on the proposal. On September 12 2011, Toronto and East York Community Council directed staff to arrange the consultation session, and the meeting took place this past Tuesday evening at the 519 Church Street Community Centre.

Although many downtown residents and people involved in the condo development industry believe that the ultimate fate of the 2-8 Gloucester project could set the tone for further highrise projects along Yonge Street, turnout was lower than expected. I counted just over 50 people in the room midway through the meeting, but at least 15 of those were city officials, including Ward 27 Councillor Kristyn Wong-Tam, and the developer’s team of professional consultants and advisors.

Chaired by city planner Diane Silver, the meeting featured presentations by the developer’s planning consultant, Craig Hunter, and its architect, David Pontarini of Toronto’s Hariri Pontarini Architects. They led the audience through a slideshow of illustrations, renderings and photos that suggested how the proposed condo tower might look, and how it would visually and physically impact the surrounding neighbourhood.

Mr. Hunter said the developer has been working with its architects and other consultants for more than a year and half to develop its condo proposal. He said the parties realized the project had to be “sensitive” to the linear park and low-rise neighbourhood to its east, and also had to address transportation, heritage and density concerns. He called the proposal filed with the city “a very compatible fit with the existing mix of buildings in the area.”

Mr. Pontarini noted that his firm has “extensive involvement on North Yonge,” having designed the 45-storey FIVE Condos project currently under construction one block southwest of 2-8 Gloucester, as well as the 70-storey One Bloor condo tower presently being built three blocks north. Hariri Pontarini also was one of the consultants involved in the City of Toronto’s Tall Buildings Downtown Project. “We’re very interested in what’s happening along Yonge Street” and in Yonge Street historical preservation, Mr. Pontarini said, adding that the 2-8 Gloucester project “shows how development could occur along Yonge Street.”

His slide illustrations showed that the project calls for the 1878 Masonic Hall building at 2 Gloucester (a City-designated heritage building that now contains street-level retail, along with upper-level offices and condo units) to be preserved and restored, while the building at 8 Gloucester Street (listed, but not yet designated by the City as a heritage building) probably would be pushed forward closer to Gloucester at the southeast corner of the site. No decision has yet been made as to whether that building will be moved in its entirety, or dismantled and reassembled in the new location. Currently occupied by a restaurant and a nightclub, 8 Gloucester would become a “retail component” of the condo development, Mr. Pontarini said.

The condo entrance, forecourt and lobby would be situated off Gloucester Street, but the developer and architects are still considering “how to position the entrance,” Mr. Pontarini said. All service access to the condo would be from Gloucester Lane, including access to an elevator that would move cars into and out of the two-level, 34-space underground parking garage. Mr. Pontarini did acknowledge that city planners are “not happy with the transitions” that have been proposed between the tower and the two heritage buildings, and said the developer’s team will have to take another look at their design plans. “We want to do something remarkable because it [2 Gloucester] is a remarkable building,” he said.

Audience reaction to the proposal was mixed. I found it curious that several people who spoke in favour of the development used the exact same words, all saying they wanted to  “commend” the developer, and all saying they found the glass tower design “intriguing” and “interesting.” One supporter said he thought the development would be “a plus for the neighbourhood,” while another said she thinks it “will upgrade the neighbourhood and make it more beautiful,” since the project will “improve amenities” in the area. But people who voiced criticism of the development, including several Gloucester Street residents, complained that they haven’t seen any amenity improvements in the area since three major condo towers were built close by on Charles Street.

At least six people objected to the tower’s height, including several who identified themselves as members of the recently-established Church Wellesley Neighbourhood Association (CWNA). One man complained that a 29-storey tower will be “a looming force over the Yonge Street heritage strip,” while another agreed that the tower “doesn’t work with existing buildings” nearby, and “overwhelms” the two heritage buildings incorporated into the development. A third concurred that the project “breaks the context of the low-rise neighbourhood.” 2 Gloucester is “the Crown jewel of Yonge Street between Bloor and College,” he said, but the condo tower would completely “wreck” that context. And a woman who identified herself as a member of the Bay Cloverhill Community Association (BCCA) argued that the condo would be nearly three times too tall as it should be for an area characterized by so many heritage buildings. “The last best piece of heritage left on Yonge Street” is along the strip from Grenville Street to Charles Street, she said, offering the view that “Yonge Street should become a heritage street from top to bottom.” When she asked: “What could you do with a 10-storey building on the lot instead?”, Mr. Hunter replied that it was “not likely” that the developer would work toward building a shorter condo.

Pointing out that most units in the condo tower will be studios or 1-bedrooms, one Gloucester Street resident said she wanted to know “Where do families fit in?” Although the development was being “sensitive to Yonge, what about the side streets?” she asked. “What are you bringing to our neighbourhood?” She noted that, not only would the tower block Mr. Jewison’s office building views and sunlight, but studies showed it would cast shadows on the adjacent Norman Jewison Park — one of the few public green spaces in the area — as early as 3 p.m. each day. Mr. Hunter responded that it was possible some of the condo units could be redesigned in a “convertible” configuration of 2-bedroom plus den or 3-bedroom styles that would be suitable to families. As for what the developer would be doing for the neighbourhood, he said it was proposing “custom crafted” amenities. It had plans to “transform” Gloucester Lane into “a more pedestrian feel,” he said. And while he admitted that the tower would cast afternoon shadows on Norman Jewison Park he said that, with any development, “there are gives and takes.” And, he pointed out, the City’s own mixed-use designation for the site “is meant to accommodate growth.”

Several speakers weren’t critical of the condo plan per se, but of the problems that would be posed by a new building that would bring several hundred more residents into the neighbourhood without a corresponding expansion of city services and resources, especially for transportation. Even though the tower would rise along a subway line, two speakers pointed out that the Yonge subway is already stressed and overcrowded, so adding more residents to the Yonge Street strip will only make a bad problem worse. “That has to be addressed,” said one area resident who complained about subway congestion. Another said it was “incongruous” that the city would consider further intensification in the neighbourhood without balancing that off with improvements to public transit.

And in what I thought was a novel argument, one man said he thought the city must allow the tower to be built because people who will move to downtown Toronto in future years have a “right” to live in buildings such as the one proposed for Gloucester Street.

Getting back to Mr. Jewison, who was upset to learn about what he repeatedly called a “bizarre project” only after the public consultation meeting was scheduled. Mr. Hunter said he had believed someone had contacted Mr. Jewison’s family to discuss the condo development proposal, and had not received any objection to the plan. Nevertheless, he apologized to Mr. Jewison for the oversight in not contacting him directly.

Below are several photos I shot today, showing Mr. Jewison’s building and the proposed condo tower site.

 

Rendering of condo tower proposed for 2 Gloucester Street

This rendering of the 29-storey condo tower proposed for 2-8 Gloucester Street appears on a zoning application sign posted outside the building site

 

Masonic Hall heritage building at 2-8 Gloucester Street Toronto

October 14 2011:  The 1878 Masonic Hall heritage building at the northeast corner of Yonge and Gloucester Streets, viewed from the southwest. The proposed condo tower would rise to the right of the five-storey brown brick building.

 

2-8 Gloucester Street Toronto viewed from the east

 October 14 2011: Looking northwest from Norman Jewison Park toward the proposed condo tower location at 2-8 Gloucester Street

 

2-8 Gloucester Street Toronto tower location

October 14 2011:  The proposed 29-storey condo tower would be built where the two-storey building is situated. Canadian movie producer/director Norman Jewison owns the five-story building on the right, at 18 Gloucester Lane

 

18 Gloucester Lane Toronto

October 14 2011: Mr. Jewison’s building at 18 Gloucester Lane, viewed from the linear park that the City of Toronto named in the film director’s honour

 

18 Gloucester Lane Toronto

October 14 2011: Looking up the east side of 18 Gloucester Lane. The 5-storey brick building was constructed in 1878.

 

18 Gloucester Lane Toronto

October 14 2011: A street-level view of 18 Gloucester Lane, location of the offices for Mr. Jewison’s Yorktown Productions Ltd.

 

18 Gloucester Lane Toronto

October 14 2011: Looking up at the south side of 18 Gloucester Lane. The proposed condo tower would rise only 3 meters away from Mr. Jewison’s building.

 

 

Plug pulled on proposal to build 25-storey condo tower on heritage sites at Church & Gloucester

580 - 596 Church Street Toronto

August 22 2011: Heritage properties on the west side of Church Street between Dundonald and Gloucester Streets. The property owner has withdrawn plans to demolish some of the buildings and construct a condo tower in their place.

«»

Glass ‘shoebox’ shelved: Dozens of residents in the downtown Church & Wellesley neighbourhood breathed a collective sigh of relief earlier this month when a property owner formally withdrew its application to build a 25-storey condo tower on the site of several heritage properties along the west side of Church Street, between Dundonald and Gloucester Streets. The decision not to proceed with the development means, for the near future at least, that five charming brick buildings will not be either completely or partially demolished to make way for the tall glass and steel structure that had been proposed.

The heritage buildings had been threatened by a condo development plan filed with the City on April 9 2010. Property owner Church 18 Holdings Inc. wanted to build a 25-storey glass point tower with a podium ranging in size from 3 to 7 storeys. The project would have required the complete demolition of two listed heritage buildings and a 3-storey brick house built in 1909, along with partial demolition of two additional century-old buildings (also listed heritage properties) from which only the facades would have been retained.

Under Church 18’s proposal, the complex would have contained a total of 193 units, of which 158 would have been condos — in 1- and 2-bedroom configurations — and 35 would have been replacement rental apartments.  Condominium facilities and retail space would have occupied the ground level of the new building, while rental apartments would have been situated on floors 2 to 6.  Four townhouses and 10 “live-work” units would have been included in the podium.  Indoor and outdoor amenity spaces would have been provided on the top (7th) level of the podium, while condominiums would have occupied floors 8 to 25.

The development would have had a profound impact on half a dozen buildings constructed between 1873 and 1911, and would have drastically changed the look of an entire block in the area popularly known as Toronto’s Gay Village. Only one of the buildings would have remained largely intact: 580-582 Church Street, a 3-storey, Second Empire-style semi-detached house constructed in 1878 and added to the City’s Inventory of Heritage Properties in 1979. A popular restaurant location for years, the building presently is home to Fuzion Resto-Lounge and Sugo Trattoria, both of which have attractive outdoor dining terraces fronting on Church Street.  The rest of the buildings on the block would not have been as fortunate.

584 Church Street, a 3-storey detached house known as the Catherine Collard House, was built in 1909. In recent decades, it has been used for residential and commercial purposes, and is currently the home of Club 584 Salon and Spa. The building would have been demolished entirely to be replaced by the main entrance to the condominium tower.

592 Church Street is a 3-storey semi-detached building constructed in 1873. Known as the Wallace Millichamp House, it has been a walk-up rental apartment building for decades, and was listed on the City’s Inventory of Heritage Properties in 2009. Only the front facade of the building would have been incorporated into the condo complex; the rest would have been destroyed.

596 Church Street is a 3-storey walk-up apartment building constructed in Edwardian Classical style in 1911 at the southwest corner of Church and Gloucester Streets. Part of the Gloucester Mansions, it was listed as a heritage property in 2009. Immediately to its west is 69 – 71 Gloucester Street, which was constructed in 1875 as a second part of the Wallace Millichamp House (the two buildings actually are connected).  It, too, contains rental apartment units. These buildings would have been completely demolished to make way for the condo tower and its podium.

67 Gloucester Street, another part of Gloucester Mansions, is a 3.5-storey walk-up rental apartment building constructed in 1911 and added to the City’s Inventory of Heritage Properties in 2009. Only its front bay and facade would have been retained as part of the condo complex; the rest of the building would have been demolished.

The condo plan drew swift and strong disapproval from the neighbourhood, not only since it proposed the demolition and partial destruction of several beloved heritage buildings, but also because it proposed to demolish nearly three dozen affordable rental apartments, and replace them (with presumably more expensive rental accommodation) in the new building. Indeed, the proposal galvanized area residents into organizing opposition to the development, and was a key catalyst for the creation of the Church Wellesley Neighbourhood Association (CWNA) last year. More than 150 people attended a community consultation meeting that the City held last December to obtain feedback about Church 18’s proposal, and reaction was overwhelmingly negative and critical. Many in the audience applauded and cheered in agreement when one man derided the proposed condo tower as an “ugly glass shoebox.”

City planners didn’t like many aspects of the plan, either. One drew cheers and applause when he told the December meeting that he would be opposing the development because of serious concerns about its proposed height and density, among other reasons. [A May 25 2010 preliminary report by the city planning department described the Church 18 proposal — and the issues it raised — in extensive detail.]

The condo proposal took an unexpected twist that delighted neighbourhood residents during this past winter when, as I reported in my March 14 2011 post,  the developer asked the City planning department for a six-month “hold” on its development application. Then, in mid-July, residents were further buoyed when Toronto City Council voted to declare its intention to designate the six historic buildings under the Ontario Heritage Act. [An April 17 2009 planning department report explained why the properties were recommended for inclusion on the city’s inventory of heritage properties, while a separate document elaborated on the historic significance of the Willace Millichamp House at 592 Church Street.]

[“Listing” and “designation” carry different legal weight when demolition or redevelopment is proposed for heritage properties. According to an explanation on the heritage preservation page of the City of Toronto website: “Listing” a property on the Inventory of Heritage Properties allows Heritage Preservation Services to review development and building applications affecting those properties. It also requires the owner to give the City 60 days notice of his or her intention to demolish the property. “Designation” confers a legal status on a property by a specific city by-law under the Ontario Heritage Act and gives City Council the legal authority to refuse an application that will adversely affect the property’s heritage attributes. Designation may fall under one of two categories under the Ontario Heritage Act: Part IV (individual property designation) or Part V (Heritage Conservation District designation). “]

Just 12 days ago, lawyers for Church 18 advised the City that the development applications were being withdrawn. Area residents and members of the Church Wellesley Neighbourhood Association were thrilled to learn that the city had closed its files for the application, and even happier to see the project proposal signs being removed from the property several days later. However, their relief that the project isn’t proceeding has been tempered by the realization that the property owner can bring another redevelopment plan forward at any time. Unless and until that happens, the buildings will continue to grace Church and Gloucester Streets with their history, charm and character.

Below are recent photos of the Church and Gloucester Street heritage buildings.

 

580 and 582 Church Street

 580 Church Street, left, is home to Fuzion Resto-Lounge, while #582, right, is the location of Sugo Trattoria. Both restaurants have outdoor terraces.

 

584 Church Street

584 Church Street, center, is the former Catherine Collard House, built in 1909. It would have been destroyed and replaced by the condo tower entrance.

 

584 and 592 Church Street Toronto

584 Church Street, left, currently is home to Club 584 Salon and Spa, while 592 Church Street, right, has been a rental apartment building for decades

 

592 Church Street Toronto

 The Wallace Millichamp House at 592 Church Street was built in 1873. Only its  facade would have been retained if the condo plan had proceeeded.

 

Gloucester Mansions 596 Church Street Toronto

 The Gloucester Mansions apartment building at 596 Church Street was built in 1911. It would have been destroyed to make way for a condo tower

 

71 and 69 Gloucester Street Toronto

 71 Gloucester Street, left, is part of the Gloucester Mansion apartment building on the SW corner of Church Street. Number 69 Gloucester, right, is connected to the Wallace Millichamp House at 592 Church Street. Both would have been demolished if the 25-storey condo tower project had proceeded.

 

Gloucester Mansions at 67 Gloucester Street Toronto

 Only the facade of the Gloucester Mansions apartment building at 67 Gloucester Street would have been retained in the condo development plan that was withdrawn by the property owner two weeks ago

 

580 Church Street condo development proposal sign

 One of the condo development proposal signs that had been posted on the property for the past year. The signs were removed August 23.

 

 

Condo tower in the works for site of heritage office building on Dundonald St. near Yonge & Wellesley

17 Dundonald Street Toronto

August 19 2011: This office building at 17 Dundonald Street was built in 1956. Included on the City’s inventory of heritage properties, it is considered culturally significant as an early example of the Modern style of architecture.

 

Tall “cube” coming? A developer is planning a condo highrise for 17 Dundonald Street in the Yonge & Wellesley area — but the tower’s projected floor count apparently is up in the air.

People living on and near Dundonald Street say various sources — including their city councillor — have told them a new development is in the works for the property, currently the site of a 2.5-storey office building situated just a stone’s throw from the Wellesley subway station. Constructed in 1956 as the Commercial Travellers’ Association of Canada Building, the low-rise office structure was designed by the Toronto architecture firm Weir Cripps and Associates.

The building is included on the city’s inventory of heritage properties; in fact, on June 8 2010, Toronto City Council adopted an “Intention to Designate” for the property. In an April 21 2010 background report presented to city councillors and the Toronto Preservation Board, city planners stated that 17 Dundonald had “cultural heritage value” worthy of designation under the Ontario Heritage Act.  “As a small-scaled office building, the Commercial Travellers’ Association of Canada Building (1956) is an early and representative example of the Modern style with design merit that through its scale supports and maintains the prevailing character of Dundonald Street as the location of low-rise buildings,” the report explained.

The report, along with a notice of intention to designate published on the City’s website, said some of 17 Dundonald’s heritage attributes include: its “scale, form and massing”; “the near-square plan under a flat roof”; “the cladding, employing concrete, turquoise-hued glazed brick, travertine, aluminium and glass”; the organization of the building’s north facade into four bays; and the placement of the building itself, with a “small landscaped forecourt” separating it from the street. (The report provides extensive interesting information about the history and design of the building; it’s well worth a read.)

At present, 17 Dundonald is surrounded by residential properties, including the Terrace Court townhouses and low-rise condominium complex on its east side, the 24-storey Continental Tower apartment building on its west flank, and 22 Condominiums, a tower rising 23-storeys to its immediate south at 22 Wellesley Street East.

Area residents say Ward 27 City Councillor Kristyn Wong-Tam has told meetings of neighbourhood condo owners that a developer has been discussing redevelopment proposals for 17 Dundonald with city planners. Their intention, apparently, is to construct a highrise condo building in a Cubist style intended to emulate the Modernist architecture of the office building it will replace. But I’ve heard conflicting information about just how tall the building might be: 18, 19, 25 and 30 storeys are the floor counts people have mentioned. Word on the street is that a tower taller than the nearby 22 Condominiums and Continental Tower (23 and 24 storeys, respectively) doesn’t sit well with city planners, who feel too much height would be out of character for Dundonald Street. So far there has been no word on the identity of either the proposed building’s developer or the architectural firm designing it.

Below are some recent photos of 17 Dundonald and its neighbours.

 

17 Dundonald Street Toronto

 July 8 2011: Looking west along Dundonald Street toward the office building at # 17. The Terrace Court condo townhomes (left) sit to the east, while the 24-storey Continental Tower, built in 1971, rises to the west.

 

17 Dundonald Street Toronto

July 8 2011: The north and east sides of the building

«»

17 Dundonald Street Toronto

July 8 2011: The building’s cladding includes concrete, glass, travertine, aluminium and glazed brick with a distinctive turquoise hue

 

17 Dundonald Street Toronto

 July 8 2011: Two of 17 Dundonald’s neighbours include Terrace Court, an 8-storey condo and townhouse complex at 19-29 Dundonald Street (left), and the 22 Condominiums tower behind it on Wellesley Street


17 Dundonald Street Toronto

July 8 2011: The building was designed by Weir Cripps & Associates Architects


17 Dundonald Street  Toronto

July 8 2011: Looking towards 17 Dundonald from the northwest, outside the Continental Tower apartment building at 15 Dundonald Street. 

 

17 Dundonald Street Toronto

July 13 2011: A walkway between the two fences at the west side of the building links Dundonald Street to Wellesley Street and the Wellesley subway station

 

17 Dundonald Street Toronto

July 13 2011: The north facade and recessed front entrance to 17 Dundonald

 

17 Dundonald Street Toronto

July 13 2011: A city planning report says the placement of the main entrance in a recessed and glazed bay, with a protective angled canopy, is one of the building’s important heritage attributes

«»

17 Dundonald Street Toronto

July 13 2011: The driveway separates the office building from its Terrace Court condo and townhouse neighbours at 19 – 29 Dundonald Street

 

17 Dundonald Street Toronto

August 19 2011: The main entrance is set in one of four bays on the north facade

 

17 Dundonald Street Toronto

August 19 2011: The angled canopy above the double aluminum front doors

 

17 Dundonald Street Toronto

August 19 2011: The west wall of 17 Dundonald and the north side of 22  Condominiums, viewed from the pedestrian walkway linking Dundonald and Wellesley Streets alongside the Wellesley subway station

«»

17 Dundonald Street Toronto

August 19 2011: The west wall of 17 Dundonald Street catches some evening sun and reflects the Continental Tower apartment building next door

 

17 Dundonald Street Toronto

August 19 2011: There are five bays along the building’s west elevation

 

17 Dundonald Street Toronto

August 19 2011: The south wall has turquoise-hued brick at its southwest corner. Next door is the brown brick wall of the 8-storey Terrace Court condo.

 

22 Wellesley Street East Toronto

August 19 2011: 22 Condominiums rises to the south at 22 Wellesley Street East

 

22 Wellesley Street East condo tower Toronto

August 19 2011: 22 Condominiums was built by Lanterra Developments in 2007

 

22 Wellesley Street East Toronto

August 19 2011: Peter Clewes of architectsAlliance designed 22 Condominiums

 

22 Wellesley Street East Toronto

August 19 2011: Balconies at the northwest corner of 22 Condominiums

 

 

Neighbourhood Watch: Condo construction activity in downtown’s King & Bathurst area (Part 2)

Reve King West condo Toronto

July 17 2011: Rêve King West viewed from Bathurst Street. The building extends from Front Street all the way north to Niagara Street.

 

 

Three streets, five projects: Last week I profiled five different development projects in Part 1 of my Neighbourhood Watch focus on the King & Bathurst area:  Lofts 399 on Adelaide Street West, plus Victory Condos, Fashion House Condos, Six50 King West and Thompson Residences — all on King Street between Spadina Avenue and Bathurst Street. Today, Part 2 takes a look at another five projects on three separate streets in the same area.

 

Rêve King West

 

Construction is nearing completion on this midrise Tridel condominium project at 560 Front Street West between Bathurst and Portland Streets.  According to the Rêve King West website, occupancy has been tentatively scheduled for this fall. Many floorplans have sold out; however, the website indicates there is still availability for a $341,000 1-bedroom + den in 650 square feet, a 970-square-foot 3-bedroom priced from $535,000, and several “Dream Collection” suites offering anywhere from 1,030 to 1,55 square feet of living space, at prices between $590,000 and $890,000.

Even with construction winding down, I’m still ambivalent about the building’s design. Rêve does have some striking design features that I like — especially the red trim highlights on the black cladding, and the opaque white balcony panels which really make the building stand out. Yet that’s also what I don’t like about Rêve: it stands out too much.  The building’s sheer size seems completely wrong for the location since it totally dominates the block and overwhelms all of its next-door neighbours. It has an ominous, hulking appearance and, particularly when viewed from either the east or west side, looks far too big and way too black. I would hate to live in one of the townhouses at Portland Park Village and have that vast black building looming next door.

Photos of earlier stages of Rêve’s construction progress can be viewed in my April 14 2011 post and my January 21 2011 post.

 

Reve King West condo Toronto

June 21 2011: Workers install panels at the top of Rêve’s south side

 

Reve King West condos Toronto

 July 17 2011: Rêve dwarfs the Portland Park Village condo complex immediately to its east at 550 Front Street West

 

Reve King West condos Toronto

July 17 2011: Balconies on Rêve’s south facade above Front Street

 

Reve King West condos Toronto

July 17 2011: Bathurst Street view of the upper south and west walls

 

Reve King West condos Toronto

July 17 2011: Balconies along part of Rêve’s extensive west wall

 

Reve King West condos Toronto

 July 20 2011: A window on the upper south facade catches some sun

 

Reve King West condos Toronto

July 20 2011: A street-level view of Rêve’s south side

 

Reve King West condos Toronto

July 20 2011: This private driveway off Front Street leads to the lobby entrance

 

Reve King West condos and Portland Park Village condos

July 20 2011: Rêve rises only inches away from the Portland Park Village condos

 

Reve King West condos

July 20 2011:  Looking up the building’s south face

 

Reve King West condos

July 20 2011: Some balconies are still missing panels …

 

Reve King West condos Toronto

… while other parts of the exterior await their own finishing touches

 

Reve King West condos Toronto

July 20 2011 : Balconies on the south side of the building

 

Reve King West condos Toronto

July 20 2011: Looking up at the southeast corner of the building

 

Reve King West condos Toronto

July 20 2011: Ropes for swing stages dangle down the building’s south side

 

Reve King West condos Toronto

July 20 2011: Rêve’s upper northeast floors viewed from Niagara Street

Reve King West condos and Portland Park Village condos

July 20 2011: Rêve looms behind the Portland Park Village townhouses

 

Reve King West condos and Portland Park Village condos

July 20 2011: Rêve viewed from the driveway for Portland Park Village

 

Reve King West condos and Portland Park Village condos

July 20 2011: The Portland Park Village midrise building (left) and Rêve tower above the four-level townhouses nestled below

 

Reve King West condos

July 20 2011: Rêve rises above the townhouses at Portland Park Village in this view from Victoria Memorial Park

 

 

 

Condo development proposal for Front & Bathurst

 

578 Bathurst Street condo development site

July 17 2011: A proposed four-building condo development site on the northeast corner of Bathurst and Front Streets. The new Rêve King West condo building (right rear) stands immediately next door to the east.

 

A rezoning application was recently filed with the city to construct a four-building residential community with nearly 1,000 condos at the northeast corner of Bathurst and Front Streets, right next door to the new Rêve King West condos profiled above. The June 30 2011 redevelopment proposal for 578 Front Street West encompasses a group of properties with frontage on Niagara, Bathurst and Front Streets. The plan calls for a mixed-use development with 970 residential units in four buildings ranging in height from 4 to 22 stories. There would be street-level retail space, along with 960 parking spaces in an underground garage.

The site itself has an intriguing history going back more than 150 years. In the late 1800s, the land was used as a coal and wood yard, and then became home to the Doty Engine Works machinery-building plant. Bertram Engine Works subsequently acquired the property, where it manufactured engines and boilers for its nearby shipyard. For a time, it was the location of a brick press manufacturer, and during the First World War operated as a munitions factory. Over the decades that followed, the land and buildings were occupied by a variety of different businesses, including the Rock Oasis indoor climbing gym which operated there until it relocated in June. (The property’s history is outlined in extensive detail and photos in a June 21 2011 post by Toronto blogger Nathan Ng. A shorter account of Mr. Ng’s historical essay can be read in The Architourist column by Dave Leblanc in the July 15 2011 Globe and Mail.)

Below are pictures of the development proposal notice as well as recent photos of demolition activity on the site.

 

578 Front Street West condo proposal notice

 The development proposal sign on the property

 

578 Front Street West condo proposal site plan

Site plan illustration on the development proposal sign

 

buildings at 33 - 49 Niagara Street Toronto

July 17 2011: Hoarding surrounds buildings at 33 – 49 Niagara Street that will be demolished to make way for the condo development

 

buildings at 33 - 49 Niagara Street Toronto

July 17 2011: The buildings at 33 – 49 Niagara Street, viewed from Victoria Memorial Park looking west toward Bathurst Street

578 Front Street West condo development site

July 20 2011: Demolition activity at the 578 Front Street West condo development site, viewed here from Front Street looking northwest toward Bathurst Street.

 

578 Front Street West condo development site

July 20 2011: From the late 1890s until 1940, the buildings on this site were home to several different machinery manufacturing companies.

 

578 Front Street West condo development site

July 20 2011: This building was the downtown Toronto location of the Rock Oasis indoor climbing gym for 13 years until the business relocated in June.

578 Front Street West condo development site

July 20 2011: Four buildings will range from 4 to 22 storeys tall

 

former downtown Toronto Harley Davidson dealership

July 20 2011: The former downtown Toronto Harley-Davidson dealership occupies the eastern end of the proposed condo development site

 

 

Minto 775 King West

 

A project of Minto Group Inc., this development is currently under construction on a large site at the southwest corner of King and Tecumseth Streets. Designed by Hariri Pontarini Architects, the 16-storey building has a variety of floorplans for studio, 1-, 2- and 3-bedroom suites that vary in size from 542 to 1,425 square feet and in price from $356,800 to $639,800. Suites in “The Penthouse Collection” range from an 821-square-foot 1-bedroom unit costing $580,800 to an 1,866 2-bedroom going for $1,288,800. Retail space will occupy the ground level of the five-storey podium along King Street. Below are recent photos showing construction progress on the site. Further information about the building design is available on the Harini Pontarini webpage for the Minto 775 King West project.

 

Minto 775 King West condo building artistic rendering

From the Minto 775 King West condo website, an artistic rendering of the Hariri Pontarini-designed building

 

Minto 775 King West condos location

 August 23 2008:  The Minto 775 King West location before construction commenced, looking southeast from King Street toward Tecumseth Street

 

Minto 775 King West condo Toronto

July 20 2011: West view toward the condo site at King & Tecumseth Streets

 

Minto 775 King West condo Toronto

July 20 2011:  One of two cranes on the construction site, viewed here from the sidewalk on the north side of King Street

 

Minto 775 King West condo Toronto

July 20 2011: Overlooking the L-shaped excavation from the NE corner

 

Minto 775 King West condo Toronto

July 20 2011: Construction activity several levels below Tecumseth Street

 

Minto 775 King West condo Toronto

July 20 2011: Underground levels take shape near the northeast corner

 

Minto 775 King West condo Toronto

July 20 2011: Looking west from the Tecumseth Street side of the property

 

Minto 775 King West condo Toronto

July 20 2011: Walls taking shape four levels below street grade

 

Minto 775 King West condo Toronto

July 20 2011: Concrete delivery at the King Str. construction entrance

 

 

400 Wellington

 

This midrise building on Wellington Street just west of Spadina Avenue is a project of DesignSorbara, a family-owned and operated design development company. It’s essentially two buildings in one, with a 10-storey wing in front and a 12-storey section in back. The complex also blends two distinct architectural styles: The front building was inspired by the  reddish-brown warehouses in the surrounding neighbourhood, while the rear structure features  “a mid-1900s-inspired horizontal layout of windows and masonry,” according to the 400 Wellington website.

Below are construction progress photos I snapped during June and July. Photos of earlier stages of construction can be viewed in my February 27 2011 post and in my January 17 2011 post.

 

architectural rendering of the 400 Wellington condos

This artistic rendering of the 400 Wellington condo buildings appears on the condo project website

 

400 Wellington Street West condos

June 21 2011: 400 Wellington viewed from the southeast end of the block

 

400 Wellington Street West condos

June 21 2011: The front wing (left) stands 10 storeys; the rear section 12

 

400 Wellington Street West condos

June 21 2011: A closer view of the five upper levels of the rear building section

 

400 Wellington Street West condos

June 21 2011: Construction progress on the southwest side of the building

 

400 Wellington Street West condos

June 21 2011: A yellow construction garbage chute stands out against the blue insulation on the exterior wall of the front wing

 

400 Wellington Street West condos

July 17 2011: Brickwork has been installed on much of the building’s exterior

 

400 Wellington Street West condos

July 17 2011: Brickwork on the building’s southwest corner

 

400 Wellington Street West condos

July 17 2011: Street level view from the south side of Wellington Street

 

400 Wellington Street West condos

July 17 2011: Upper levels on the south side of the 12-storey wing

 

400 Wellington Street West condos

July 17 2011: Construction viewed from Wellington Street, looking northwest

 

400 Wellington Street West condos

July 17 2011: Brickwork on upper levels of the 10-storey front building

 

400 Wellington Street West condos

July 17 2011: 400 Wellington rises behind The Globe and Mail newspaper’s head office in this view from Concord CityPlace. The Globe site could become condos in several years’ time, too; the newspaper has announced it will begin construction in 2012 on a new building next door (at right, currently a Toyota dealership).

 

 

500 Wellington West

 

A project of Freed Developments, this 10-storey boutique condo building is nearing completion. Designed by Core Architects, 500 Wellington West has 17 luxury suites that occupy either half or full floors.  It’s just a short walk west of the 400 Wellington project site (above), and even closer to the Victoria Memorial Park at Portland Street.  Below are photos showing construction progress in June and July. Pictures of earlier stages of construction can be viewed in my February 27 2011 post and in my January 16 2011 post.

 

500 Wellington West condos

June 21 2011: A crew works on the exterior of the building’s south facade

 

500 Wellington West condos

June 21 2011: The building appears small from the outside, but offers incredible space inside. For example: Residence 6 offers 5,990 square feet of interior space on a full floor, along with a 975-square-foot terrace.

 

500 Wellington West condos

June 21 2011: A closer look at the crew working on the front windows

 

500 Wellington West condo

July 17 2011: Even the half-floor suites are spacious.  Residence 5 offers 3,515 square feet of interior space along with a 535-square-foot terrace.

500 Wellington West condo

July 17 2011: Glass panels will be installed on the 3 balconies seen here

 

500 Wellington West condo

July 17 2011: Floor-to-ceiling windows line three sides of the top-level suites

 

500 Wellington West condo

July 17 2011: Construction progress viewed from across Wellington Street

 

Neighbourhood Watch: Condo construction activity in downtown’s King & Bathurst area (Part 1)

Six50 King West condos Toronto

 July 17 2011: The 9-storey King Street facade of Six50 King West

 

Good fits?: They’re not skyscrapers, but the collection of low- and midrise condo buildings under construction on Adelaide, King and Wellington Streets, between Spadina Avenue and Bathurst Street, are significantly transforming the vibrant west downtown neighbourhood nonetheless. Rising above, between and behind the old brick warehouse buildings that are characteristic of the area, they’re adding contemporary style, colour and flair — along with expensive “to die for” designer penthouses — to the once-gritty and now hot & trendy district.

I manage to visit what some call the “Central King West” area about once or twice a season. I still enjoy its general look and and atmosphere, and find it’s still a comfortable area to walk around. Although some of the new buildings do appear to loom rather large next to their neighbours, they don’t seem overwhelming or out of scale for the streets. So far, at least, the area hasn’t developed the sterile and impersonal “condo canyon” feel or annoying wind tunnel conditions of Bay Street and other downtown streets that keep sprouting skyscrapers. But since some of the projects are only in early stages of construction (three are still below grade, while one is just beginning to break ground), and just as many more are in the development pipeline, it’s possible my impressions of the neighbourhood could change significantly  in several years’ time. Until then, I’m sure I’ll find it interesting to keep tracking the progress with each changing season. Below are photos I’ve taken recently of several different condo projects. Photos of additional neighbourhood projects will appear in Part 2.

 

Lofts 399 at 399 Adelaide Street West

 

A project of Cresford Developments, Lofts 399 is being built on the south side of Adelaide Street between the two Quad Lofts condos, and will sit back-to-back to the new Victory Condos on King West. My February 20 2011 post has several photos showing earlier construction progress at Lofts 399 and its proximity to the other condos.

 

artistic rendering of Lofts399 condos

From the Lofts 399 project website, an artistic rendering of how the 10-storey, 173-unit building will look when viewed from Adelaide Street.

 

Lofts 399 condo construction

July 17 2011: Looking from west to east across the Lofts 399 site

 

Lofts 399 condos on Adelaide Street West

July 17 2011: The Lofts 399 foundation begins to take shape

 

Lofts 399 condos on Adelaide Street West

July 17 2011: Looking along the south wall of the Lofts 399 site

 

Lofts 399 condos on Adelaide Street West

July 17 2011: A closer view of the bottom underground level. Lofts 399 will have four floors of below-grade parking.

 

Lofts 399 condos on Adelaide Street West

July 17 2011: Looking across the site toward Adelaide Street West

 

 Victory Condominiums on King

 

This project by BLVD Developments is approaching completion on the north side of King Street just west of Spadina Avenue. Designed by Rudy Wallman of Toronto’s Wallman Architects, the L-shaped building is 12 storeys tall and has 175 units. My March 13 2011 post and my January 15 2011 post both include photos of Victory during earlier stages of construction.

 

Victory Condos on King Street West Toronto

From the Lifetime Developments website, an artistic rendering of the Victory Condominiums on King West building designed by Toronto architect Rudy Wallman

 

Victory Condos on King West  Toronto

July 17 2011 : A street-level view of Victory Condos on King West

 

Victory Condos on King West Toronto

July 17 2011: The south side of Victory Condos, viewed from across King Street

 

Victory Condos on King West Toronto

July 17 2011:  Balconies, windows and brickwork on the south facade

 

Victory Condos on King West Toronto

July 17 2011: Victory viewed from the southwest on King Street

 

Victory Condos on King West Toronto

July 17 2011: Victory Condos offers six penthouse suites. The smallest is an 800-square-foot 2-bedroom unit with 80-square-foot balcony; it was priced at $706,900. The largest is a 2,545-square-foot residence with a 530-square-foot balcony. It carried the eye-popping pricetag of $2,219,900.

 

Victory Condos on King West Toronto

July 17 2011: Victory rises behind the brick building at 500 King Street West

 

Victory Condos on King West Toronto

July 17 2011: Victory viewed from the intersection of King & Brant Streets

 

Victory Condos on King West Toronto

July 17 2011:  Another view of Victory from Brant & King

 

Victory Condos on King West Toronto

July 17 2011: The upper four floors of south-facing balconies

 

 Fashion House Condos on King West

 

One of several Freed Developments projects in the popular Central King West neighbourhood, Fashion House Condos was designed by Toronto’s Core Architects Inc. Its red colour accents and striking design are definitely going to make a bold architectural fashion statement on the street.  As described on the project website: “a stunning 12-storey glass and steel staircase tower, the intricate platform design sets the stage for large terraces and balconies, while the glass showcases the massive floor-to-ceiling windows.” The 334-unit building is 85% sold. Photos of earlier construction progress at Fashion House can be seen in my April 2 2011 post and in my January 24 2011 post.

 

Fashion House Condos Toronto

From the Fashion House Condos website, an artistic rendering of how the building will look when viewed from the south side of King Street

 

Fashion House Condos Toronto

July 17 2011: King Street view of excavation progress at the Fashion House site

 

Fashion House Condos Toronto

July 17 2011: Looking down on the southeast corner of the construction site

 

Fashion House Condos Toronto

July 17 2011: Looking northwest across the construction site

 

Fashion House Condos Toronto

July 20 2011: Excavation progress viewed from Morrison Street to the northeast

 

Fashion House Condos Toronto

July 17 2011: Overlooking the excavation from the northeast corner of the site

 

Fashion House Condos Toronto

July 20 2011: Morrison Street view toward the south side of the excavation

 

Fashion House Condos Toronto

July 20 2011: A construction worker takes a rest on a woodpile in the pit

 

Six50 King West Condominiums at King & Bathurst

 

Another successful (80% sold) project by Freed Developments, Six50 King West is a 236-unit two-building complex with frontage on both King Street and Bathurst Street. The Bathurst wing will be the tallest, rising 15 floors, while the King section will have nine storeys. Like Fashion House, Six50 was designed by Core Architects Inc. Photos of earlier stages of construction can be viewed in my March 30 2011 post and in my January 20 2011 post.

 

Six50 King West Condos Toronto

From the Six50 King West condo project website, an artistic rendering of the two-building complex that will front on both Bathurst (left) and King Streets (right)

 

Six50 King West Condos Toronto

 July 17 2011: Street-level view of the King side of the two-building complex

 

Six50 King West Condos Toronto

July 17 2011: The glass-fronted upper floors of the King Street building

 

Six50 King West Condos Toronto

July 17 2011: Northeast view of the building during streetcar track replacement work on King Street West

 

Six50 King West Condos Toronto

July 17 2011: Northeasterly view of the upper levels of the King Street wing

 

Six50 King West Condos Toronto

July 20 2011:  Bathurst Street view of construction progress on the west wing

 

Six50 King West Condos Toronto

July 20 2011: West sides of the complex viewed from Bathurst Street

 

Six50 King West Condos Toronto

July 20 2011: The west wing will rise 15 storeys above Bathurst Street

 

Six50 King West Condos Toronto

July 20 2011: Adelaide Street view of the north and east sides of Six50 King West

 

Six50 King West Condos Toronto

July 17 2011: Balconies on the northeast side of the Six50 King complex

 

Six50 King West Condos Toronto

July 20 2011: Another view of balconies on the east side of the condo complex

 

Six50 King West Condos Toronto

July 20 2011: Balconies and windows at the northeast corner of the building

 

 Thompson Residences on King Street West

 

Freed strikes condo gold — again. Thompson Residences is yet another Freed Developments project on the Central King West strip, just a stone’s throw from its hip Thompson Hotel & condo complex that opened at 550 Wellington Street West in 2010  (and scored a coveted spot on Condé Nast Traveler magazine’s Hot List Hotels 2011). According to the project website, Thompson Residences will offer “hotel inspired living” in 314 luxury condos, lofts and penthouses “loaded with the amenities and services of a top-tier hotel” — along with access to the Thompson Hotel on the other side of Stewart Street to the south. As such, it will be the polar opposite to the former motor hotel that once occupied the site at 621 King Street West.

For this project, Freed chose Saucier + Perrotte Architectes of Montreal, whose design for the 12-storey Residences (actually, two separate buildings situated parallel to each other) is described at length in a February 18 2010 Globe and Mail column by John Bentley Mays. But Freed had to battle the City for approval to build as high as it planned. City zoning permitted a maximum height of 20 meters for the site, but the Thompson Residences buildings will stand 36 and 40 meters tall, respectively. The height dispute wound up at the Ontario Municipal Board, which sided with Freed, and now the project is proceeding.  (A short online story in the Toronto Star described the dispute and its outcome, as did a more extensive February 25 2011 Globe and Mail article available to online subscribers.)

Below are several photos showing the Thompson Residences site while the property was occupied by the condo project sales centre after the motel was demolished, and with recent pictures showing some preliminary site preparation and excavation activity.

 

Thompson Residences King Street West Toronto

From the Thompson Residences project website, an artistic rendering of the condominium, designed by Montreal’s Saucier + Perrotte Architectes

 

Thompson Residences Toronto

March 11 2010: The Thompson Residences site on King east of Bathurst Street. The Thompson Hotel complex at 550 Wellington Street stands at rear left.

 

Thompson Residences Toronto

November 23 2010: Sandwich board sign outside the showroom

 

Thompson Residences Toronto

January 14 2011: The Thompson Residences showroom reflects buildings on the north side of King Street in this view, looking east along King

 

Thompson Residences Toronto

January 14 2011: The old motel sign was re-purposed for the condo project

 

Thompson Residences Toronto

June 21 2011:  Looking west along King Street at the Thompson Residences site

 

Thompson Residences Toronto

June 21 2011: Preliminary site preparation work is underway

 

Thompson Residences Toronto

June 21 2011: An excavating machine digging at the west end of site

 

Thompson Residences Toronto

June 21 2011: Marketing signs on hoarding along the east end of the property

 

Thompson Residences Toronto

July 17 2011: Looking across King Street toward the Thompson Residences site

 

Thompson Residences Toronto

July 17 2011: Looking toward the west half of the construction site

 

Thompson Residences Toronto

July 17 2011: Excavation work continuing at the west end of the property

Thompson Residences Toronto

July 17 2011: Two excavation machines at work on the site

 

Thompson Residences Toronto

July 17 2011: The Thompson hotel and condo complex on Stewart Street is visible across the Thompson Residences site

 

Thompson Residences Toronto

July 17 2011: A mound of demolition rubble at the east end of the property

 

 

Regent Park construction continues its quick pace

40 Oaks construction at Regent Park

June 21 2011: Brilliant green Securock glass-mat sheathing panels give 40 Oaks, the Toronto Christian Resource Centre’s 87-unit affordable housing project, a bold presence in the northwest corner of Regent Park …

 

40 Oak Street Regent Park

… but by July 13 2011, the green is beginning to disappear as insulation and cladding is applied to the building’s exterior

 

One Park West  condominiums Toronto Regent Park

June 21 2011: The front entrance to the One Park West condominiums at 260 Sackville Street is still cordoned off as exterior landscaping and sidewalk installation continues …

 

One Park West condominium Toronto Regent Park

… but by July 13 2011, the landscaping and sidewalks are complete, the front entrance is open (but awaiting some finishing touches), and One Park West residents have moved into their new condos

 

Regent Park aquatic centre construction

June 21 2011: The steel frame for the Regent Park aquatic centre takes shape at the northwest corner of Dundas and Sumach Streets …

 

Regent Park Aquatic Centre construction

… and has more than doubled in width by July 13 2011

 

Regent Park development site

June 21 2011: Demolition of low-rise apartments created this large empty plot of land, seen from St Bartholomew Street looking north to Dundas Street …

 

Regent Park development site

… which is right next door (to the west) of the Paintbox Condominium highrise currently under construction (right) …

 

Regent Park redevelopment site

… but by July 13 2011, the property is buzzing with work crews …

 

Regent Park redevelopment site

… as construction begins on another new Regent Park condo highrise

 

Paintbox Condominium at Regent Park

June 21 2011: The Paintbox Condominium tower has risen to 11 storeys behind the Regent Park Arts and Cultural Centre on Dundas Street …

 

Paintbox Condominiums Regent Park

… by July 13 2011, Paintbox has climbed four storeys higher, with crews beginning to pour concrete for the 16th floor

 

Paintbox condominiums Regent Park

June 21 2011: A view of construction progress at Paintbox Condominiums from St Bartholomew Street to its southwest …

 

Paintbox condominiums at Regent Park

 … and another look at the building, standing four storeys taller, on July 13 2011

 

Glass cladding installation adds shape & sheen to new Bridgepoint Hospital being built in Riverdale

Bridgepoint Hospital in Riverdale Toronto

July 13 2011: Glass cladding gradually encloses floors of the new Bridgepoint Hospital under construction in Riverdale (seen here looking to the northeast from the Gerrard Street bridge above the Don Valley Parkway)

 

Bridgepoint Hospital in Riverdale

 July 13 2011: Cabbagetown view of cladding along the lower west wall

 

Bridgepoint Hospital in Riverdale Toronto

July 13 2011: Closer view of cladding on the lower west wall

 

Bridgepoint Hospital in Riverdale Toronto

July 13 2011:  A glass wall segment on the west side of the building

 

Bridgepoint Hospital in Riverdale Toronto

 July 13 2011:  Cladding installation on the building’s southwest corner

 

Bridgepoint Hospital in Riverdale Toronto

July 13 2011: Cladding along the south side of the building, facing Gerrard Street

 

Bridgepoint Hospital in Riverdale Toronto

July 13 2011:  Glass cladding installation in the southeast corner

 

Bridgepoint Hospital in Riverdale Toronto

July 13 2011: A cloud reflects in a panel on the south side of the building

 

Bridgepoint Hospital in Riverdale Toronto

July 13 2011: A construction worker appears to emerge from clouds as he works behind one of the newly installed glass wall panels

 

Bridgepoint Hospital in Riverdale Toronto

July 13 2011: Glass cladding installation along the east side of the hospital building

 

Glass goes on: One long-familiar city landmark is set to disappear while a notorious historical building under restoration close by is going to get a new lease on life serving a function completely different from its original purpose.  The Bridgepoint Health hospital building near the northwest corner of Broadview Avenue and Gerrard Streets has been a landmark for decades. Standing on a Riverdale hillside overlooking the Don Valley, the distinctive semicircular building has been seen daily by thousands of commuters driving up and down the Don Valley Parkway, or crossing over the valley and the Don River on either the Bloor Street Viaduct or one of the east-west bridges farther south that connects Riverdale to downtown. But construction of a new hospital building has been taking attention away from the curved structure for months — and in two years’ time, the old Bridgepoint building will disappear from the landscape altogether.

Originally established in 1860 as a House of Refuge for “incurables and the indigent poor,” Bridgepoint evolved into an institution renowned for specialized care, research and education for complex chronic disease and multiple lifelong illnesses. In the process, it outgrew its dated and inefficient building, and desperately needed to redevelop its facilities to better cope with steadily increasing demand for care and services.  In 2006, the City of Toronto approved a Community Master Plan that gave Bridgepoint the green light to construct a new 472-bed hospital facility as part of a comprehensive neighbourhood redevelopment program that will revitalize a vast swath of land northwest of the Broadview-Gerrard intersection, including the historic Don Jail and two heritage buildings nearby.

Converting the historic jail into part of a state-of-the-art health care facility is arguably one of the most intriguing elements of the Bridgepoint redevelopment. Built in 1864, the Don Jail was designed by William Thomas, the same architect who designed Toronto’s St. Lawrence Hall on King Street East at Jarvis Street. The jail was closed in 1977; a “new jail” has been operating right next door ever since, but will itself be closed and then demolished once a new detention centre has been opened in Etobicoke.  Restoration work on the “old” Don Jail started last year and is currently in full swing. According to the Preserving the Historic Don Jail information page on the Bridgepoint website, the building exterior is being restored and preserved, and will be linked to the new hospital building by a modern glass bridge. Inside, the building’s rotunda will be restored to its original splendour. The rotunda once featured a glass floor, which at some point was covered over, along with a skylight, which was similarly tiled in. Both will be uncovered during the restoration process, and the rotundra will become a publicly-accessible space for community and hospital events. “On the second level, walkways run the circumference of the rotunda and are held up by wrought-iron gargoyles (dragons and snakes). The walkways, the gargoyles and the wrought-iron railings along the walkways will all be preserved. As well, a group of cells in the basement and the gallows will be retained in their original state for historical purposes,” the website states.

When complete, the Bridgepoint campus will include the new hospital, the Bridgepoint Collaboratory for Research and Innovation,  Bridgepoint Family Health Team primary care services, and the Bridgepoint Health Foundation. Toronto firms Stantec and KPMB Architects developed the “design exemplar” for the Bridgepoint request for proposals process, while the project’s architects of record — HDR Architects and Diamond + Schmitt Architects — worked from that exemplar to develop a final design that met compliance requirements. Construction of the new  hospital commenced in 2009 and is scheduled for completion in 2013. Renovation of the Don Jail began last year and is expected to finish in 2012. Demolition of the existing hospital, along with the Toronto Jail facility to the east of the Don Jail building, is anticipated to take place between April and June of 2013.

Below are renderings of the new hospital building as they appear on the Bridgepoint website, along with photos I’ve taken showing construction progress at various stages.

 

Bridgepoint Hospital in Riverdale Toronto

September 26 2010:  Riverdale Park view of the current Bridgepoint Hospital

 

How the new Bridgepoint Health campus in Riverdale will look

This architectural rendering from the Bridgepoint Health website offers an aerial view suggesting how the Bridgepoint campus in Riverdale will look in several years with the new hospital (left), and the restored historic Don Jail (right)

 

Architectural rendering of the new Bridgepoint Hospital

This architectural rendering from the Bridgepoint website suggests how the hospital will look when viewed from the southwest on Gerrard Street

 

Architectural rendering of the new Bridgepoint Hospital

Another architectural rendering, from the project website, showing a Gerrard Street view of the new hospital and restored Don Jail

Architectural rendering of the new Bridgepoint Hospital

 Also from the project website, a rendering that depicts how the hospital will appear when viewed from the northeast, in Riverdale Park

 

Architectural rendering of the new Bridgepoint Hospital

 Above is a rendering of the hospital viewed from the east, while below …

 

Architectural rendering of the new Bridgepoint Hospital

… is a rendering showing a view of the hospital from one of the footbridges that crosses the Don Valley to the northwest of the project site

 

Aerial view of Bridgepoint hospital construction on April 27 2010

April 27 2010: From the Bridgepoint website, an aerial view of the excavation underway immediately west of the present hospital and the Don Jail

 

Bridgepoint hospital construction site

 October 27 2010: A photo I took from Cabbagetown, to the west, of three construction cranes at the Bridgepoint hospital construction site …

 

Bridgepoint hospital construction

… and, from the Bridgepoint Health website, a photo showing an aerial view of the construction site on the very same day

 

Bridgepoint redevelopment proposal sign on Gerrard Street East

Bridgepoint redevelopment proposal sign posted on Gerrard Street East

 

Bridgepoint hospital construction sign on Gerrard Street

March 27 2011 : Bridgepoint hospital construction sign on Gerrard Street

 

Bridgepoint Hospital in Riverdale

March 27 2011: Riverdale Park view of the north side of the semicircular Bridgepoint Hospital. This building will be demolished — likely in early 2013 — after the new hospital is finished and occupied.

 

Bridgepoint Health old and new hospitals

March 27 2011: Riverdale Park view of the present hospital, left, and the new facility under construction next door to its immediate west

 

Bridgepoint Health hospital construction

March 27 2011: Riverdale Park view of construction of the hospital’s north side

 

Bridgepoint Hospital off Broadview Avenue

March 27 2011: The present hospital building, seen from Broadview Avenue

 

Bridgepoint Hospital construction

March 27 2011: Construction viewed from the southwest on Gerrard Street

 

Bridgepoint Hospital construction

March 27 2011: Construction progress viewed from the parking lot situated to the southeast of the building site

 

Bridgepoint Hospital construction

March 27 2011: View from the southeast of ground floor construction progress

 

Bridgepoint Hospital construction

March 27 2011:  Construction progress on the south side of the building

 

Bridgepoint Hospital construction

March 27 2011: Looking up at the southeast corner of the new hospital building

 

Bridgepoint Health new hospital construction

March 27 2011: Parking lot view of the southeast corner of the new building (left), the present hospital (center) and the west wing of the Don Jail (right)

 

Don Jail at Bridgepoint Health

March 27 2011: Looking northeast from the parking lot at restoration activity underway on the exterior of the historic Don Jail building

 

Don Jail at Bridgepoint Health

March 27 2011: Exterior restoration work on the Don Jail’s west wing

 

Don Jail at Bridgepoint Health

March 27 2011: The central rotunda section of the Don Jail

 

Don Jail at Bridgepoint Health

March 27 2011: The Don Jail’s main entrance and rotunda will be accessible to the public for community uses and public gallery space. it also will be used for hospital events and lectures.

 

Architectural detail on the Don Jail building

March 27 2011: Architectural details on the front of the Don Jail building

 

Father Time sculpture above the entrance to the Don Jail

March 27 2011: The “Father Time” sculpture above the Don Jail main entrance

 

Upper

March 27 2011: The upper southeast corner of the Don Jail, built in 1864

 

Don Jail and current Toronto Jail

March 27 2011: The east wing of the “old” Don Jail and the adjacent “new” jail, which will be closed and then demolished once a new detention centre has been constructed in the west end of the city

 

Gerrard Street view of the Don Jail

March 27 2011:  Gerrard Street view of the Don Jail and the “new” jail (right).

 

Historic houses to be restored on the Bridgepoint property

March 27 2011: Two historic houses will be retained on the Bridgepoint property along Gerrard Street. New park grounds will enhance this area.

 

Gatekeeper house outside the Don Jail

March 27 2011: The west side of the jail’s former gatekeeper house. The building will be retained and incorporated into the new park area.

 

Governors House on the Bridgepoint Health property

March 27 2011: The former Governor’s House at 562 Gerrard Street East will be retained and restored as part of the Bridgepoint redevelopment project

 

Toronto Public Library Riverdale branch

March 27 2011: The Governor’s House sits next door to the Riverdale branch of the Toronto Public Library. The library entrance, at the northwest corner of Broadview Avenue and Gerrard Street East, is seen here.

 

Bridgepoint Hospital construction

March 27 2011:  Gerrard Street view of construction on the southwest corner of the hospital building

 

Bridgepoint hospital construction progress

March 27 2011: Bridgepoint hospital construction progress viewed from the Gerrard Street bridge above the Don Valley Parkway

 

Bridgepoint Hospital construction

March 27 2011: Hospital construction viewed from the Gerrard Street bridge

 

Bridgepoint Hospital construction progress

March 27 201: Bridgepoint Hospital construction progress viewed from from a park below the Cabbagetown neighbourhood on the west side of the Don Valley

 

Bridgepoint Health present and new hospital buildings

June 21 2011:  Riverdale Park view of the Bridgepoint Health hospital buildings

 

Bridgepoint hospital construction progress

June 21 2011: Construction progress on the south end of the new building

 

Don Jail restoration at Bridgepoint Health

June 21 2011: Exterior restoration work on the Don Jail building

 

Exterior restoration work at the Don Jail

June 21 2011 The exterior of the Don Jail is being restored and preserved. The Jail will be connected to the new hospital by a modern glass bridge.

 

Don Jail restoration work

 June 21 2011:  Restoration activity on the east wing of the Don Jail

 

Bridgepoint hospital construction progress

June 21 2011: Hospital construction progress viewed from the southwest

 

Bridgepoint hospital construction progress

June 21 2011: Construction progress viewed from the Gerrard Street bridge

 

Bridgepoint Health new hospital construction progress

July 13 2011: The new hospital rises above Gerrard Street. Below is an online album containing dozens more photos of the hospital construction.

 

Neighbourhood Watch: Photos of Bloor-Yorkville area condos and construction activity (Part 2)

Casa condominium tower on Charles Street West

May 5 2011: The 46-storey Casa condo on Charles Street West, viewed from a driveway between the Bloor Street Neighbourhood condo (left) and the St Charles Court apartment building (right)

 

Bloor Street Neighbourhood condos

May 5 2011: looking up at the L-shaped Bloor Street Neighbourhood condo tower

 

Bloor Street Neighbourhood condos

May 5 2011: Balconies on the west side of Bloor Street Neighbourhood

 

driveway betwen Bloor Street Neighbourhood condo tower and Charles Court apartments

May 5 2011: South view toward the Casa condo tower from a driveway linking Hayden Street and Charles Street between the Bloor Street Neighbourhood condo tower and Charles Court apartments

 

walkway between Charles Court apartments and Bloor Street Neighbourhood condo tower

May 5 2011: Pedestrians take a short-cut north to Hayden Street along the driveway between the Charles Court apartments (left) and the Bloor Street Neighbourhood condo tower

 

Uptown Residences and Crystal Blu condo towers

May 6 2011: A driveway just two vehicles wide is all that separates The Uptown Residences (left) and Crystal Blu Condos, new condo towers on Balmuto Street

 

Uptown Residences condo tower

May 6 2011: Construction on the exterior of The Uptown Residences is complete — except for the condo tower’s main entrance on Balmuto Street

 

Four Seasons Toronto Hotel + Residences

May 6 2011: Construction of the Four Seasons Toronto Hotel + Residences, viewed from outside The Uptown Residences

 

Four Seasons Toronto Hotel + Residences

May 6 2011: Four Seasons Toronto Hotel + Residences viewed from Balmuto Street

 

Four Seasons Toronto hotel + residences

April 30 2011: Four Seasons Toronto Hotel + Residences tower viewed from the northwest corner of Bloor and St Thomas Streets

 

Four Seasons Hotel + Residences Toronto

May 5 2011: Four Seasons Hotel + Residences Toronto construction viewed from Church Street near Park Road

 

Milan condo tower at Yonge & Church

April 23 2011: Looking south at the excavation progress for the Milan condo tower under construction at Yonge & Church

 

Milan condo tower at Yonge & Church

April 23 2011: View toward the southeast corner of the Milan condo tower excavation site, from the Canadian Tire store parking lot next door

 

Milan condo tower at Yonge & Church

April 23 2011: Deep excavation in the site’s southeast corner on Church Street

 

Milan condo tower at Yonge & Church

April 23 2011: Excavation activity near the Yonge subway line at the north side of the Milan condo tower construction site

 

Milan condo tower at Yonge & Church

April 23 2011: The Milan condo tower excavation entrance ramp off Church Street

 

Milan condo tower at Yonge & Church

May 5 2011: A view of the Milan excavation from the site’s southeast corner on Church Street, as a subway train passes the east side of the construction area.

 

Milan condo tower at Yonge & Church

May 5 2011: Church Street view through security fencing toward the northeast corner of the Milan condo tower construction site

 

Milan condo tower at Yonge & Church

May 5 2011: Looking north from Church Street toward the Canadian Tire store next to the Milan condo construction zone

 

Milan condo tower at Yonge & Church

May 5 2011: view toward the east side of the Milan site from the Church Street construction entrance ramp

 

Milan condo tower at Yonge & Church

May 5 2011: Church Street view of the Milan site, looking northeast

 

Seventy Seven Charles West condos

April 30 2011: Construction progress at the Seventy Seven Charles West condos viewed from Charles Street

 

Seventy Seven Charles West condos

April 30 2011: Seventy Seven Charles West condos viewed from the corner of St Thomas and Charles Streets

 

Seventy Seven Charles West condos

April 30 2011:  Looking south on St Thomas Street at the Seventy Seven Charles West condos

 

One St Thomas condo tower

April 22 2011: A window washer descends the south side of the 29-storey One St Thomas condo tower, which sits directly across Charles Street from the Seventy Seven Charles west condo construction site

 

One St Thomas condo tower

April 22 2011:  The cleaner works his way down the limestone-clad wall

 

One St Thomas condo tower

April 22 2011: His job perk is a view inside some of the city’s most exclusive luxury condos

 

One St Thomas condo tower

April 22 2011: The tower, which evokes highrise buildings from 1920s and 1930s-era New York City, was designed by Robert A.M. Stern Architects

 

Nicholas Residences condo construction site

May 6 2011: Hoarding is installed along St Nicholas Street and heavy machinery positioned on St Mary Street as crews prepare to demolish buildings where the Nicholas Residences condo tower will be constructed

 

Nicholas Residences condo tower construction site

May 6 2011: This building was formerly home to Regis College, the Jesuit Graduate Faculty of Theology at the University of Toronto. The interior has been gutted, and demolition of the brick exterior is imminent

 

Nicholas Residences condo tower construction site

May 6 2011: Nicholas will rise 35 storeys next to the Church of Scientology Toronto building, left, at the corner of Yonge & St Mary Streets

 

U Condos construction site

April 30 2011: Bay Street view of excavation progress at the U Condos construction site, looking northwest toward hoarding along St Mary Street. The construction crane for the Seventy Seven Charles West condo building rises behind Loretto College, the 6-storey brick building toward the upper left of the photo.

 

U Condos construction site

April 30 2011: Looking from Bay Street toward excavation machinery at the northwest corner of the U Condos construction site

 

A shoring machine on the U Condos construction site

April 30 2011: A shoring machine on the U Condos construction site

 

U Condos foundation construction

April 30 2011 A steel I-beam sunk into the ground to help shore up the huge U Condos site for excavation and foundation construction

 

U Condos construction site excavation

April 30 2011: Southward view from St Mary Street of excavation progress on the U Condos construction site

 

U Condos construction site excavation

April 30 2011 St Mary Street view toward the southeast corner of the U Condos construction site

 

U Condos construction site

April 30 2011 St Mary Street view toward the southwest corner of the U Condos construction site

 

U Condos construction site

April 30 2011 St Mary Street view toward the southwest corner of the U Condos construction site

 

U Condos construction site

April 30 2011: A shoring machine in the SW corner of the U Condos site

 

Neighbourhood Watch: Photos of Bloor-Yorkville area condos and construction activity (Part 1)

Crystal Blu condo tower and Uptown Residences Condo tower

April 30 2011: The Crystal Blu condo tower (left) and Uptown Residences Condo tower (right) soar skyward above Balmuto Street

 

High neighbours: As residents gradually move into the new 35-storey Crystal Blu condo tower at 21 Balmuto Street, buyers of luxury condos at The Uptown Residences anxiously await their own move-in dates. Exterior construction activity on the 48-floor Uptown Residences tower at 35 Balmuto has been finished for a few months, but finishing touches are underway and the front entrance is still being built. Information and photos of The Uptown Residences are provided in my March 2 2011 post about the project; below are several more pics I took of it and Crystal Blu last month.

 

The Uptown Residences condo tower

April 7 2011: A work crew applies finishing touches halfway up the west side of The Uptown Residences condo tower

 

The Uptown Residences condo tower

April 7 2011: A closer view of the workers on their swing stage

 

The Uptown Residences condo tower

April 22 2011: The Uptown Residences front entrance at 35 Balmuto Street

 

The Uptown Residences condo tower

April 22 2011: The Uptown Residences front entrance features a revolving door

 

Crystal Blu condo tower

April 22 2011: The Crystal Blu Condos front entrance isn’t 100% finished yet

 

The Uptown Residences condo tower

April 30 2011: The Manulife Centre across the street reflects in The Uptown’s shiny black and grey granite podium…

 

The Uptown Residences condo tower

…while a worker performs finishing touches on the lower southwest corner

 

The Uptown Residences condo tower

April 30 2011: A long look up the north side of The Uptown Residences

 

36 Hazelton luxury condo

April 23 2011: The 36Hazelton luxury condo project location and presentation centre opening this month at 36 Hazelton Avenue

Exclusive enclave: The presentation centre for 36Hazelton is being readied for an opening expected sometime this month. Only 18 residences will be available in the boutique condo development, which will rise seven storeys above the historic St Basil’s Catholic School at 36 Hazelton Avenue. Prices for the posh condominium suites, which will boast spacious outdoor terraces overlooking the quiet tree-lined street, range from $1.6 million to more than $10 million. See my March 26 2011 post for further information about 36Hazelton as well as numerous photos of the project site.

 

36 Hazelton luxury condo

April 23 2011: 36 Hazelton will incorporate the facade of the 83-year-old St Basil’s schoolhouse into the boutique condo building

 

The Florian Residences of Upper Yorkville condo tower

April 23 2011: Exterior brickwork and window installation on the east side of The Florian Residences of Upper Yorkville condo tower on Davenport Road

 

Florian facade fills out: Brickwork and window installation at The Florian Residences of Upper Yorkville continues to climb higher up the 25-storey condo tower. My February 12 2011 post describes The Florian project and includes numerous building photos, while my March 18 2011 post provides further construction pics. Below are several more photos from last month, along with a pic showing The Florian’s location before construction of the condo tower commenced.

 

The Florian  Residences of Upper Yorkville condo tower

April 23 2011: Another view of The Florian’s brick and glass exterior

 

The Florian Residences of Upper Yorkville condo tower

April 23 2011: A view of the western point of The Florian’s long curved podium along  Davenport Road (at the top of Bay Street)

 

The Florian Residences of Upper Yorkville condo tower location

August 14 2008: An Infinity car dealership and a Premier Fitness gym previously occupied the site where The Florian is presently under construction

 

Toronto Reference Library

April 23 2011: Toronto Reference Library new main entrance construction

Corner cube: The dramatic new entrance “cube” for the Toronto Reference Library is gradually taking form on the northeast corner of Yonge Street and Asquith Avenue. That, plus an expansion of the library’s Yonge Street facade, are among the highlights of a five-year, $34 million makeover scheduled for completion next year. Construction photos and an architectural rendering of what the library will look like post-renovation can be viewed in my January 27 2011 post; additional photos and another rendering are provided in my March 24 2011 update post. Below are several recent photos of a construction worker atop the giant steel frame for the cube.

 

Toronto Reference Library

April 23 2011: The steel frame for the library’s glass entrance cube

 

Toronto Reference Library

April 23 2011: A construction worker sits astride one of the steel beams

 

Toronto Reference Library

April 23 2011: The entrance cube will stand about three storeys tall

Toronto Reference Library

April 23 2011: The library’s website explains that the bold glass entrance is intended to encourage “a dynamic interface” between the library and the community, “connecting the interior more directly to the street.”

 

One Bloor condo tower

April 30 2011: A billboard advertising the One Bloor condo tower sales centre

 

Number One: I’m still waiting on tenterhooks, figuratively speaking, for shovels to hit the ground at the One Bloor condo tower site on the southeast corner of Yonge & Bloor. Since my January 10 2011 post, the project developer has opened a new sales centre for the much-anticipated condo skyscraper right next door to the building site, at 33 Bloor Street East. But I haven’t yet seen any preliminary construction activity on the property, which remains a rubble-strewn vacant lot. Below are some pics of it from earlier this week.

 

One Bloor condo tower location at Yonge & Bloor

April 30 2011: Colourful marketing banners adorn security fencing around the One Bloor condo tower location at Yonge & Bloor

 

One Bloor condo tower site

May 1 2011: The One Bloor Condo tower site, looking southwest toward the corner of Yonge and Hayden Streets

 

One Bloor condo tower site

May 1 2011: The One Bloor site viewed from the west entrance to the Xerox building at 33 Bloor Street East

 

One Bloor condo tower site

May 1 2011: Northwest view of the One Bloor condo tower site